After migrating to advanced risk assessments, open the Risk form and read Assessment Summary for the assessment scores and risk response. The legacy risk life cycle sections are replaced. When several methodologies apply, the displayed scores come from the default methodology for the selected entity class, so confirm that context before interpreting the result.
What changes on the Risk form after migration
The change is broader than moving a score to another part of the form. Migration removes the legacy risk life cycle, scoring, assessment, and response sections from the Risk form. Assessment Summary brings assessment scores and the risk response into the replacement section. A reviewer looking for the previous sections should first establish whether the instance has migrated, rather than assume that missing sections indicate lost assessment work.
The setting is named Migrate to Advanced Risk Assessments. The integration topic places it under Advanced Risk Assessment > Administration > Properties, while the setup topic places it under AI Risk and Compliance > Risk Assessments > Properties, so check the path your instance shows. It defaults to No. Setting it to Yes is one-way: legacy risk calculation cannot be restored afterwards. Treat checking the configuration and changing it as separate activities. For a post-migration review, establish which framework is in use before asking anyone to alter configuration. The behavior described here follows Brazil; check the configuration and labels against your instance and release.
Start a review with a named risk, its entity, and the assessment methodology being discussed. Those details give the score a usable context. A summary without that context can typically lead two reviewers to discuss different assessments while believing they are looking at the same result. For the broader setup sequence, see Advanced Risk Assessment in ServiceNow.
Read advanced risk assessments across risks and controls
Read the summary as the outcome of an assessment methodology. Advanced Risk Assessment supports assessment criteria, factors, and scoring logic that can vary with the methodology. A number alone does not explain which questions were asked or how the result was calculated. Before comparing it with another risk, check whether the two results use a comparable method.
- Identify the selected entity class. When several assessment methodologies are used, the system selects the default methodology for that entity class to determine the displayed scores.
- Check the primary methodology. The primary risk assessment methodology can be defined on the risk assessment methodology form. Resolve a methodology mismatch before treating a different score as an assessment error.
- Separate the assessment dimensions. Inherent risk, control effectiveness, residual risk, and target risk answer different questions. Do not compare unlike dimensions as if they represented the same exposure.
- Read the risk response alongside the scores. The summary includes the response, giving the reviewer a way to connect the assessment result with the strategy for dealing with the risk.
Inherent risk concerns exposure before controls are considered. Control effectiveness concerns the mitigating controls. Residual risk concerns the exposure remaining after controls are taken into account. Target risk describes the desired future level following the response. Keep those meanings distinct when preparing a review note or discussing whether further treatment is needed.
A residual result can be derived through a matrix, a mathematical formula, or responses to factors. Do not impose a spreadsheet calculation on a result without first checking the configured approach. If the method differs between two assessments, explain the difference before drawing a conclusion about improvement or deterioration.
Check controls, entities, and risk statements together
Controls have their own integration behavior: control effectiveness values are updated when individual control assessments are performed. A reviewer should therefore distinguish the effectiveness value on a control from the score displayed for a risk. They are connected assessment information, but they have different record contexts and should be investigated accordingly.
When a control value is questioned, frame the review around the individual control assessment. Identify the control, the assessment being discussed, and the evidence used to judge effectiveness. This gives the assessor a specific question to resolve. Asking why a risk score changed without naming the control assessment leaves the investigation too broad.
The Entity form also changes after migration. It displays aggregated risk scores from the primary risk assessment methodology, while tabs showing legacy scores are hidden. Compare an entity aggregate with its underlying assessment context before comparing it with a single Risk form summary. An aggregate describes a wider view than one risk result.
On the Risk Statement form, legacy assessment, framework, and scoring fields are hidden, together with corresponding older links for pushing risk scores. Include this form in migration acceptance checks so that reviewers understand the changed route through the information. Do not use the absence of those older links as a reason to recreate the previous workflow.
For related work on the assessment and control process, see risk assessment and control testing. Keep the immediate review focused on explaining the displayed result before broadening it into a redesign.
Use Risk Workspace to investigate a summary
Assessment Summary provides a starting point for review; the assessment instance provides additional context. Risk Workspace lets users access assessments assigned to them or their group. Its assessment home page shows the entity, due date, assigned person, approver, risk description, results, and selected response strategies. Use those details to identify which assessment needs attention.
Assessors need the sn_grc.business_user role, and the advanced risk assessment roles have to be added to that role manually. Apply that requirement to assessment work, not to administration or dashboard access. Apply that requirement to assessment and approval work. Do not infer from it that the same role grants administration access or access to a particular dashboard.
On the workspace Home page, the Risk Summary field includes a methodology filter. Work out the selected methodology when comparing that workspace view with the Risk form. A comparison becomes meaningful after both reviewers agree on the methodology and record context, rather than simply matching the wording of a rating.
The Contextual side panel provides reference information for associated risks and controls. It can show risk event losses, indicator breaches, control indicator failures, and open issues with severity. During control assessment, control test results and indicator failures provide context for the judgment being made. Treat that evidence as part of the review, rather than assuming a displayed rating explains itself.
For uncertainty about a factor, use Show guidance. Overall rating provides access to factor weighting and score information, including qualitative weight, qualitative score, and quantitative score. These details help a reviewer explain how the assessment was approached without guessing the significance of a factor from its name.
Resolve differences before accepting the review
Use a short investigation record when a summary appears unexpected. Record the risk and entity, selected entity class, expected methodology, displayed assessment dimension, and the question that needs resolution. Then compare those details with the assessment instance.
- If two views disagree, confirm their methodology and aggregation context before comparing values.
- If a control effectiveness value is questioned, examine the relevant individual control assessment.
- If an old field or link is missing, check whether it belongs to the legacy sections removed or hidden by migration.
- If the evidence does not support a conclusion, assign a specific follow-up question before accepting the interpretation.
For help planning this work, see ServiceNow implementation.
Close the review with a plain explanation of the result: which risk was considered, which methodology supplied the summary, what the residual exposure means, and which response is associated with it. Keep unanswered evidence questions visible so that a reader can distinguish the assessment outcome from work still required to understand it.
Questions about assessment routes and related views
Can an object assessment include controls and a risk response workflow?
Object assessments cannot assess controls. The risk response workflow is documented as unavailable for object assessments, but the Risk Workspace object assessment steps can show a risk response step when one is configured, so confirm against the configured methodology before relying on either behavior. Their methodology uses Object as the context and selects a relevant table. Keep that boundary in mind when relating a change record assessment to risks and controls. See ServiceNow change risk assessment for the neighboring change assessment topic.
Can the older overview dashboard still be used?
The Advanced Risk Assessment Overview and Risk Register dashboards are deprecated starting with Advanced Risk application version 18.1.0. Existing users and users on legacy releases can continue using them. Overview visibility requires sn_risk.manager; Risk Register visibility requires sn_risk.user. Account for that distinction when choosing a shared review view.
What access is required to assess project risks?
Project risk assessment requires it_project_manager and sn_grc.business_user. That requirement applies to the project assessment action. Project approval behavior also depends on the approvers identified in the Project Integration Configurations form, so check that configuration before expecting an approval request.
Can a project assessor explain a score override?
In project assessment, Override computed score exposes Override inherent risk. The assessor enters a justification in Comments. If a project result needs investigation, consider that recorded judgment as well as the calculated result before deciding whether the assessment reflects the intended interpretation.