To enable custom tabs on the CSM workspace record page, open UI Builder, select Page collections, and open CSM default record post-Details. Choose the entity page and open its settings. Make sure Active is ticked under Availability, and save. This action requires ui_builder_admin and exposes entity tabs after Details on the CSM default record page.
Identify the record page and entity before changing availability
The setting applies to the CSM default record page in CSM Configurable Workspace. Its purpose is to expose additional list and form views for sold product and product inventory entities. Start with the record an agent needs to work on, then identify the entity view that should be available beside its details.
For example, a request to inspect a customer’s sold products points toward Sold Products. A request involving inventory points toward Product Inventories. Account information is another example of a page available through the collection. Choose by the information the agent needs, rather than enabling several entries because their names sound related.
Write a short acceptance statement before making the change: an agent opening the selected record should be able to reach the intended entity view after Details. Include the record type and expected information. This gives the administrator and the person checking the result the same target, without requiring a broader workspace redesign.
Check the workspace name and navigation on your instance and release. Australia and Zurich name the workspace CSM Configurable Workspace in this procedure. Yokohama names it CRM Workspace. The newest release, Brazil, names CRM Workspace in its related side panel documentation, so confirm the workspace name on your instance before following the steps. The collection and availability controls described below remain the reference points for this task.
Turn on the entity tabs that sit after Details
The role required for this activation procedure is ui_builder_admin. Arrange for a user with that role to make the change. Treat this as the permission for configuring the tab; do not use it as a statement of which records an agent can read.
- Go to All inside CSM Configurable Workspace.
- Navigate to Now Experience Framework, then UI Builder. UI Builder opens its configurations in a new window.
- From the UI Builder landing page, click Page collections.
- Find CSM default record post-Details in the list of collections and open it.
- Under pages and variants, pick the entity page that should appear on the CSM default record page.
- Expand the entity, then choose its settings icon.
- Under Availability, make sure the Active check box is ticked. If it is already ticked, leave it as it is.
- Save the change.
Sold Products, Product Inventories, and Account information are examples to look for when selecting the entity page. Similar business terms can refer to different information, so a change record that says simply “enabled product tab” is insufficient for another administrator to reproduce the work.
After saving, move to a record that represents the intended agent task. The expected outcome is an enabled entity tab after Details on the CSM default record page. Check the view itself as well as its label: a visible tab is one part of the result, while access to the intended list or form is the business requirement.
Plan a focused verification using representative records
Use a small set of known records for verification. Select records whose customer and product context you understand so that you can recognize the information shown. If the test record has no meaningful product context, an empty view gives little evidence about whether the change meets the request.
Separate the checks into configuration, placement, and content. For configuration, revisit the selected entry and check that Active remains selected. For placement, inspect the area after Details. For content, open the tab and compare what appears with the entity named in the acceptance statement.
- Record the entry you changed, the workspace, the record type you tested and the observed result.
- Check that the intended entity tab is available after Details.
- Open the tab and assess whether its list or form supports the stated task.
- Have a representative agent check the result with their normal access.
Keep administrator verification and agent verification distinct. An administrator confirming the saved setting answers whether the configuration was retained. An agent completing the intended action answers whether the workspace change is usable in the working context. Record both observations instead of treating a successful save as the entire acceptance test.
For a wider review of how agents use customer and product information, see Customer Service Management best practices. Use that review to settle the workflow around the tab, while keeping this change focused on entity availability.
Investigate a missing tab without changing unrelated settings
If the expected tab does not appear, begin with the configuration you changed. Confirm that you opened CSM default record post-Details, chose the intended page from the pages and variants list, and selected the entity’s settings icon. Then inspect Active under Availability and confirm that you saved.
Next, compare the record being tested with the acceptance statement. A successful configuration change on one entry does not establish that a different record experience uses that entry. Identify the page and entity involved before changing another setting. This keeps the investigation tied to an observable mismatch.
If the tab appears but its content is unexpected, describe the difference precisely. An absent tab, an empty list, and a form showing the wrong business context are separate observations. Capture the record type, selected entity, and expected information so that the next investigation starts with evidence rather than a request to “fix workspace.”
Avoid assigning additional roles simply to see whether the symptom disappears. The activation role is known, but the tab activation procedure does not establish a blanket agent access model. Investigate the relevant access requirements separately when the configuration is retained and the agent’s result still differs from the expected outcome.
Check roles before you start the investigation. The record page procedure names ui_builder_admin only, while the related side panel procedure for the newest release lists workspace_admin, ui_builder_admin, and admin. Confirm which role the person saving the change holds. In most cases a missing role shows up as a change that cannot be saved, so a short check at the start saves a longer search later.
For other patterns that complicate configuration work, see common Customer Service Management mistakes. A clear symptom and a named configuration entry make a correction easier to assess.
Keep the change aligned with the default record experience
The CSM default record page also supports case line record pages. These include case line items, tasks, characteristics, and entitlements. This makes the record context important when planning a test: a case line item and a sold product may participate in the same service discussion while presenting different information.
A case line item page displays customer and product information alongside details such as a requested quantity change, shipping location, and estimated dates. A case line task page presents the task associated with the item. Characteristic and entitlement pages present product offering and entitlement details respectively. Use those distinctions to choose a relevant test scenario.
Tab order is a separate decision from availability. In the side panel procedure for the newest release, a new tab is added from the Tab sidebar component in the record page editor using the + Add option. It appears at the bottom of the list until someone drags it into place, and the record page must be saved afterward. Keep reordering out of the entity change, so that a request for information does not turn into a layout review.
For help planning this work, see ServiceNow implementation.
Assign responsibility for future changes to entity availability through your Customer Service Management governance model. The record should identify the reason for enabling the view, the person responsible for acceptance, and the evidence needed before considering the request complete.
Before handing the change over, ask the accepting agent to describe what they can now do from the record page. Keep that description tied to the chosen entity. If the answer is simply that another tab is visible, return to the original task and check whether the required information can actually be inspected.
Place the availability change inside the wider rollout plan rather than treating it as a standalone fix. Add it to the Customer Service Management implementation roadmap, naming who owns the change and which test scenario proves it, so the tab is judged as one piece of a finished service task.