The Veracode vulnerability integration imports application scan findings into Application Vulnerability Response after its prerequisites, installation, and configuration are complete. Prepare CWE data and API credentials, install the integration, select the finding types and filters, then test credentials before running imports. Validate the run records and resulting application findings before relying on the imported data.
Prepare the Veracode vulnerability integration before installation
Start with the receiving application and the data it needs. Application Vulnerability Response uses the Common Weakness Enumeration integration, which should be running before you install and configure Veracode. CWE is installed with Vulnerability Response by default. NVD data can enrich the results, but it is not a prerequisite for installing this application integration.
Check that Vulnerability Response is installed and activated. Subscription Management > Subscriptions displays the subscriptions purchased by your organization. The Veracode integration application is a separate subscription. Production installation includes the entitlement process; nonproduction and development downloads do not require that entitlement step. Review the requirements and dependencies for the application you intend to install.
Assign responsibilities before handling credentials. The system administrator with the admin role installs the application and assigns users to the App-Sec Manager group. That group handles configuration and verification. Preparation also requires the App-Sec Manager group. Keep the configured integration run-as user at its default value, VR.System.
Estimate how many application vulnerable items you expect to import and validate instance sizing against that volume. An undersized instance can produce long load times. Include both the initial backlog and the expected ongoing finding volume in your planning. Record that estimate so a slow first import can be assessed against an agreed scope.
For the supporting data preparation, see NVD and CWE imports and third-party libraries. Keep that foundation separate from deciding which Veracode findings should enter the application workflow.
Install the application and prepare API credentials
With the admin role, sign in to the intended instance and locate Vulnerability Response Integration with Veracode in the ServiceNow Store. Open its application tile and review Other Requirements and Dependencies. Confirm the destination instance before requesting the application, particularly when production and development environments have similar names.
- Select Request App and provide the Now Support login credentials.
- Select Get, enter Instance Name and Reason for the Instance, then select Validate Instance.
- Select Request and follow the installation instructions received for that request.
- Navigate to System Applications > Applications, locate the application, and select Install.
For credential preparation, use the Veracode Platform user account menu to open API Credentials and select Generate API Credentials. Retain the API ID and API key for the configuration step. Treat successful application installation and successful credential validation as separate acceptance checks: installing the package does not establish that the configured credentials work.
After installation, verify that the integration application is installed and activated as well as the underlying Vulnerability Response application. This gives the configuration owner a clear handoff: the receiving application is available, the integration is present, and credentials are ready to test.
Choose findings, filters, and import-time state handling
A member of the App-Sec Manager user group opens All > Veracode Vulnerability Integration > Configuration and enters API ID and API Key. Match the controls to the installed versions on your instance: the options below include behavior introduced across Veracode integration versions 4.0 through 4.3 and Vulnerability Response version 19.0.
Select DAST, SAST, or both; at least one of those testing types must be selected. Select SCA when Software Composition Analysis vulnerabilities belong in the import scope. Include Manual brings in manual penetration testing results and creates application vulnerable items for those findings. Those imported manual findings are not linked to penetration test assessment requests configured in Application Vulnerability Response.
Use Severity level when the import should collect specific Veracode severity values. Multiple values can be included. A populated severity filter limits collection to matching values, so record the selected values alongside the expected results. Otherwise, a finding excluded deliberately by the filter can look like an import failure during validation.
Decide who owns the treatment of exceptions and false positives. Manage exceptions in ServiceNow and Manage false positives in ServiceNow are activated by default. With these options activated, source states that would normally map to Deferred or the relevant closed false-positive outcomes instead map to Open for ServiceNow triage. Exception requests and false-positive requests are both started from the imported application vulnerable item record.Deactivating either option preserves the corresponding imported state mappings rather than using that ServiceNow workflow. The items map to Target and Target reason states, and the associated Request exception and False Positive actions are not visible on AVITs. Review this decision with the people who will triage the imported work.
For version 4.3 settings, select API region and review API timeout, whose default is 30K. Include SBOM vulnerabilities applies only when SBOM Response is installed. When it is cleared, Veracode vulnerabilities are not parsed from uploaded Veracode SBOM files.Select Save and Test Credentials and address any displayed error before moving to execution. For help planning this work, see ServiceNow implementation.
Run imports in sequence and preserve their dependencies
The App-Sec Manager group can initiate a manual import from All > Veracode Vulnerability Integration > Integrations. Choose an integration, such as Veracode Application List Integration, and select Execute Now. Use this when the initial import failed or when waiting for its scheduled run is unsuitable. Scheduled imports resume after the manual import completes.
Preserve the integration sequence. The application list feeds scan summaries, and scan summaries feed application finding imports. Running integrations out of order can leave incomplete data. The JSON application-list and scan-summary integrations are inactive by default; check their activation rather than assuming installation means the full import chain is already running. XML integrations are deprecated.
For scheduling changes, the App-Sec Manager group selects an integration, adjusts Start time, and selects Update. The application list default is 00:00:00 in local time. Other integrations are On Demand and chained after the application list; changing their start times requires advanced expertise. Agree on the first validation window before changing the daily schedule.
The broader Vulnerability Response workflow provides the operational context for the imported records. For this integration, the immediate acceptance point is narrower: the selected source data must arrive through the expected chain with the intended state treatment.
Validate run results and transformed application findings
The App-Sec Manager group checks results under All > Veracode Vulnerability Integration > Integrations. Select an integration and open the Vulnerability Integration Runs related list. Verify that the imports succeeded. Network interruption and corrupted data during transfer or transformation are documented failure causes; Execute Now can rerun an integration after those conditions are addressed.
Separate retrieval from transformation during investigation. API data first enters Veracode AppVul Item Import [sn_vul_veracode_appvul_item_import], then Veracode AppVul Item Transform processes it. System Import Sets > Transform Maps provides the map. Its onComplete script updates created, updated, and unchanged AVIT counts; that internal script should not be modified or deleted.
Inspect representative records against the source selection. Application ID maps to source_app_id, issueid to source_avit_id, and build_id to source_scan_id. Static flaws use the source path and file for location, while dynamic flaws use the source URL. These distinctions help explain why two testing types can produce different location details without indicating a broken import.
The App-Sec Manager group can also open Veracode records in Application Vulnerability Scan Summaries [sn_vul_app_vul_scan_summary_list]. Personalize the list to inspect relevant measures such as Static scan size, Third party library count, Last SCA scan date, and Scan published date. Compare the measures relevant to the selected testing types rather than treating unrelated columns as mandatory evidence.
Questions for the Veracode integration handoff
Can source-state filtering include closed findings without creating closed items?
Yes. The status integration parameter accepts Open or Closed; leaving it empty imports both. Separately, closed items are not created by default. An admin can set sn_vul.create_closed to True when creating those records is required. Treat retrieval scope and record creation as separate decisions.
Can the import distinguish policy and sandbox records?
The App-Sec Manager group can modify policy_sandbox on the Integration Instance Parameters tab for the Veracode Application Vulnerability source instance. The policy_rule_passed parameter also accepts true or false. Document these selections in the handoff so validation uses the intended test population.
Does a long-running queue necessarily mean processing has stopped?
No. From Application Vulnerability Response version 18.2.4, processing heartbeats update Last Record Processed. When an entry exceeds the one-hour limit, the system also checks whether that timestamp is older than one hour before treating the entry as stuck. Review processing evidence before diagnosing a stalled import.
Can analysts retrieve more detail after the initial import?
From integration version 4.2, Get More Details on Veracode-sourced AVITs can retrieve DAST request and response information and solution recommendations. This supports investigation after acceptance. That follow-up work is easier to plan once the acceptance checks above have passed.