To duplicate threat intelligence feeds, open the integration in Threat Intelligence Security Center, edit its feed configuration, and choose Duplicate from More Actions. The copy includes associated observables, indicators, and actors. Use the separate feed to evaluate configuration changes while preserving the original as the reference for your test.
Define the change before you duplicate threat intelligence feeds
A copied feed gives an administrator a starting configuration with existing intelligence attached. That makes it suitable for investigating a narrower ingestion filter, a different confidence policy, or a revised expiration setting. Decide which question the test must answer before creating the copy. Otherwise, several simultaneous changes can make an unexpected result difficult to explain.
Write down the source and copy names, the setting under test, its override state, and the event or record status, before running the copy. For example, a CrowdStrike test might ask whether an actor filter selects the intended indicators. A MISP test might investigate whether the event selection matches the organizations the team wants to monitor. These are proposed test plans, rather than automatic validation performed by duplication.
Keep the configuration comparison separate from the ingestion comparison. First establish that the new feed has the intended settings. Then inspect what a subsequent run retrieves. A copied set of intelligence records demonstrates the starting state; it does not by itself demonstrate the effect of a new filter on incoming data.
For the broader relationship between source feeds and intelligence handling, see threat intelligence feeds and sharing.
Create the copy and identify it before testing
Duplicating a feed requires the sn_sec_tisc.admin role. Configuring a new threat intelligence feed, configuring the custom MISP API feed, and configuring the premium CrowdStrike feed also require sn_sec_tisc.admin. Arrange for the administrator performing the test to hold the sn_sec_tisc.admin role, which the duplicate and configuration steps require.
- Navigate to Workspaces > Threat Intelligence Security Center.
- Select the Integrations icon and choose the integration from the Catalog view.
- Select Edit on the feed card to open its configuration form. CrowdStrike is one example of this route.
- Review the configuration and any intended adjustments before opening More Actions.
- Select Duplicate and inspect the confirmation that a new feed was created.
The generated name uses the integration name followed by Feed-copy; the CrowdStrike example is CrowdStrike Feed-copy. Locate that new feed and verify its identity before making further changes.
For a baseline comparison, duplicate the existing configuration before introducing the experimental difference. The duplication workflow permits configuration changes before Duplicate, so be deliberate about which values are present at that point. Do not assume that typing into a form and selecting another action is equivalent to a separate saved baseline.
The duplicate includes associated observables, indicators, and actors. Treat this as a copy of an intelligence feed, rather than a blank connection form. Check the copied content alongside the configuration so that reviewers understand what existed before the test run. Check these controls on your instance and release; the workflow described here follows Brazil.
Review scheduling, confidence, and expiration on the test feed
Inspect the copy’s execution state before running it. In the new-feed configuration workflow, Save validates the details and creates a disabled feed. Save as Draft stores the configuration without allowing the feed to be enabled. The duplication workflow does not state the status of the copy, so check it on the copy’s form before enabling it.
Where these fields apply to the feed type, review the following settings as separate decisions:
- Run determines the ingestion frequency, with options of Daily, Weekly, Monthly, Periodically, Once, On Demand, and Business Calendar start and end entries. The new-feed configuration default is On Demand; check the actual value on the duplicate.
- Fetch Data From establishes the starting point for retrieval. Scheduled runs subsequently retrieve incremental data. This field does not apply to Text, CSV, or JSON feeds.
- Expiry period (days) controls the configured expiration period. Override Source Expiration replaces source expiration with the profile configuration when enabled.
- Confidence sets the source confidence within the supported 0–100 range. Override Source Confidence applies the profile value when enabled.
Fetch Data From needs a worked check before the first enabled run. The first run retrieves data from that start time up to the moment it runs, and each later scheduled run retrieves only the increment since the previous one. Suppose a feed runs hourly and Fetch Data From is set to 6:00 AM. A run at 10:00 AM retrieves 6:00 to 10:00 AM, and the run at 11:00 AM retrieves only 10:00 to 11:00 AM. If the first run returns more records than you expected, check this field before blaming the filter.
A shorter expiration setting and a narrower filter answer different questions. A setting of 180 days, for example, expires each record 180 days after it was ingested. Test them separately if you need to explain why the resulting collection changed. A value read without knowing whether its override is enabled can leave the comparison incomplete.
Review the connection configuration as well. Use REST Message selects the REST Message and REST Method route, and those fields are mandatory when that option is selected. Without that option, the configured endpoint supplies the retrieval destination. Authentication Required applies only when the REST endpoint URL is used, so it does not apply when Use REST Message is selected. For a source that needs headers, enter each one as a key:value pair on its own line in Request Header Mapping, and enclose an authentication label in ${ and }$ to pass its value as a header, for example x-api-key:${API Key}$. Check that the copy points to the intended source before enabling execution.
Use MISP filters to test a specific event selection
For a custom MISP API feed, open Integrations, select Custom, and select Edit on the MISP Feed card. Configuration Details contains the endpoint and authentication details. The feed is inactive by default, so it has to be edited and enabled before it retrieves anything. For a MISP feed type, the endpoint should end with /manifest.json, the form the feed supports. Additional Settings contains the event filters; select Edit Settings to adjust them and Update to save the dialog’s changes.
MISP filters operate together. Include unpublished events changes whether unpublished material is included. Creator org name or ID and Tag name or ID accept comma-separated values. If an organization name has leading or trailing spaces, enclose it in double quotes so the feed processes it correctly. Threat level and Distribution level narrow the incoming events; leaving either of those fields empty includes all levels for that field.
A test can become too restrictive when several filters are changed at once. Start with a known event and identify which conditions it should satisfy. If the event is absent after retrieval, compare its organization, tags, threat level, and distribution against the complete filter combination before concluding that duplication failed.
The MISP retrieval date has an additional distinction. Published events are assessed against their Published timestamp, while unpublished events use Last updated. The relevant timestamp must be later than Fetch data from. Event status matters here, because a timing exclusion can look like a filter problem.
Test CrowdStrike settings without confusing inherited data with results
For the premium CrowdStrike feed, use Integrations > Custom, open the feed form, and select Edit. Details contains Client ID and Client Secret. Additional Settings and Edit Settings expose the ingestion filters. When the CrowdStrike feed is enabled, its configuration fields become read-only and Save is hidden; disable the feed before changing its configuration.
Record types to ingest can select Indicators, Reports, Actors, Malware, and Vulnerabilities. Leaving that selection empty ingests all of those record types. An empty Indicator types to ingest selection also retrieves all available indicator types. Do not interpret an empty selector as an instruction to ingest nothing.
The actor, report, malware, and indicator filters operate together. Choose a small, explainable change, such as requiring associated actors, and preserve the other settings for comparison. Additional Settings filters also apply to indicators associated with previously ingested indicators, reports, or actors, which matters when investigating results linked to existing intelligence.
Confidence mapping deserves its own test. A matching malicious confidence mapping in Additional Settings takes precedence over the confidence entered in Details. Compare the source category and the resulting TISC confidence together before deciding that the feed ignored a value.
For help planning this work, see ServiceNow implementation.
Close the test with a configuration and run review
After enabling a configured feed, let it run on its Run schedule (the Scheduling section’s Run field; On Demand is the default for a new feed), then review the ingested records against the written test question. Compare the result with the written test question, rather than treating completion of a run as proof that the filter is correct. Inspect representative records and distinguish copied content from information retrieved during the experiment.
Reopen the original feed and compare the settings you intended to preserve. Then decide what happens to the copy. Agree who owns the experimental feed and whether it should continue to run. A retained copy needs a clear purpose so that later administrators can distinguish it from the source.
Use the threat intelligence governance model to place that ownership decision, and threat intelligence best practices when turning the accepted test into a repeatable review.