To identify duplicate vulnerable items, use the generative AI skill in Security Exposure Management Workspace to create a deduplication job, select its scope, and review the proposed pairs. The skill identifies a primary, first-found vulnerable item for a configuration item and flags scanner-imported duplicates so reviewers can decide which records to close.
Separate repeated scanner findings from separate vulnerabilities
Two scanners can report the same vulnerability on the same asset and create separate vulnerable items. That leaves remediation owners with records that appear to require separate work. Deduplication helps establish which record represents the continuing vulnerability and which record repeats that exposure. Start with the relationship between the asset, the vulnerability, and the imported findings, rather than a count of records with similar names.
A shared configuration item is a reason to compare records, not sufficient evidence that they describe the same problem. Before confirming a pair, inspect what the two vulnerable items represent. A record for a different vulnerability should remain distinct even when the asset and scanner descriptions look similar. The vulnerable item explanation provides the record context for that comparison. If your team cannot establish whether the records refer to the intended configuration item, resolve that uncertainty before accepting the pair.
For the underlying asset model, see configuration item definitions. Treat that identity check as a review discipline rather than a claim that the deduplication skill repairs the CMDB.
Check access before you identify duplicate vulnerable items
The Brazil workflow uses the ServiceNow Otto panel, which must be activated. The skill is enabled by default for appropriate application users, while available features depend on licensing. Check the release your instance runs before following the navigation below, because the menu paths differ between releases.
Access is divided by action. Give the person doing the work the role needed for that action rather than assuming that access to a workspace also permits running jobs or confirming results.
- View the Vulnerable item deduplication module: sn_vul_ai.now_assist_user.
- Create deduplication job configurations: sn_vul_ai.configure_vi_dedup.
- Run deduplication jobs: sn_vul_ai.run_vi_dedup_job.
- Review duplicate job records: sn_vul_ai.review_duplicate_vi.
The sn_vul.vulnerability_admin and sn_vul.vulnerability_analyst roles inherit these roles when the ServiceNow Otto for Unified Security Exposure Management application is installed. Check the specific action that fails when troubleshooting permissions. A missing run control and an inability to create a configuration involve different roles and should not be treated as the same access problem.
Build a job around records you can evaluate
Open Workspaces > Security Exposure Management Workspace and select the ServiceNow Otto icon in the left navigation panel. Expand Vulnerable item deduplication if necessary. The Otto page has three tabs: All job configurations, All jobs, and All duplicate reviews. Start with a configuration so the intended selection is set before processing starts.
- Select New to create the job configuration. Enter a distinct Title that will help reviewers recognize its purpose later.
- Use Set conditions to filter the vulnerable items included in the review. Begin with a scope whose configuration items and scanner findings your reviewers understand.
- Check the matching count displayed after setting the conditions. A scope that is broader than expected deserves attention before the job runs.
- Select View matching results. Inspect the summary, configuration items, and risk ratings in the Condition modal to check that the selection fits your intent.
- Choose whether to enable Email notification, then select Save when the selection is ready.
A deduplication job has to exist before anything else happens, so the saved configuration is the starting point for every later step. A typical condition reads Configuration item contains server-based VIs, and the Set conditions link updates its matching count as you adjust the filter. Use that count to rename the job so the title reflects the records it actually selected.
Start with a narrow scope that reviewers can inspect record by record. A narrow first run separates two kinds of disagreement: an incorrect scope and an incorrect duplicate decision. Widen the scope only after the team agrees what a correct result looks like.
Record why you chose the conditions in your team’s review notes. The job title should identify the scope, while those notes can explain the decision behind it. This gives the next reviewer something more concrete than a job number when deciding whether a result belongs in the intended review.
Run the job and inspect completed results
After saving, the Run job button becomes available to users with sn_vul_ai.run_vi_dedup_job. Open Otto > All job configurations, choose the record through its Number, and initiate the run. The job executes in the background. Use View progress to inspect its status instead of treating the initial background message as completion.
The Check vulnerable item deduplication job completion job starts after the run is initiated. A separate job checks active jobs for completion every 30 minutes. That interval describes a completion check; it should not become a promised processing time for your selection. Wait for successful completion before interpreting the absence of reviewed pairs as a meaningful result.
If the Run job button does not appear on a saved configuration, check for the sn_vul_ai.run_vi_dedup_job role before assuming the configuration is at fault. Reviewing duplicate records needs sn_vul_ai.review_duplicate_vi, so a user who can run a job may still be unable to confirm or reject a pair.
To evaluate the output, open Otto > All jobs, choose the JOB# record, and open the Duplicate Vulnerable Item Reviews related list. A DUP# record provides the side-by-side comparison. Open the linked VIT# records when you need the underlying details to judge whether the proposed pair represents one vulnerability or separate issues.
Make the duplicate decision and verify its effects
A proposed pair starts in Needs Review. Read Confidence alongside Reason, which explains why the pair was considered duplicate. Compare the primary and duplicate information under Vulnerable item details, including First found. The primary record typically carries the earlier First found date. Use that chronology with the vulnerability details, rather than accepting the older record without examining what it represents.
Select Mark not duplicate when the pair represents distinct vulnerable items and at least two unique vulnerabilities. The DUP# record changes to Not Duplicate, and the pair is excluded from duplicate consideration in jobs created afterward. Make that decision deliberately because it affects later identification as well as the current review.
Select Confirm duplicate when the comparison supports consolidation. The VIT labeled Duplicate changes to Closed, receives a work note with close notes, and has its associated detections moved to the primary VIT. The primary also receives work notes describing the duplicate closure and linked detections.
After confirmation, check the closed record, the primary record, and the transferred detections together. Closing the duplicate is a consolidation action; it does not demonstrate that the underlying vulnerability has been remediated. Keep the surviving record’s operational follow-up aligned with your vulnerable item lifecycle.
Teams planning a wider rollout can compare their scope with the ServiceNow implementation service.
Keep automatic closure under deliberate control
The sn_vul_ai.duplicate_vi_confidence_threshold system property controls automatic processing. Its default has no confidence threshold value, so it closes no duplicates automatically. A populated value allows pairs with scores greater than that threshold to close automatically and roll their detections into the primary vulnerable item. The comparison is greater than the value entered, not an assumption that equality qualifies.
Changing this property requires sn_vul_ai.configure_vi_dedup or sn_vul_ai.review_duplicate_vi. Leave the value empty while establishing how reviewers interpret the pairs. Before enabling automatic closure, assess cases that were accepted and cases that were rejected, with attention to whether the primary record retained the intended evidence. A threshold should reflect observed review quality rather than a desire to reduce the queue quickly.
Keep this AI review workflow distinct from scanner-based duplicate handling on remediation tasks. Show Duplicate VIs identifies duplicates across scanners where the vulnerability combination uses CVEs. The listed combinations include CVE and CVE with a third-party entry. A result from that route should not be interpreted as the same review record or closure action described above.
Answers to common questions about deduplication results
Does a confidence score of 100 mean the language model is certain?
No. A score of 100 comes from deterministic matching logic rather than calculation by the Now Assist skill. When evaluating that score, recognize the matching mechanism behind it instead of describing it as a model certainty judgment.
What does a completed job’s email notification contain?
When Email notification is selected, the completion email reports duplicate vulnerable items found, total vulnerable items processed, and impacted configuration items. Review duplicates opens the workspace list. The Show notifications bell also provides messages about completed jobs.
Can remediation tasks refresh scanner duplicates automatically?
Starting with version 17.1, creating a remediation effort can include Automatically refresh duplicate vulnerable items for the created remediation tasks. Select that option for the refresh behavior during effort creation. It belongs to the remediation task workflow rather than the AI job configuration steps.