To define an indicator of compromise in ServiceNow, an analyst with sn_sec_tisc.analyst opens Workspaces > Threat Intelligence Security Center > Threat Intel Library > Indicators, selects Indicator, and clicks New. Complete the detection pattern, validity, classification, and source details, then save and continue to review the aggregated record and its relationships.
Prepare to define an indicator
Start with the evidence behind the detection. Before opening the form, identify what the pattern represents, where the information originated, and when the indicator should be considered valid. These decisions give the next analyst enough context to judge the record rather than treating its existence as proof of malicious activity.
The role required for this creation procedure is sn_sec_tisc.analyst. Check access to the named workspace and library on your instance and release before beginning. If your assignment also includes recording sightings, plan that as a separate action with its own permission requirement.
The word indicator appears in other ServiceNow applications. For the broader terminology, see indicator concepts. A reader looking for measurement definitions can use Performance Analytics indicators; the workflow here concerns threat intelligence records.
Create the record in the Threat Intel Library
- Open Workspaces, then Threat Intelligence Security Center.
- Go to Threat Intel Library and open Indicators.
- Select Indicator and click New.
- Complete the relevant fields in the Details section, then add supporting context.
- Click Save, then use Continue to proceed with editing and relationships.
Creating a new object produces a source record and redirects you to its aggregated record. Expect that transition during the workflow. A sensible completion check is to inspect the resulting record and its Source Records details rather than assuming the initial form and the final view represent separate manual entries.
Use Name for a recognizable label and Description for the explanation an investigator will need. The ID identifies the indicator uniquely. As a writing practice, make the description explain the detection’s meaning and limitations; repeating the name leaves the analyst with little basis for interpretation.
Keep the pattern and its metadata consistent
Pattern holds the detection expression. Pattern Type identifies the language used, while Pattern Version records the corresponding language version. Review these three fields together. A pattern written in one language and labeled as another creates an avoidable interpretation problem for whoever reviews the record next.
A STIX pattern triggers automatic extraction of observables when the indicator source record is created. After saving, inspect Observables for those extracted records. This check connects the expression you entered with the objects available for subsequent investigation without assuming that manually entering a description produces the same result.
Extraction is selective. Only comparisons that resolve to a single literal value produce an observable, and the operators that do so are equals, IN, and ISSUBSET. Comparisons using inequality, greater-than, less-than, LIKE, MATCHES, ISSUPERSET, or EXISTS are skipped, and so is any comparison preceded by NOT. A pattern that relies on those operators can look complete in the Pattern field while producing fewer observables than you expect, so count the results against the detection logic.
Extracted observables inherit the Confidence, Expiration Time, TLP, Threat Level, and Threat Severity values of their source indicator, along with its source and execution run values. Their Additional Context field records the ID of the indicator they came from, which is the link to follow when you review one. Values longer than 256 characters are truncated to 256, so check long strings after the record is saved.
Spec Version describes the STIX specification used to represent the object; for STIX Objects defined under the specified 2.1 specification, its value must be 2.1. Pattern Version describes the pattern language.
Use Additional Context to explain assumptions that do not fit the detection expression. Notes in Insights can hold further analyst commentary. Lang identifies the language of the object’s text, and Extensions records its extensions. Put the reasoning for an assumption in Additional Context, and keep it out of Pattern so the detection expression stays readable on its own.
Set validity, confidence, and handling details
Valid From marks the beginning of the period in which the indicator represents its associated behavior. Valid Until marks the point after which it should no longer be treated as valid for that behavior. First Seen and Last Seen instead describe observation of malicious activity. Created and Updated describe the object’s times in the system.
Review those timelines separately. An observation may explain why an analyst considers a pattern relevant, but it does not remove the need to decide its validity period. Expiration Time is another available field; review it alongside your validity choices rather than treating differently named time fields as interchangeable.
- Confidence records the creator’s confidence in the correctness of the data and must be a number from 0 to 100.
- Threat Level and Threat Severity hold their respective assessments of the indicator.
- IOC Classification, Indicator Types, and Usage Categories describe classification and categorization.
- Platforms identifies applicable platforms, and Attack Phases records the associated kill chain phase.
- TLP represents the data sensitivity setting, while Source identifies the originating threat source.
Record the rationale for a confidence assessment in the supporting context. A confidence value expresses belief in correctness; it should not be used as a substitute for explaining severity or the evidence behind the pattern. Set Status using the values the form offers rather than inventing a status vocabulary in analyst notes.
Revoked identifies objects that their creator no longer considers valid. Include it in the review when the source’s position has changed. As a team practice, agree who reviews aging records and who decides whether new evidence changes their interpretation before building a large manually maintained collection.
For help planning this work, see ServiceNow implementation.
Review the saved object and its relationships
After Save, the workflow displays a creation prompt and offers Continue for further editing and relationship work. The prompt can refer to an observable record during this indicator procedure. Use the resulting record’s identity, pattern, and source information to check the outcome instead of relying on the wording of that message alone.
Prevent System Updates becomes available after creation. Selecting it prevents system updates to the created observable, indicator, or STIX object record. Consider the maintenance consequence before selecting it: decide whether the record should remain open to system changes and record the reason for preserving it under manual control.
Tags and Taxonomies provide classification tools after creation. Select Tags associates existing tags, while Add Tags adds new ones. Select Taxonomy and Add Taxonomy Values support taxonomy association and values. Agree on naming conventions before adding labels so reviewers can recognize a shared classification rather than several spellings of the same idea.
Use Related Records to inspect the evidence surrounding the indicator. Observables includes objects extracted from its pattern. Sightings contains associated sighting source records. Malware, Campaigns, Attack Patterns, and MITRE Techniques offer other investigative relationships. Check that a relationship adds evidence relevant to this detection before linking it.
Review Source Records for provenance and Related Cases for investigative context. Indicators can also be added to cases. A completed form is a starting point for investigation; a good handoff explains which associated records support the analyst’s interpretation and which questions remain open.
Record a sighting as a separate action
A sighting denotes that an indicator was seen. Creating an indicator and recording a sighting use different routes and roles. The sighting creation action requires sn_ti.admin. Navigate to All > Threat Intelligence > IoC Repository > Indicator Sightings, click New, complete the form, and click Submit.
Select the relevant record in Indicator. Count records how many times the object was seen, and First Seen and Last Seen describe the observation period. Source identifies the threat source; Source ID identifies the object within that source. Description adds context about the sighting.
Created Time in Source and Modified Time in Source describe source timestamps. Before submitting, compare the selected indicator, count, and observation period with the information being recorded. A sighting linked to a similar but different indicator would misdirect later review.
External References, Identities, and Observed Data provide related information for the sighting after submission. Keep the observation connected to its supporting context. For readers comparing this security workflow with governance measurements, continuous control monitoring indicators addresses that separate indicator use.
Define an attack pattern for categorizing attacks
An attack pattern is a record of a method adversaries use to attempt to compromise targets. Attack patterns are used to help categorize attacks: they generalize specific attacks to the patterns that they follow.
The role required for this procedure is sn_ti.admin. Confirm you hold it before you start, and check access to the IoC Repository on your instance and release.
Open All, then Threat Intelligence, then IoC Repository, and select Attack Patterns. Click New, complete the form, and click Submit. The form includes these fields:
- Name, a descriptive name for the attack pattern.
- Description, a description of the attack pattern.
- Aliases, alternative names used to identify the attack pattern.
- Source and Source ID, which identify the threat source and the object’s identifier within that source.
- Created Time in Source and Modified Time in Source, which record when the source created and last changed the object.
Spec Version must be 2.1 for objects defined under that STIX specification. It records the version of the STIX specification used to represent the object.
Once the record exists, use its related lists to connect it to surrounding objects. Indicators shows the indicators of compromise the threat source has tied to the pattern. Malware and Tools cover the malicious code and the legitimate software adversaries use. Threat Actors lists individuals, groups, or organizations with malicious intent linked to the pattern, and Intrusion Set lists the adversarial behaviors and resources that share common properties. Vulnerabilities lists the weaknesses being exploited, and Course of Actions lists the technical responses that prevent the attack. Show Relationships opens the STIX Visualizer and appears only when the record has an associated object.
Questions about indicator handoff and review
Why does an observable appear after I save an indicator?
When the Pattern is a STIX pattern, the system extracts observables when the indicator source record is created and links each one back to its indicator. Editing the Pattern later does not re-run extraction, so a changed detection needs its own indicator record.
How can reviewers divide their work?
Split the review by question. One reviewer checks the pattern against its Pattern Type and Pattern Version. A second checks Source, Valid From and Valid Until. Name one owner for each disagreement before the indicator is used operationally.