Before Tenable scan results can drive remediation, the integration has to authenticate, import application context and import findings, and each step needs its own check. For Tenable Web Application Scanning, configure API keys in Setup Assistant, import application assets, and then import findings. Validate both the integration run and the resulting records before treating the imported data as ready for remediation.
Choose the Tenable vulnerability integration for your data
Begin with the source of the scan results. Tenable Web Application Scanning uses application and finding imports. Tenable.io and Tenable.sc use asset, plugin, and vulnerability import configurations. Selecting the right integration determines which credentials, filters, destination records, and checks belong in your implementation plan.
For an application security team, the immediate objective is to retrieve application context alongside vulnerability findings. Application records help identify what was scanned; findings carry the issues that require investigation.
For host scanning, define the asset population and vulnerability scope before enabling a recurring schedule. The broader Vulnerability Response workflow provides the context for turning scanner results into remediation work. Keep the initial integration acceptance criteria focused on authenticated access, the chosen population, and correctly processed records.
The settings below reflect Brazil behavior. Check the installed application version and your instance before applying version-dependent permissions or configuration choices.
Establish API key authentication for Tenable WAS
Start with a configured Tenable.was Integration Instance in Setup Assistant and an API Access Key and Secret Key generated in Tenable. Keep the credentials available through your approved administrative process. Avoid placing key values in test notes, screenshots, or issue descriptions used to coordinate the rollout.
- Navigate to Setup Assistant > Scanner Integrations > Tenable.was.
- Enter Account Name and Instance URL for the intended Tenable account.
- Populate Access Key and Secret Token with the corresponding API credentials.
- Save the Configuration.
- Check the authentication result before starting imports.
The connection check sends a GET /session request to Tenable.was. A successful response returns a session object that establishes connectivity and permissions. A successful connection proves credentials and reachability only. Acceptance depends on the application and findings imports completing.
If authentication fails, compare the account, instance address, and credential pair with the intended environment. Correct the connection details before changing import scope. Otherwise, an authentication problem and a filter problem can become mixed together, making it harder to establish why records are absent.
Import applications before validating WAS findings
Use an initial application import to establish the asset side of the WAS data flow. The integration retrieves application assets through the Assets Export APIs and creates import queue entries for transformation. Your check therefore needs to extend beyond starting the request.
- Navigate to All > Tenable WAS Vulnerability Integration > Administration > Integrations.
- Select the application integration, such as Tenable.was Application List Integration.
- Select Execute Now.
- After completion, inspect Discovered Applications [sn_vul_app_release].
- Review the integration run status and compare a sample of imported applications with the intended source population.
Review Lookup strategy on the Third Party Integration [sn_sec_int_integration] configuration when application identification needs attention. The default value follows the system-wide setting. The cmdb_ci value forces CI Lookup/Scanned Application, while cmdb_model forces Product Model. Existing integrations retain their behavior until you change their configuration.
Choose the strategy deliberately rather than switching it to make an unexpected count disappear. Record which identification approach the application team expects, then inspect representative applications against that expectation. For background on staging and transformation concepts, see data migration and import sets.
Next, return to the WAS Integrations list and select the findings integration, such as Tenable.was Vulnerabilities Integration. Select Execute Now to retrieve findings through the Export Findings APIs. After completion, inspect Application Vulnerability Entries, Scan Summaries, and Application Vulnerable Items (AVITs). Review run status to establish whether all finding chunks processed successfully.
A sound acceptance sample connects the application context to its findings and resulting AVITs. Record the application and finding identifiers used for the check, along with the run being assessed. This gives the scanner administrator and application security team a shared basis for investigating mismatches without exposing authentication material.
Configure host imports with explicit permissions and scope
For the Tenable Vulnerability Integration, installation requires System Admin (admin). Configuration lists Vulnerability Admin (sn_vul.vulnerability_admin), or the deprecated sn_vul.admin, and Configure Integration (sn_vul_tenable.configure_integrations). Keep those configuration permissions separate from the roles used later to request rescans.
Navigate to All > Vulnerability Response > Administration > Setup Assistant > Integration Configuration > Scanner Integrations. Select Edit beside the intended Tenable integration. Supply the account name, Instance URL, and credentials for that deployment. Tenable.sc requires Security Analyst or Manager access. From Tenable.sc v5.13, authenticate with Access and Secret Keys using API Key Authentication. Earlier versions of Tenable.sc use ServiceNow user name and password authentication instead. Tenable.io requires Administrator access with a permission attribute of 64 or higher. Starting with version 3.8 of the integration, a basic user with permission attribute 16 can also access the product.
For Tenable.sc, select a configured MID Server when the platform instance and scanner deployment require that route. If connection errors appear, verify credentials and Instance URL before investigating downstream records. Complete the connection configuration with Next, then work through the import forms.
In Asset Import Configuration, decide whether the import is active, set its initial date, and schedule it. Review CI Lookup rules to understand how imported assets identify CMDB configuration items. Import Assets Now starts an on-demand asset import. In Plugins Import Configuration, configure the plugin import and use Import Plugins Now when an immediate run is needed.
In Vulnerabilities Import Configuration, set the initial date and retrieval conditions. Use Import Schedules to configure ingestion frequency. For Tenable.io, Severity filters restrict vulnerabilities and associated VIs. For Tenable.sc, the selected Tenable Query also restricts the Assets Integration to assets with matching vulnerabilities. Finish saves the completed Setup Assistant configuration.
For help planning this work, see ServiceNow implementation.
Check retrieval settings before widening the import
Navigate to Tenable Vulnerability Integration > Integration Instances and open the relevant deployment. Integration Instance Parameters exposes the parameters; Vulnerability Integrations provides schedules, REST Details, integration details, Data Sources, and run information. Review these together when explaining a difference between scanner counts and imported counts.
- For Tenable.io, severity_critical and severity_high default to true; severity_medium, severity_info, and severity_low default to false.
- The insert_fixed flag creates new VIs for Fixed detections that do not already have VIs in the instance.
- For Tenable.sc, query filter IDs come from queries configured in the Tenable console and can be selected in Setup Assistant or Integration Instances.
- For Tenable.sc, async_request controls asynchronous versus synchronous API calls and applies across its integrations once enabled.
Compare counts within the same severity, date, deployment, and query boundaries. Expanding severity coverage while changing the historical start date makes a count increase difficult to interpret. Prefer a controlled first run, followed by one deliberate scope change and another record sample.
When adjusting history, open an integration under All > Tenable Vulnerability Integration > Administration > Integrations, select Integration Details, and change Start time. Run it again with Execute Now only where the integration record provides that action. A large historical window produces large payloads per import queue entry. Each entry has a one-hour processing limit, so a backfill can report an integration timeout while the run continues processing. Plan the backfill separately from routine ingestion.
Before accepting recurring ingestion, retain a short reconciliation record: the integration instance, selected filters, run completion result, and examples of destination records. Assign an owner to investigate missing chunks separately from unexpected identification results. This makes subsequent configuration changes reviewable and gives the next operator a clear starting point.
Questions about accepting and operating Tenable imports
Does importing Tenable findings replace vulnerability reference data?
Scanner findings and vulnerability reference information serve different purposes. Keep the reference-data plan visible alongside scanner ingestion. The guide to NVD, CWE, and third-party library data covers that neighboring work.
Should an unused calculator remain active during an initial host import?
Review unused calculators before the initial load. Deactivating a calculator requires the admin role. Navigate to All > Vulnerability Response > Administration > Vulnerability Calculators, open the default calculator, clear the Active check box, and select Update. Calculators run each time a vulnerable item is created or updated, so deactivating unused ones can improve initial import performance.
Can a targeted rescan immediately prove that imported items are fixed?
Rescanning and importing updated results are separate steps. For Tenable.io and Tenable.sc, updated Closed/Fixed results arrive through the next scheduled Fixed Vulnerabilities Integration import. Requesting rescans requires sn_vul.write_all or sn_vul.write_assigned; scanner activation is also a prerequisite.
What should a rescan tracking timeout mean to the operations team?
A tracking timeout means ServiceNow stopped tracking rescan status; it does not stop the scan itself. Inspect the relevant scan records and the subsequent fixed-results import before deciding to repeat work. Keep that distinction in the operating procedure so a tracking event does not become an unnecessary second scan.