OBLYTECH Logo
OBLYTECH Logo

Map CrowdStrike Falcon detection fields

Map CrowdStrike Next-Gen detection fields in the CrowdStrike Next-Gen Field Mapping section by choosing sample data, selecting SIR incident targets, and assigning detection or event values to those targets. Review field multiplicity, observable types, translation needs, and update check boxes before continuing to the conditions that determine which detections create security incidents.

Prepare the CrowdStrike Next-Gen detection fields mapping

The mapping task requires sn_si.ingestion_profile_admin. A user with sn_si.admin can also perform it because that role inherits the profile administrator permissions. The mapping action requires the sn_si.ingestion_profile_admin role. The sn_si.admin role includes it by default, so check for one of these two roles before changing the profile.

Start with an agreed list of information analysts need when a detection becomes a security incident. For each item, record its source field, intended incident field, expected format, and whether subsequent source changes should replace the incident value. This working list helps distinguish a missing mapping from a deliberate decision to preserve analyst input.

Keep the field work connected to the wider ingestion design. The ServiceNow and CrowdStrike integration guide provides the adjacent integration context. Here, the decision is narrower: which incoming values belong in which incident fields, and how those values should behave after creation.

Check the labels and available options against your instance and release before changing the profile. Treat the mapping review as a data ownership decision: a source value may be accurate at ingestion while an analyst later has a reason to replace it.

Choose samples that expose the values you need

On the mapping page, find CrowdStrike Next-Gen Field Mapping and select a value under Sample Ingestion Methods. The two methods support different checks. Choose according to whether you need a field inventory or actual values to inspect.

  • All default Detection and Events Fields: displays the static default field names without sample values. Use it to identify available source names and plan initial associations.
  • Retrieve Recent Detections: imports recent detection and entity data. It supports five sample detections, with fields and values displayed in individual tabs after the profile ingests the samples.

For a detection containing several alerts, the mapping view uses the earliest alert. Ingestion also uses that earliest security alert’s field values. When a value differs from the one an analyst expected, first compare the same alert on both sides. Comparing a later alert with the mapping sample can make a correct association appear wrong.

Use the sample tabs to inspect populated and empty values before selecting targets. A field name alone cannot demonstrate that its contents fit the destination. As a review practice, note which samples exercised each mapping and which associations still need a representative value before acceptance.

Add targets and build the input expressions

Work in SIR Incident Target Fields to add a destination beyond the fields already displayed. Select Map another field, expand the list in the Security Incident column, and choose the required field. Then drag the source from Detection and Event Fields to the target’s input expression.

Mapping supports more than a single dragged value. You can combine literal text with source expressions, or enter an expression manually. For example, a target expression could combine the text “Detection severity: ” with ${Detections: severity}$. For an event description, the source expression is ${Events: description}$. Preserve the expression delimiters and source names when entering them.

The source colors help with coverage review. Light blue indicates a source field that has not been mapped; gray indicates one already used in a target. A source can feed more than one incident field, so gray does not mean it is unavailable for another association. Check the target list rather than treating color as a completeness test.

To remove an unwanted association, use Remove item beside the input expression in SIR Incident Target Fields. After changing an expression, review the entire target value for leftover literal text or an expression that now refers to the wrong source. For background on source and target associations, see how a transform map works.

Check multiple values and security-specific targets

Observable, Configuration Item, and Work notes support multiple values in this mapping workflow. A field that does not support multiple values produces an error if you attempt to map two values to it. Resolve that conflict by reviewing the intended destination rather than discarding one source value without considering its investigative purpose.

Choice compatibility needs a separate check. When a destination provides a list of selectable options, an incoming option outside that list does not populate the incident field. Inspect the actual sample content and the destination choices together. A populated source expression does not establish that the target will accept its value.

For observables whose type is uncertain, map the incoming field to Observable so the integration can classify supported subtypes. If the type is known, use the corresponding specific target, such as Observable(Domain name), Observable(Email address), Observable(IP address (V4)), or Observable(Host name). Choose based on what the source contains rather than its display name alone.

Map MITRE-ATT&CK information to MITRE-ATT&CK Technique when the incoming value contains a technique ID or technique name. A general narrative mentioning an attack is not a substitute for checking that the source contains the expected technique information.

Configuration item mapping decides only whether the incident receives the intended CI value; service modeling is a separate question and is outside this mapping review. Readers evaluating that separate modeling question can use the service map explanation. For this mapping review, concentrate on whether the incident receives the intended entity value and whether it matches an existing record.

Translate values and decide who owns later changes

When an incoming value and an incident value represent the same concept in different formats, use field translation during mapping. The supported translation fields include Affected user, Configuration Item, and Priority. Use the script format field translation icon to modify a supported field. The CrowdStrike Next-Gen Field Translation editor provides Update to save changes and return to the mapping page.

Review a translation against actual sample values before relying on it. Record the incoming value, intended translated value, and observed incident result. This gives the reviewer a specific acceptance condition and helps separate a translation defect from a source field that is empty.

The check box beside a mapped field controls whether new or changed CrowdStrike data updates the corresponding incident data. Affected Users, Configuration items, and Observables are checked by default; newly associated entities populate their respective related lists during polling. The base system property sn_sec_cs_ngsiem.detection_updates defaults to False. Review the property and field selections together when investigating update behavior.

For other fields, select the corresponding check box when later detection changes should update the incident. Assess this decision against analyst edits and automation that depends on the target value. Replacing a value can change the information under investigation and affect actions driven by that field. Test initial creation and a later source change as separate acceptance cases.

For help planning this work, see ServiceNow implementation.

Validate the incident before moving to filtering

After ingestion, examine the resulting incident rather than stopping at the mapping screen. Where matching CMDB or identity records are absent, Unmatched CI appears in the Configuration Items related list and Unmatched Affected Users appears in a dedicated related list. Include unmatched entities in the review so absence of a match is not mistaken for lost source data.

  1. Compare the source sample with its intended target, including the alert used for the comparison.
  2. Check repeated values, selectable options, observable classification, and any translated values.
  3. Confirm the chosen update behavior with a later source change and inspect the related lists.
  4. Record unresolved associations before handing the profile to the next reviewer.

Select Continue to reach Filtering and Aggregation when the mapping is ready. The mapped field values are also available in Detection Generation Conditions for criteria an incoming detection must meet to create an incident. Review those criteria separately from the correctness of the destination values.

Handing off the mapping review to another administrator

What should the mapping handoff contain?

A compact record of the source expression, target field, translation decision, update ownership, sample result, and any unresolved association, so another administrator can reproduce the test.

Which CrowdStrike fields update the incident after creation?

Affected Users, Configuration items and Observables are checked by default and populate during polling. Other fields update only when their check box is selected. The sn_sec_cs_ngsiem.detection_updates property defaults to False.

How should a team prioritize a large field inventory?

Start with the information needed to recognize the detection, understand affected entities, and make a response decision. Review additional fields against a stated investigative need before adding them. This keeps the acceptance review focused and gives each association a reason to exist.