OBLYTECH Logo
OBLYTECH Logo

Automate exception requests for container vulnerable items

Exception management in Vulnerability Response can automate deferral for container vulnerable items through an approved exception rule. The rule starts on its Valid from date, collects matching items into a Deferred remediation task, and stops accepting new items on Valid to. Existing items require a separate choice: Execute on existing data.

Define what the container exception should cover

Start with the condition that justifies delaying remediation. An exception rule can affect newly created container vulnerable items and items reopened from Closed to Open. One rule can defer many items in a single action, so its condition needs more scrutiny than a request for one item. Describe which findings should qualify, why remediation must wait, and what would make a finding fall outside the exception.

For example, a team may need temporary relief while preparing a replacement container image. Treat that as a planning scenario: decide what evidence supports the delay and which affected items belong together. Avoid making the condition broader simply because several teams share a remediation deadline. Similar timing does not establish that their risks have the same justification.

Keep the underlying finding visible in the decision. The vulnerable item explanation helps distinguish the finding being managed from the task used to coordinate work. For this process, the relevant records are container vulnerable items, or CVITs, and the remediation task that receives matching items.

Configure exception management before routing requests

Configuring Container Vulnerability Response exception management requires sn_vul_container.manage_exception_configuration. Go to All > Container Vulnerability Response > Administration > Exception Management. On the Exception Management Configuration form, use Manage exceptions using to choose Vulnerability Response or GRC: Policy and Compliance Management.

With Vulnerability Response selected, Duration sets the period that can be requested and Unit specifies its time unit. Review these together: a number without its unit is an incomplete duration decision. Set the permitted request period to reflect the review policy your approvers are expected to apply, then select Save after completing the configuration.

The configuration also provides Enable questionnaire to request exception and Questionnaire to request exception. The default selection is Exception Questionnaire. A questionnaire goes to the person raising the request, giving the approver more context about the reason for delay. Enable questionnaire to mark false positive is a separate option; decide whether that request type also needs supporting answers.

When the GRC integration is installed, choosing GRC: Policy and Compliance Management allows requests to specify a Policy and Control objective. Duration and Unit disappear because GRC handles that flow. Consider the policy exception process when deciding which governance route fits the request.

These behaviors apply to the Brazil release topics. Check your instance and release before making configuration changes. Starting with Vulnerability Response v15.0, exception approvals use flow designer; first deployments have it enabled by default. An existing workflow deployment can move to flow designer, but that change cannot be reversed back to workflow.

Review the rule separately from its activation date

Approving a container exception rule request requires sn_vul.exception_approver. Members of Exception approver level 1 handle level 1 rule requests, while Exception approver level 2 members handle level 2 requests. Both groups inherit the exception approver role by default. Check the assigned level as well as the person’s role when investigating a waiting decision.

In the classic environment, go to All > Container Vulnerability Response > My Approvals. Select the request in the queue, assess it, and approve or reject it with an explanation. The decision should address the rule’s condition and intended period, because the resulting automation will apply that decision to matching items.

Approval creates a remediation task in Deferred by default. The rule begins processing eligible CVITs from Valid from. Do not use the existence of a Deferred task as proof that its matching window has started. Check both the approval outcome and the start date before investigating why an expected item has not joined the task.

For the wider approval sequence, the container exception rules and approvals process is covered separately. Keep the activation review focused on what the rule will do after approval: which items it can collect, when collection begins, and when collection ends.

A rejected rule does not have to be built again from scratch. Open All > Container Vulnerability Response > Administration > Exception Rules, find the rule, and select Reopen. Reopening returns the rule to the Draft state, so its fields can be edited again. The procedure requires the sn_vul.vulnerability_admin role, which is separate from the approver role, so confirm that the person doing the reopening holds it before the work starts. Make the change the rejection explanation asked for, then resubmit the rule for approval. Resubmission sends the rule back for a new decision, so the update should answer the points the rejection raised. If the rejection concerned the justification, record the revised reason in the rule description so the approver does not have to reconstruct it from earlier comments.

Review the activation dates with the same care when you update the form. The rule starts on Valid from and stops accepting items on Valid to, so a start date left over from the rejected version will govern the resubmitted rule. If that date has already passed when the rule is approved, the rule starts processing eligible items straight away. Confirm both dates and the Deferred until date before you send the rule back for approval.

Use Valid from and existing-data execution deliberately

A rule activates on Valid from. From that point, new or reopened CVITs that satisfy its condition are deferred. A newly created matching CVIT joins the deferred remediation task associated with the rule, and the group rule does not run on that item. This changes how the item is organized for remediation, so include task membership in your checks.

Execute on existing data controls the initial treatment of the existing population. When enabled for the first run, active, non-deferred CVITs matching the condition move to the newly created remediation task and are deferred. Existing matching CVITs are added on Valid from when this option is enabled.

Decide whether the exception is intended to cover an existing backlog before activation. If it is, review the backlog against the condition and the existing-data choice together. If the intention is to handle incoming findings, record that decision so an existing item remaining outside the task is not automatically treated as an automation failure.

  1. Identify a matching existing CVIT that is active and not deferred.
  2. Identify a newly created matching CVIT for the active rule window.
  3. Identify a matching item that moves from Closed to Open.
  4. Identify an item that falls outside the condition for comparison.

Use those cases to inspect the result rather than relying on the rule record alone. For each case, note its starting state, whether it meets the condition, and the resulting remediation task. This provides a focused check of the intended scope without assuming that unrelated findings should follow the same path.

For help planning this work, see ServiceNow implementation.

Check the two end dates and investigate unexpected results

Valid to ends the rule’s intake window. The rule expires on that date, and its remediation task stops accepting new CVITs. The task continues to exist until Deferred until. These dates answer different operational questions: whether an incoming finding can join the exception, and how long the associated task remains in existence.

Review those boundaries with the remediation owner before relying on the exception. A future task date does not extend the rule’s matching window. If an incoming item appears after Valid to, investigate its normal handling rather than expecting the older deferred task to continue collecting it.

When an expected item is absent, work through a short sequence. Check approval, then Valid from and Valid to, then the condition. For an existing finding, inspect whether Execute on existing data was enabled and whether the item was active and non-deferred. For an incoming match, inspect the rule-associated task rather than assuming that a group rule should have organized it.

Keep evidence of the observed outcome alongside the review notes. Record which item was inspected and which rule condition was relevant. Describe a mismatch precisely, such as an existing finding outside the task at activation, instead of recording a general statement that exception automation failed. That gives the administrator a specific branch of the process to investigate.

Before handover, have the reviewer and the remediation owner walk through one complete example. The reviewer confirms why the condition is acceptable. The owner locates the deferred task and separates its lifetime from the intake window. Record the agreed scope, dates and treatment of the existing backlog in a short handover note.