OBLYTECH Logo
OBLYTECH Logo

Enforce role-based multi-factor authentication

To enforce role-based multi-factor authentication in ServiceNow, set glide.authenticate.multifactor to true, activate the role-based record in Multi-factor Criteria, and maintain its Multi-factor Roles list. Users assigned to listed roles must complete MFA. Check the property, criterion, and role membership together before treating the configuration as complete.

Understand what controls role-based enforcement

The setting has two connected parts. The system property enables role-based enforcement, while the criterion identifies the roles that bring users into scope. A property review without a criterion review leaves an incomplete picture. A populated role list does not establish enforcement when its record is inactive.

The property belongs to the Authentication category in System Properties. Its name is glide.authenticate.multifactor, and it accepts true or false. Setting it to true enables this enforcement mechanism; false disables role-based MFA through this property. The recommended setting is true.

The Multi-factor Criteria table, named multi_factor_criteria, holds the accompanying record. The Brazil activation configuration identifies the supplied role-based record by sys_id d427668b73003300fdbd04fbc4f6a7b6. This identifier helps distinguish the intended record during a configuration review when similarly named records create uncertainty.

Examples of roles covered by this control include admin, security_admin, and user_admin when they appear in the multi-factor roles list. Treat those names as entries to inspect, rather than assuming a privileged account is covered because its job sounds administrative. The configured list and the user’s assigned roles determine the scope.

For the wider setup sequence, use the guide to ServiceNow MFA setup and enforcement. Keep this change focused on the role-based decision within that broader authentication design.

Define the roles that need a second factor

The control exists to protect privileged accounts. Enforcing multi-factor authentication by role strengthens sign-in for the people who hold the most access, so the scope should follow privilege and not job titles alone.

Before changing the configuration, write down the intended population in terms of actual role names. A statement such as “protect administrators” needs translation into the role records that the criterion can evaluate. Ask the access owner to review the proposed list alongside the responsibilities those roles permit.

Use role-based access control in ServiceNow to frame that discussion. Access design and authentication enforcement answer connected questions: what a person may do, and what authentication requirement applies to that person’s role membership.

Prepare a short review record with three columns in your working notes: intended role, reason for inclusion, and representative test user. This is a planning aid, rather than an extra platform setting. It lets the reviewer trace a security requirement to a criterion entry and then to an observed login result.

  • Include the exact role name in the proposed scope so similar names do not obscure the decision.
  • Identify an account assigned to each role you intend to test, using approved test accounts where available.
  • Identify a comparison account that does not hold the listed roles, and record any separate authentication requirements it has.
  • Agree who will approve additions and removals before the list becomes part of routine access maintenance.

Compare the users associated with a proposed role against the population named in the change request. If they differ, ask the access owner to resolve the scope before adding that role. Resolve uncertainty about membership before saving the change, with ServiceNow user management as the related operational context.

Enforce role-based multi-factor authentication

Use System Properties to inspect glide.authenticate.multifactor. The property list is available at /sys_properties_list.do within the instance. Locate the exact property name and verify its value. Record the current property value before the approved change.

The activation guidance specifies true as the value needed for role-based enforcement. Make the property change through an account authorized to manage the relevant system property. The criterion procedure requires the adaptive_auth_admin role. Confirm separately that the account you use can also edit system properties before changing glide.authenticate.multifactor.

Next, inspect the role-based record in Multi-factor Criteria. The table list is available at /multi_factor_criteria_list.do. Verify that Active is true for the intended record. The property and this active record are dependencies of the same control, so include both values in the change review.

The record has to be active before its roles count. With the property set to true and the record left inactive, role-based MFA is not enforced, even though the Multi-factor Roles list looks complete. When Active is unselected, the criterion falls back to false, so a missing check here can pass unnoticed in a review that only reads the property.

On a freshly built instance, the role-based criterion record ships present but not active, and the glide.authenticate.multifactor property defaults to false. Check the actual values and labels on your instance and release instead of using these defaults as evidence of its current state.

Include the property value in the same change record so a reviewer can assess the two dependencies together. Continue by comparing the criterion’s roles with the approved scope.

Maintain the Multi-factor Roles list

The role required to configure role-based multi-factor criteria is adaptive_auth_admin. Use an account with that role for the following criterion-editing procedure. Have the approved role list ready so the operator can compare intended entries with saved entries.

  1. Navigate to All > Multi-factor Authentication > Multi-factor Criteria.
  2. Open the Role-based multi-factor authentication record from the list.
  3. Find the Multi-factor Roles list and review its current entries against the approved scope.
  4. To add a role, double-click Insert a new row… and enter or select the role name.
  5. Select the Save Icon to save that entry.
  6. To remove an entry, select its delete icon.
  7. Select Update after completing the list changes.

Select Update only after the list is final, because the stored roles are what the platform enforces. Save each new row before you start the next one, so that every entry you review on the reopened record was actually saved.

After saving, reopen the record and compare the stored list with the proposed list. Check for omitted roles and unintended removals. This review is especially valuable when several role names differ by a short prefix or suffix and the change was entered manually.

The platform rates this control’s security risk as medium, with a severity score of 5.7. Its stated purpose is to strengthen authentication for privileged accounts, so a missing or inactive criterion is a real coverage gap rather than a cosmetic setting. Users who newly match a listed role are prompted for a second factor at their next login, with no action on their side, so warn the account owners before a role is added to the list.

Keep role removal explicit in the approval record. Removing an entry changes the scope of this criterion, so the reviewer should understand which user population the change is intended to affect. Avoid using an authentication change to compensate for unresolved access ownership.

For help planning this work, see ServiceNow implementation.

Validate the saved configuration and login outcome

Start validation with a configuration readback. Capture the property name and value, the criterion identity and Active value, and the saved role list. Compare this readback with the approved design before testing accounts. It provides a clear basis for investigating any unexpected result.

Then use the selected test accounts to exercise login. For a user assigned to a listed role, check that the expected second-factor requirement appears. Record the account’s relevant role membership and the observed outcome together. A screenshot of a prompt alone does not show which criterion population the test represented.

Users assigned a listed role, such as admin, security_admin, or user_admin in the documented example, are prompted for a second factor at login alongside their password. Users who hold none of the listed roles are unaffected by this control, so a test account without those roles should log in as it did before the change. Record both outcomes against the role memberships you checked.

For the comparison account, document its role membership and authentication outcome as well. Another authentication requirement can complicate interpretation, so a prompt on that account does not by itself demonstrate that this role-based criterion has a wider scope than intended.

When an expected prompt is missing, investigate in a fixed order: confirm the property value, confirm the criterion is active, inspect the saved list, and verify the test user’s assigned roles. These checks follow the dependencies of the control and reduce the temptation to make unrelated authentication changes.

Keep configuration values, approved role names, test account identifiers and pass or fail results in the review record. Leave out passwords and second-factor codes.

Make the handoff specific. State which roles were approved, which accounts represented them, what was saved, and what login results were observed. Assign ongoing review to the responsible access and security owners; the guide to security roles, responsibilities, and RACI can support that ownership discussion.