To attach the Threat Hunting playbook to a case manually, open the case in Threat Analyst Workbench, choose Add Playbook, select Threat Hunting, and confirm. You need the sn_sec_tisc.analyst role and an open case. The playbook starts at Intake, including when the case does not meet the automatic trigger conditions.
Check the case before adding the playbook
Manual attachment gives an analyst a way to start a guided hunt on a case that was created for another purpose. For example, a case whose Case Type is not Threat Hunting can still need a hunt. Changing the case merely to imitate the automatic trigger is unnecessary when the manual attachment route fits the investigation.
First confirm that you have the intended case open. Review its existing hypothesis, associated techniques, and hunt scenarios before introducing another workflow. Adding a playbook can repeat activities already completed on the case. A technique that someone already associated, or a scenario already entered, deserves attention before you approve the addition.
Use these checks to prepare the record:
- Verify that the case is open. A closed case cannot receive the Threat Hunting playbook.
- Check that the person attaching it has the sn_sec_tisc.analyst role.
- Identify the intended case owner in Assigned to, since that person controls approvals and stage transitions.
- Review the Playbooks tab for execution history, including completion or cancellation.
The playbook runs once per case through completion. After a completed execution, it cannot run again on that case. A cancelled execution can have the playbook added again. Treat these as different situations when deciding whether an existing record is suitable for the next investigation.
Add the threat hunting playbook to the case
The manual attachment procedure takes place in Threat Intelligence Security Center. Keep the existing case context visible while you work, particularly if another analyst has already gathered entities or written investigation scenarios.
- Navigate to Workspaces > Threat Intelligence Security Center.
- Select the Threat Analyst Workbench icon.
- Open Case Management > All Cases.
- Open the case record that needs the hunt.
- From the case action menu, select Add Playbook.
- Choose Threat Hunting from the available playbooks.
- Read the confirmation dialog and confirm the addition.
Reviewing the confirmation is a decision point. If the existing case already contains substantial hunt work, agree which information the team should retain and which activities need to be revisited. That preparation helps analysts distinguish deliberate review from accidental repetition after the playbook starts.
If the expected workflow is missing, check the case state, your analyst role, and the existing execution history before attempting another addition. A completed execution and a closed case are explicit constraints. Record what you find so an administrator can investigate availability or configuration without creating uncertainty about which case was changed.
The attached playbook begins at Intake. Open Playbooks on the case to inspect the execution and its stage. Successful attachment establishes the guided workflow; the case owner still needs to review the hypothesis and authorize progress through the later stages.
For investigations that begin with incoming intelligence, threat intelligence use cases for enterprise teams provides broader context for deciding which signals deserve investigation. Keep the specific reason for this hunt in the case hypothesis so the workflow has a clear question to resolve.
Distinguish manual attachment from automatic initiation
The automatic route starts when a case is created with Case Type set to Threat Hunting and Status set to Draft. Activation is also needed: the Threat Hunting playbook ships deactivated. An administrator activates it before automatic initiation can take effect. Manual attachment addresses cases outside those trigger conditions.
Activation and attachment are separate actions with different permissions. The activation procedure requires admin. The manual attachment procedure requires sn_sec_tisc.analyst. Do not treat an analyst’s ability to work on a case as permission to change the playbook configuration.
An administrator activates the playbook through All > Workflow Studio. In Playbooks, open Threat Hunting. The optional Test action accepts a case record for a test run; Activate enables the playbook. Before using the playbook for a hunt, confirm that it is active.
These steps match the Brazil release. Check the labels on your own instance before you train analysts on them.
For help planning this work, see ServiceNow implementation.
Prepare Intake so the owner can make a decision
In Intake, use Description to express the hypothesis. Describe the suspected adversary behavior, the observables worth investigating, and the outcome the hunt is intended to establish. A focused hypothesis gives the owner something concrete to approve; a list of unrelated indicators makes that decision harder.
Set Assignment group for the responsible team and Assigned to for the case owner. Use Navigate to Artifacts to reach the Artifacts tab and add the entities to investigate. Review existing entities first so the analyst understands the material inherited from work that preceded manual attachment.
Update Case Details saves the entries while leaving the playbook in Intake. Use that opportunity to refine the hypothesis and linked entities before asking the owner to advance. Done is available to the case owner and moves the execution to Triage.
Case access allows users to read playbook details and contribute information. Ownership has a narrower operational meaning: the user in Assigned to makes approval and transition decisions. A contributor can improve the description without gaining the owner’s decision authority.
In Triage, the owner chooses Approve Hypothesis to proceed to Scoping or Reject Hypothesis to cancel the hunt. Rejection cancels the playbook and sets the case status to Cancelled. Both decisions are recorded in a case work note. Make sure the owner understands the effect before using rejection as a way to pause discussion.
Check the first handoff into Scoping and Hunt
Manual attachment does not remove the preparation needed for later stages. In Scoping, MITRE data must be present before analysts can select TTPs. MITRE data sources ship deactivated; an administrator needs to activate and run a MITRE data source to make that data available.
In Select relevant TTPs, Confirm adds selected techniques with their matrix and tactic metadata to the case description. Skip is available when the activity is unnecessary, such as when no TTPs apply. Review existing associations before confirming techniques, especially on a case that had investigation work before the playbook was attached.
Provide Hunt Scenarios lets analysts with case access enter or update scenarios and a Due date. The owner uses Approve Scenarios or Reject Scenarios. Approval moves the workflow to Create Hunt Tasks; rejection cancels both the playbook and the case. New Hunt Task creates an investigation task for an approved scenario and assigns it to an analyst.
Once tasks exist, the owner’s Done action advances to Hunt. Analysts record findings on individual hunt tasks, and those updates feed the aggregated findings. Summary of case tasks groups the tasks by state. The owner uses Complete Hunt to move to Review Outcomes when the investigation is ready.
Link the hypothesis, scenarios, tasks and evidence to each other as the hunt moves forward. For the wider picture, see threat intelligence.
Once the playbook is running, avoid repeating its work by hand on the same case. A scenario typed directly into the case or a task created outside the stage can duplicate what the next stage asks for, and then the case holds two versions of the same decision. Use the stage actions for the hunt and keep manual edits to the description and linked entities.
Each transition is made by the case owner, so agree who that is before the playbook starts. The transitions are:
- Intake to Triage: Done, after the hypothesis, assignment group, assignee, and linked entities are set.
- Triage to Scoping: Approve Hypothesis, or Reject Hypothesis to cancel the hunt.
- Scoping to Hunt: Done, once the hunt tasks are created.
- Hunt to Review Outcomes: Complete Hunt, when the investigation is ready.
- Review Outcomes to Post Hunt: Confirm Outcomes, after the outcome has been reviewed.
Questions about follow-through after manual attachment
Can the team monitor the playbook while working on another case tab?
Yes. The Playbook card in the right-side context menu shows playbook status while you work elsewhere on the record. It also provides a way to cancel the execution. Use it to stay aware of the workflow while reviewing other case information.
Can analysts edit aggregated findings during Review Outcomes?
Analysis and Findings is read-only in that stage. The team can review the aggregated results alongside Notes, Recommendations or Actions, and Closure Summary. The owner uses Confirm Outcomes to advance to Post Hunt after reviewing the outcome.
Does a hunt have to become a Security Incident?
No. Post Hunt supports optional escalation or reporting before completion. Users who can create Security Incident records see the Create Security Incident action in Post Hunt. Users without that access do not see it. An incident created through that action is linked to the case automatically.
Where can the team prepare a case report?
In Post Hunt, View Case Reports opens the Case Reports tab, where a report can be created. Decide whether the result needs a report, incident escalation, or both before finalizing. Complete Playbook marks the execution complete, so review the closure material before taking that final step.