OBLYTECH Logo
OBLYTECH Logo

Activate certificate-based authentication for users

To activate certificate-based authentication for users, an admin installs the Certificate-based authentication plugin, com.glide.auth.mutual. Installation adds three certificate tables. An sso_config_admin then handles authentication setup and properties, including the PIV/CAC login option. Treat installation, configuration, and a successful user login as separate checkpoints before expanding access.

Prepare to activate certificate-based authentication for users

Start by identifying the intended login journey. Certificate-based authentication supports mutual authentication with certificates issued by a trusted certificate authority. For user interface access, users can use PIV, or Personal Identity Verification, and CAC, or Common Access Card, cards to access the platform or Service Portal instead of entering a user name and password.

The same feature also supports inbound REST and SOAP requests. Record whether your change covers user logins, inbound services, or both. This matters because one of its properties enables the feature across both paths, while the visible card login option concerns the user interface. Review the broader ServiceNow authentication methods before deciding how this login route fits your access design.

Check the prerequisites on your instance and release before scheduling installation. The setup requires an ADCv2 load balancer. Certificate-based authentication is not supported on On-Prem instances or on instances with edge encryption enabled. A self-hosted instance needs the separate native certificate-based authentication procedure in the ServiceNow knowledge base before any of the steps below apply. Resolve those deployment questions before treating the remaining steps as an executable change plan.

Assign two named owners before work starts: the person installing the plugin and the person configuring authentication. The installation action requires admin. Authentication setup and property configuration require sso_config_admin. Record each assignment against its action so the handoff does not depend on someone assuming that the installation permission covers subsequent configuration.

Install the plugin and check the completion message

Perform the installation using an account with the admin role. Write the exact plugin ID down before starting; it gives the installer an unambiguous search term and helps a reviewer distinguish this authentication feature from other certificate applications.

  1. Navigate to All > System Applications > All Available Applications > All.
  2. Use the available filters and search bar to locate Certificate-based authentication. Search by the name or by com.glide.auth.mutual.
  3. Check the selected application against the planned plugin name and ID.
  4. Select Install to begin the installation.
  5. Wait for the installation completion message and record the result before moving to authentication configuration.

If the plugin is absent from the search results, pause the installation step and resolve its availability through the platform support process. A missing result does not justify choosing a similarly named certificate application. Keep the requested plugin ID attached to the issue so the next person investigates the intended component.

There is a specific installation condition when domain separation and delegated admin are enabled: the administrative user must be in the global domain. Otherwise, an error can report that application installation is unavailable because another operation is running, with Plugin Activation identifying the plugin. When domain separation and delegated admin are enabled, the administrative user must be in the global domain. Otherwise the instance shows the error ‘Application installation is unavailable because another operation is running: Plugin Activation for <plugin name>’. Confirm the admin user’s domain before retrying the installation.

Record the observed error text together with the domain context. Resolve the domain condition, then retry the installation.

Verify the three tables installed with the feature

The plugin installs sys_user_certificate, sys_ca_certificate, and sys_ca_certificate_api_track. Include these exact names in the installation acceptance checklist. They provide a concrete component check alongside the completion message and make the result easier to review without relying on a screenshot of the application search.

  • Check for sys_user_certificate as part of the installed component inventory.
  • Check for sys_ca_certificate using the exact table name.
  • Check for sys_ca_certificate_api_track as the third expected table.

Verify their presence through the instance’s application component inspection process. The acceptance question at this stage is whether the expected components were installed. Avoid using the presence of a table as evidence that certificate records have been populated correctly or that a particular user can already authenticate.

Keep installation evidence and identity evidence in separate parts of the change record. The first records the installed plugin and tables. The second records the user and certificate arrangement used for testing. This distinction helps the configuration owner investigate a later login problem without unnecessarily repeating installation work.

Plan the identity handoff alongside your ServiceNow user management process. The person responsible for the user record should be identifiable before a pilot login begins, especially when the certificate must be associated with a particular account.

Configure the authentication properties with the right role

Use the sso_config_admin role for the property configuration action. Navigate to All > Certificate Based Authentication > Properties. Read the existing values before changing them, and write down both the starting values and the intended values.

Enable certificate based authentication

Enable certificate based authentication controls the feature for user interface logins and inbound web services. Its default is true. Check the actual instance value rather than assuming that the default describes the current configuration. When working on Portal pages, use Form Layout to add the field to the form and then enable the property.

Show ‘Log in with PIV/CAC’ option in login screen

This property controls whether the login screen displays Log in with PIV/CAC card. Its default is false. A completed plugin installation therefore does not, by itself, establish that the card login choice will be visible. Check this setting explicitly when the planned user journey begins from that choice.

Enable auto-redirect for certificate based login

The auto-redirect property defaults to false. When activated, it logs the user in after selection of a registered client certificate and entry of the PIN. When deactivated, the user must also select Log in with PIV/CAC card after those actions. Choose the behavior deliberately and write the expected sequence into the pilot instructions.

Review the shared enablement property’s effect on inbound services before changing it for a user login project. Where integration authentication is also in scope, coordinate that review with the owner of Integration Hub authentication. The purpose is to account for the affected access paths before the change proceeds.

For help planning this work, see ServiceNow implementation.

Prove the user journey before expanding access

After setup, a user can self-register a PEM certificate, or an administrator can map the certificate for the user. Include the chosen approach in the pilot plan. An installation result, a configured property, and a registered or mapped certificate answer different readiness questions.

Use a small pilot with an identified user and an agreed destination, such as the platform or Service Portal. Write down the expected certificate selection, PIN entry, and any additional login selection dictated by the auto-redirect setting. Test the intended destination rather than treating a successful visit to a different interface as equivalent evidence.

Capture the outcome in enough detail to support a handoff: the user tested, the destination, the visible card option, and whether the observed sequence matched the selected properties. If the login fails, identify which checkpoint remains unproven. Return to that checkpoint with the responsible owner instead of changing several settings at once.

Keep the pilot instructions aligned with the selected user experience. For example, telling a user to expect immediate login while auto-redirect is disabled creates an avoidable support question. Review those instructions against the saved configuration before making the login route available to a wider group.

Hand over one summary containing the plugin ID, the installation outcome, the three component checks, the configuration owner, the pilot result and any open issues.

Walk through the card login sequence with the pilot user

Before the pilot user tests, confirm that a card reader is connected to the test computer and that the PIV or CAC card is inserted. The browser asks for the card PIN first. After a correct PIN, it shows a certificate selection prompt. If the certificate is valid and mapped to the user, the browser redirects to the login page. With auto-redirect deactivated, the user then selects Log in with PIV/CAC card. With auto-redirect activated, that final selection is not needed.

A user who forgets the card PIN has to contact an administrator, so note that route in the pilot instructions. Certificate registration follows a separate path. From the User Menu, the user opens Profile, selects Register client certificate under Related Links, and clicks Register once a valid certificate appears. A confirmation message states that the certificate is linked to the user account. Afterwards, Manage your client certificates in the same profile opens the User Client Certificates table, where the user can view or delete certificates tied to their account.

Finish the pilot by logging out in the documented way: remove the card from the reader, then close the browser. Writing that step into the pilot instructions keeps the test sequence complete.