OBLYTECH Logo
OBLYTECH Logo

Look up a threat with the Threat Lookup flow

To check whether an IP address, URL or file hash is linked to known threats, select it and run a threat lookup in Security Operations. The lookup runs the implementations you choose. Start from an observable or an observables list, select the active implementations, and submit the request. Review each returned result before using the findings to guide investigation, especially when different threat sources disagree.

Understand the Threat Lookup flow in Security Operations

Security Operations Integration – Threat Lookup is the capability flow that coordinates the lookup. It accesses available implementations and executes their associated flows for the selected observables. The capability provides the route into those integrations; each implementation performs its own lookup work. The sources you select decide which results come back, so choose them as deliberately as the value you are checking.

An observable is the item being checked, such as an IP address, URL, or file hash. Keep the investigation question specific: are you checking a hash found on an affected device, or investigating an address connected to suspicious activity? Record that context before starting.

Get Supported Capabilities is a general flow action: any flow can use it to find which active integrations support a given capability. Capability Execution Tracking – No Impls is no longer supported and has been replaced by Capability Implementation Execution, so use that instead in new flows. For broader automation context, see Flow Designer. Understanding the distinction between a coordinating flow and an implementation makes it easier to locate the stage that needs attention when a source does not return the expected information.

Prepare the observable, integrations, and access

Performing lookups on observables requires sn_ti.write. Activate the Threat Intelligence plugin and install a plugin for at least one scanning implementation before attempting this procedure. The observable lookup path lists CrowdStrike Falcon Intelligence integration, OPSWAT Metadefender, Security Operations Have I been pwned?, and VirusTotal. Which implementations run depends on activation and your selection at submission.

Check these instructions against your instance and release; the behavior described here follows Brazil. Keep the observable lookup path separate from the Threat Intelligence Security Center configuration path described below, because their integration lists and administrative roles differ. Do not use one workspace’s available integrations as proof that the same choices will appear elsewhere.

  • Check that the observable value and its type represent the item you intend to investigate.
  • Identify the threat sources you want to consult before selecting a large batch.
  • Confirm that the required integration is installed and active for the intended lookup path.
  • Arrange access for the specific action instead of assuming an administrative role is needed to run a lookup.

Have I been pwned? illustrates the implementation layer. Its flow runs when the Threat Lookup capability triggers it and that implementation is selected. It acts on observable types it recognizes and returns results. The implementation-flow topic specifies sn_si_admin; the observable lookup procedure specifies sn_ti.write. Preserve that distinction when planning access or investigating a permission problem.

Run the lookup and select the sources

  1. Navigate to All > Threat Intelligence > IoC Repository > Observables.
  2. For a batch, select the observable records, open Actions on selected rows, and choose Run threat lookup.
  3. For one item, open the observable record and use the Run threat lookup related link.
  4. Select the implementations you want to run. Choose All when the request should use all active implementations.
  5. Click Submit and look for the message that the lookups have begun.

Submission starts the capability flow and the implementation workflows associated with your selection. Treat the start message as confirmation that processing has begun. Wait for completion before evaluating the results. For an initial check, a small, clearly identified selection makes it easier to compare the requested values with the returned entries.

If the Threat Intelligence plugin is active and at least one Security Incident Response integration implementation is active, observables you add to a security incident run the Threat Lookup capability automatically. The results appear in Threat Lookup Results.

If you are tracing what happens inside the automation, the explanation of Flow Designer actions gives supporting context. Keep a note of the selected implementations during testing. That note gives you a concrete basis for deciding whether a missing result relates to a source you actually requested.

Read results without confusing absence with a finding

After completion, open Threat Lookup Results. Select the Result value to inspect additional details, including the raw result for that lookup. VirusTotal and OPSWAT Metadefender consolidate details in their result presentation. Review the underlying information when a summary does not explain why a value was classified in a particular way.

The Recent Threat Lookup Result tab shows recent results from individual integration vendors when that related list has been configured. It is not included in the base system. Its absence therefore needs a different investigation from an integration that was selected but has not produced a result.

The related-list configuration sequence is to right-click the form header, choose Configure > Related Lists, move Recent Threat Lookup Results from Available to Selected, and click Save. Have the person responsible for form configuration handle that change with the appropriate instance access. Do not infer form-configuration permissions from the role used to perform the lookup.

As an investigation habit, compare the observable, selected vendor, and result details together. A missing response is not evidence that an observable is Clean. Likewise, a completed lookup does not settle questions about where the value appeared or what happened on an affected system. Preserve those distinctions in the incident notes so later reviewers can see what the lookup actually established.

Configure Threat Intelligence Security Center lookup integrations

Configuring Threat Lookup in Threat Intelligence Security Center requires sn_sec_tisc.admin. This configuration supports VirusTotal and CrowdStrike Intelligence. The Enrichment Integrations module appears when at least one integration supporting a capability is installed. The Threat Lookup section contains integrations whose integration type is threat lookup.

  1. Navigate to Workspaces > Threat Intelligence Security Center.
  2. Choose the Integrations icon, open Threat Lookup, and select Configure new enrichment.
  3. Choose an available integration and select Select.
  4. Complete Name and Description. Vendor Name and Integration Type are prefilled for the selected integration.
  5. Complete Integration Configuration using the details required by that integration.
  6. Select Save to create the configuration, then Enable to enable it.

Configuration requirements vary by application and can include an API key, client identifier, secret, username, or password. Save validates the supplied details and creates the integration as inactive by default. Save as Draft stores unfinished configuration without creating it. Distinguish a saved configuration from an enabled integration when checking readiness to use a source.

The Actions menu on an integration tile can enable, disable, or delete an integration. During troubleshooting, first establish which configuration you are examining and whether it is enabled. For help planning this work, see ServiceNow implementation.

Check finding calculation after the lookup returns

Threat Lookup Finding Calculators turn vendor responses into supported observable findings. A calculator can use the supplied script or an adapted script; for integrations that return computed results, it maps those results into the base-system findings. Review this layer when a response has arrived but the displayed finding does not match the interpretation you expected.

Recent results across vendors determine the overall finding. A Malicious result takes precedence. Without Malicious, a Suspicious result determines Suspicious. Clean requires all vendors to report Clean. If neither Malicious nor Suspicious is present and a vendor reports Unknown, the overall finding is Unknown. Compare vendor results before changing calculation logic.

Viewing or creating calculators requires sn_sec_tisc.admin. The route is Workspaces > Threat Intelligence Security Center > Administration > Threat Lookup Reputation Calculator. One calculator per vendor can be active at a time. For a closer examination of that separate configuration task, see Threat Lookup reputation calculators.

Run a threat lookup against the Zscaler global threat library

Zscaler Internet Access maintains a global threat library that Security Operations can query for observables of three types: IP addresses, URLs, and domains. Use this route when an observable is attached to a security incident and you want its reputation checked against that library. File hashes are not part of this lookup, so a hash on the same incident needs the separate sandbox route.

This lookup requires sn_si.admin, which is separate from the sn_ti.write permission used by the observable lookup path described earlier.

To run the lookup manually on one observable:

  1. Navigate to All > Security Incident > Incidents > Show All Incidents.
  2. Open the security incident that holds the observable.
  3. Select Show All Related Lists, then open the Associated Observables tab.
  4. Select the observable, open the Actions menu, and choose Run Threat Lookup.

Automatic lookups behave differently. The first time an observable is associated with a security incident, every active threat lookup implementation runs on it, and the Zscaler route is one of those implementations. When more than one Zscaler configuration exists, the one with the lowest order value is picked by default. Check that ordering before you assume which configuration produced a result.

After you submit, the Work notes on the incident show the status of the request. Results appear in the Threat Lookup Results related list. Treat the status entry as confirmation that the request was sent, and open the result record to see what the library returned, because a status line does not report a finding.

The sandbox submission is a separate action that sounds similar and should not be recorded as the same check. Zscaler’s sandbox analyzes files in a virtual environment to detect malicious behavior, and it also requires sn_si.admin. It accepts only MD5 hash observables, and the file must already have a completed analysis report in Zscaler. If you submit a hash with no report, you get an error message, so confirm that a report exists before you rely on that route. In the incident notes, name the route you used so a reviewer can tell a reputation lookup from a sandbox result.

Questions about lookup records and follow-up checks

Which table holds Threat Lookup Results?

The enrichment table is sn_sec_tisc_lookup_result. When checking a reporting or automation requirement, identify this result table separately from tables that connect observables to other entities. That distinction helps keep a result review focused on lookup evidence.

Are sightings and observable enrichment results stored together?

Sightings and observable enrichment results are stored in separate tables, sn_sec_tisc_sighting and sn_sec_tisc_observable_enrichment_result. A report that needs both has to read both tables.

What connects an indicator to an observable?

The Related Indicator Observable relationship uses sn_sec_tisc_m2m_indicator_observable. Use that relationship as a starting point when examining how an indicator and observable are connected, rather than assuming the association itself is a threat lookup result.

What should a lookup handoff include?

Record the observable, the implementations you selected, the findings you reviewed, and any vendor whose result is missing or unclear. Add the question that started the lookup, so the next analyst knows what is still open.