To enable email OTP for multi-factor authentication in ServiceNow, set glide.authenticate.multifactor.email.otp.enabled to true in System Properties. This permits the second-factor token to be sent by email. Whether users see the email option also depends on the email factor policy and their registered factors. Test the resulting sign-in experience before expanding access.
Understand the email OTP property before changing it
The configuration name is glide.authenticate.multifactor.email.otp.enabled. It is a Boolean system property in the Authentication category. Its default value is true, while the recommended security value is false. Those values describe different things: the default describes the initial setting; the recommendation reflects the risk associated with using email as an authentication factor.
Email is a weaker MFA factor because an attacker may gain access to the mailbox used for verification. Enabling it therefore needs a reason beyond convenience. Decide which users need it, why another factor is unsuitable for them, and who will review that decision. Treat those as planning questions for your organization, rather than additional configuration requirements.
Check the current value on your instance and release before making a change. A default does not establish the value currently in use. Existing configuration and factor policy decisions also matter. The newer behavior described below includes policy evaluation, so validate the combination that applies to your environment.
Use the broader multi-factor authentication settings when reviewing how this individual property fits into the surrounding authentication configuration. Keep the change record specific: identify the email property and intended user outcome rather than describing the work simply as enabling MFA.
Enable email OTP for multi-factor authentication
Work through the property change with someone authorized to maintain system properties in your instance. Keep the scope narrow enough that a failed test can be traced to a particular change. Record the prior value before editing it, and arrange a controlled sign-in test using an account whose mailbox can be checked.
- Open System Properties using /sys_properties_list.do and locate glide.authenticate.multifactor.email.otp.enabled by its complete configuration name.
- Read the existing value and record it with the planned change. If it is already true, investigate the factor policy and registered factors before assuming the property needs another update.
- Set the Boolean value to true and save the change through the property record.
- Read the saved value again. Confirm that you changed the email OTP property rather than another authentication setting.
- Run a fresh sign-in test for the intended user scenario. Check whether the email option appears, whether the verification message arrives, and whether the user completes verification.
Keep evidence of the saved setting separate from evidence of a successful sign-in. A property record can show the intended value while a user still receives a different factor selection because of policy conditions. Conversely, a mailbox problem can interrupt verification after the factor has appeared correctly. Those observations lead to different investigations.
Do not broaden the rollout on the strength of a configuration screenshot alone. A small test should follow the actual user path from the MFA validation screen through receipt of the message and completion of verification. Record the outcome without retaining the verification code in the change record.
Check the policy conditions that control visibility
When glide.authenticate.multifactor.email.otp.enabled is false, the MFA validation screen does not present email OTP. When it is true, the email factor has additional visibility conditions. Evaluate those conditions before treating a missing email option as a failed property change.
- With an inactive email factor policy, email appears when the user has no other registered second factor.
- With an active email factor policy that evaluates to true, the email factor appears.
- With an active email factor policy that evaluates to false, the email factor does not appear.
These branches explain why two users can have different experiences under the same property value. Start with the affected user’s policy evaluation and factor registration state. Avoid comparing users merely because they belong to the same team; the relevant comparison is whether their authentication conditions match.
For a controlled test, write down the policy state and expected result before signing in. Where feasible, test the active-policy true and false cases separately. If you also test an inactive policy, use an account with no other registered second factor to exercise the stated condition. Do not infer the outcome for other combinations from that test.
Review authentication policies and factor context when the property is correct but factor availability differs between users. Keep the policy decision visible in the investigation so that repeated property edits do not obscure the actual cause.
Verify the message and the user’s completion path
Email MFA is activated by default with the Integration – Multifactor Authentication plugin, identified as com.snc.integration.multifactor.authentication. Policy inputs and conditions still need configuration. An admin can configure the instance to require email-based OTP for users attempting to sign in.
The verification message goes to the email address associated with the user. The user enters a six-digit verification code to verify identity. In your test, check that the associated mailbox is the intended destination and that the person can access it during sign-in. A successful factor selection does not establish that the mailbox is usable.
Use a short test record with separate observations: property value, policy outcome, email option visibility, message receipt, and verification completion. This makes a failed attempt easier to route. If the option is absent, revisit the visibility conditions. If it appears but the message cannot be found, investigate the associated address and email delivery path.
Ask the tester to report whether verification completed without sharing the code. Capture the stage where progress stopped and the visible result. Avoid recording a diagnosis such as “MFA broken” when the evidence establishes only that a message was not received. The narrower description helps the next administrator continue from the correct point.
Plan access continuity and a controlled rollback
Before disabling email OTP later, identify users who depend on it as their sole MFA method. They need another enrolled factor, such as an authenticator app, a hardware security key, or SMS. Without an alternative, they may be unable to finish signing in until an administrator enrolls another factor for them.
Make that dependency review part of the decision to enable email in the first place. Assign responsibility for tracking email-dependent users and for testing an alternative before removal. If SMS is being considered, review SMS factors for multi-factor authentication as a separate factor decision.
For rollback planning, record the previous property value, the reason to restore it, and the user impact that must be checked first. Restoring false can remove the email option from the validation screen. A rollback should therefore include access checks, not merely confirmation that the old value has been saved.
Keep changes to factor availability distinct from changes to the population required to use MFA. Use the MFA setup and enforcement guide for that broader rollout decision. This keeps the email change focused while giving the rollout owner a route to review enforcement separately.
For help planning the change, see ServiceNow implementation.
Questions to resolve before approving email OTP
Should a support ticket include the verification message?
Prefer a description of the failure stage over a copy of the message. Record whether the message arrived and whether verification succeeded. Keep the code out of tickets and shared screenshots so the investigation does not distribute authentication material.
What should a handover to the service desk contain?
Include the affected user group, the expected sign-in path, the test results, and the owner of policy or delivery investigations. Give the service desk a way to distinguish a missing factor option from a missing message before escalating the case.
How should an organization define rollout acceptance?
Agree on observable outcomes before testing: intended users can complete verification, excluded scenarios behave as planned, and access recovery responsibilities are assigned. Record unresolved cases explicitly rather than treating a saved property value as sufficient approval.
When should the decision to allow email be reviewed?
Choose a review point when approving the change, and revisit the decision when the original need changes. Use that review to check whether affected users can move to another factor and whether the person responsible for the exception still owns it.
What should change after a failed pilot?
Revise the part of the plan that failed: policy testing, mailbox readiness, user instructions, or access recovery. Keep the next test tied to that finding. Changing several unrelated authentication settings together makes it harder to establish whether the original issue was resolved.