Build the automated phishing playbook as a process in Process Automation Designer using sn_si.admin or sn_si.manager. Define when the process starts, arrange the response stages, and configure their activities and inputs. Then check the response flow and the SIR Analyst Workspace experience so the process structure matches the incident response you intend to run.
Set the scope of the automated phishing playbook
In the documented example, the stages are Analysis, Contain, Eradicate, and Review, and you can add as many stages as the response needs. Activities sit inside those stages. Start with an incident scenario and describe the evidence that should allow it to advance. For example, containment should depend on the relevant analysis outcome, rather than begin simply because an incident exists.
Distinguish process design from the automation that performs response actions. PAD defines the process, stages, activities, and their conditions. The automated response flow connects actions and subflows for work such as observable enrichment, threat lookup, blocking, and email removal. Review both layers before treating a configured process as ready for operational use.
The steps here use Brazil behavior; check labels and availability on your instance and release. For the surrounding design concepts, see the guide to playbooks and Workflow Studio. Keep the initial build focused on one phishing scenario so that a failed condition can be traced to a specific design choice.
Create the PAD process and define its trigger
Creating the process requires sn_si.admin or sn_si.manager. Open Process Automation Designer from All, select New, and choose Playbook. Automated Phishing Playbook Template V1 is an example template for this work. Enter the process name, description, and application before defining the conditions that start it.
- Select Select a trigger, then Define your own conditions for when your process runs.
- Select the trigger condition and use Set your trigger conditions to choose the table and fill in its conditions.
- Use a phishing security incident being created as the starting scenario if that matches your intended process.
- Select Go to Designer to continue into the process layout.
Write the description so another builder can distinguish the process from a broader incident workflow. Record the intended incident category and whether creation or a later update should initiate the response. That decision matters because the trigger decides which records start the process. The documented example fires when a security incident of category Phishing is created.
Review process eligibility alongside the response flow trigger. In the response-flow example, Category is Phishing and Source is Email start the sequence when the incident meets those conditions. A PAD process aimed at phishing incidents needs a deliberate relationship to that narrower flow condition. Check a qualifying record and a record that should remain outside the process before adding more complexity.
Give stages explicit start rules
Select Add a new stage to open the stage properties pane. Enter Name, Description, Run condition, and Indicate when to start, then select Save and close. Use Add another stage for the remaining stages. These properties determine when a stage can run, so names alone do not establish the response sequence.
Use Analysis, Contain, Eradicate, and Review to align the process with the phishing response stages. The PAD example has Analysis start immediately without a run condition. Contain starts after the Analysis stage completes and uses the outcome of an Analysis activity as its run condition. Adapt those dependencies to the response decision your team needs.
Before saving the design, explain each transition in a single sentence. Identify what has completed and what result permits the next stage. If those are separate requirements, check that the start timing and run condition represent both. This review helps expose a stage that waits for completion but lacks the outcome needed to justify its actions. Keep a short list of each stage’s entry evidence and expected result with your design notes so reviewers can compare the layout with the intended decision.
Add activities and inspect the values they receive
Under the relevant stage, select Add another process activity. In Add activity, choose the activity definition and select Create a new activity. Configure the activity after adding its definition. Repeat this for the activities needed in each stage, keeping their placement tied to the incident outcome they support.
In Activity properties, set the run condition and indicate when the activity should start. Review the displayed inputs, including inputs configured in the automation plan. You can retain preconfigured values or override them. Select View all properties and enable Advanced properties when you need the activity experience fields supplied by the activity definition.
Check inputs against a concrete test incident. An activity name can look correct while its supplied values represent the wrong incident or an unsuitable set of observables. Review the record context and the values the activity is expected to consume. Record the reason for an override so later reviewers can distinguish an intentional change from an accidental departure from the template.
Look for repeated work across activities as the design grows. Keep this process review centered on the activities required to move a phishing incident through its response stages.
Connect the design to a tested response flow
The response-flow procedure requires sn_si.admin, flow_designer, and action_designer. It also requires configured integrations with appropriate credentials for Block Request using Security Operations Palo Alto Networks NGFW Integration, Observable Enrichment, Sighting search, Threat Lookup, and Microsoft Office Exchange. Check those dependencies before evaluating whether the response can complete.
Open All, then Flow Designer, then Designer. The Security Incident – Automated Phishing Response Template V1 flow is read only. Make a copy from the flow’s more icon and work in that copy. You can change trigger conditions, add or remove actions, and adjust the flow for the intended incident response.
Follow the data through the response sequence. The flow collects observables, runs threat lookup and enrichment subflows in parallel, and uses Confirm Threat from Observable Triage to determine whether a threat indicator is present. A confirmed threat adds an IOC Detected flag. Later work assesses email impact, searches sightings, creates block requests, and removes phishing emails.
Inspect what each step passes forward before changing its order. Threat confirmation and malicious-observable selection influence later response work. A sequence that reaches containment without the expected findings deserves investigation before activation. For help planning this work, see ServiceNow implementation.
Select Test to simulate flow actions before publishing the flow. After testing, select Activate to make the flow active, and use Executions to inspect its execution details. Record the incident conditions and expected outcomes with each test. Include a qualifying phishing email case and a case outside the trigger so that eligibility receives the same attention as successful execution.
Verify what analysts see in the workspace
Using the playbook in SIR Analyst Workspace requires sn_si.admin or sn_si.manager or sn_si.analyst. Open a security incident, select Playbook, and choose Automated Phishing Playbook. The tab displays playbooks enabled for the incident, along with details such as its category and risk score. If the list is empty, check that the playbook is enabled in PAD.
Select Analysis, Contain, Eradicate, and Review to inspect the activities performed in each phase. Automated phishing tasks run automatically, but a phase can display a remaining activity or required user action. Open the relevant phase and complete that action when required. Review the visible result alongside execution details rather than assuming an empty work queue proves the response finished correctly.
Use the Security Incident Response playbooks guide when reviewing how this experience fits the wider response process. For this build, capture the incident, expected stage behavior, actual activities, and unresolved actions in your acceptance notes. That creates a clear handoff between the builder checking conditions and the analyst checking the incident experience.
Questions about inspecting phishing automation
Where can I inspect how an action selects observables?
Open Action Designer from an expanded flow step. For Get Observables from Task, inspect Action Input, Get M2M Records, and Get Observables. These areas expose the supplied context, selection conditions, retrieval script, and resulting observable count.
Can I edit the threat lookup subflow directly?
The Run Threat Lookups for Observables subflow shown in Subflow Designer is read only. You can inspect its inputs, outputs, and underlying workflow actions. You can add or delete subflows at the step, but cannot modify that subflow.
Does the acknowledgement email have a conditional check?
The response flow checks affected-user details before sending its acknowledgement. Conditions can check whether the user is active and able to receive notifications. Inspect that branch when an expected acknowledgement is absent.
What does a lock icon on a response step mean?
The lock icon indicates a step that requires no user intervention. It helps distinguish automated work while inspecting the response flow. Use the actual step details to understand the operation and its record references.