Create scrum tasks for stories in Collaborative Work Management by opening a saved story, selecting Scrum Tasks, and adding named pieces of work. Each scrum task stays attached to its parent story and follows that story’s sprint. Use the breakdown to share responsibility and discuss daily progress without losing the story’s intended outcome.
Prepare the story before adding scrum tasks
Start with a story that describes the user’s need and the result the team is trying to deliver. A task list becomes easier to assess when people can explain how each item contributes to that result. For guidance on the parent record’s purpose, see what a story represents.
As a planning recommendation, describe work with a verb and a visible result. “Validate the approval rules” gives a teammate a clearer starting point than “Approvals.” For an illustrative approval story, the breakdown might cover rule analysis, implementation, testing, and supporting instructions. Choose tasks that fit the actual story rather than copying those categories into unrelated work.
Decide which experience the team is using before following a creation procedure. CWM provides a Scrum Tasks tab within the story form. Agile Development 2.0 also supports scrum tasks, but its creation route uses Stories and a related list. The steps below reflect Brazil behavior; check the controls and enabled capabilities on your instance and release.
Add scrum tasks manually in CWM
The role required for manually adding scrum tasks in CWM is sn_cwm.cwm_user. Board access also matters: a user with Viewer access cannot add scrum tasks. The scrum task work type must be enabled on the instance.
- Navigate to Workspaces > Collaborative Work Management.
- Choose a Board from a Space.
- Open the story from List, Gantt, Kanban, or Sprint planning.
- On the saved story form, select Scrum Tasks.
- Select Add new and enter the task name.
- Select the Save icon.
- Use + Add new to continue the breakdown.
The Scrum Tasks tab becomes available after the story is saved. If you are preparing a new story and cannot find the tab, save the story before looking for its child tasks. CWM also supports inline scrum task creation from List and Sprint planning.
After saving, inspect the task names together. As a team check, look for duplicated work, gaps between implementation and validation, and tasks that describe several unrelated outcomes. Resolve those issues while the story context is fresh. This review helps turn a collection of names into work that teammates can discuss and pick up.
Generate a breakdown with ServiceNow Otto
Generating scrum tasks for a CWM story requires sn_cwm_ai.cwm_ai_user. ServiceNow Otto uses the story’s description and context to propose child scrum tasks. Give the story enough detail to distinguish the requested result from nearby work before generating a list.
- Open the Board in Collaborative Work Management and select the story.
- Select the story form’s Scrum Tasks tab.
- Select Create with ServiceNow Otto.
- Review the recommendations against the story’s intended outcome.
- If the recommendations miss the work, select Refine > Regenerate.
- Select Insert to add the chosen breakdown to the story.
Generated tasks can be edited after insertion. A sensible review asks whether the proposed work belongs to this story, whether testing addresses the requested behavior, and whether task names distinguish one piece of work from another. Treat the generated list as a starting point for the team’s judgment.
There is also an immediate creation route. Hover over the story’s short description in List, Gantt, or Sprint planning and select the ServiceNow Otto scrum tasks icon. That route adds the generated tasks directly, without the review step. Choose the story-form route when you want to evaluate the suggestions before they become part of the breakdown.
For implementation support, see ServiceNow implementation.
Keep tasks aligned with sprint execution
In CWM, a scrum task belongs to a parent story rather than existing as a standalone Board work item. It inherits the story’s sprint. Moving the story to a different sprint moves its scrum tasks too; the sprint information cannot be edited on the scrum task record.
Use that relationship when planning carryover. As a planning recommendation, review the unfinished work before changing the story’s sprint. Confirm that the parent still describes the remaining outcome and that the team understands which tasks need attention. Do not plan to place individual child scrum tasks into separate sprints independently of their story.
A Kanban story card displays a scrum task indicator when it has child scrum tasks. Selecting the indicator opens a side panel with those tasks. This gives the team a way to inspect the breakdown while staying on the Board. Quick filters can focus the Kanban view on sprints, states, or other columns; a counter shows the number of active filters.
During a daily discussion, use the visible task list to identify work that has moved forward and work that needs help. As a team habit, discuss the obstacle and the next action together. For the broader planning context around scrum work, see scrum program setup and task planning.
Create tasks in Agile Development 2.0
The single-task and batch-creation procedures in Agile Development 2.0 list scrum_story_creator, scrum_admin as the required roles. Navigate to All > Agile Development > Stories, open the story, and select New in its Scrum tasks related list. Complete the form and select Submit. Another entry point is the Task board view of the Agile board’s Sprint tracking tab.
Review the relationship and ownership fields before submitting. The Story field identifies the parent. Assignment group is populated from the story’s Assignment group, while Assigned to initially uses the story owner. These defaults need attention when the person delivering a task differs from the person responsible for the story.
Use Planned hours for the estimate and Remaining hours for the current estimate of unfinished effort. The assigned group member updates Remaining hours as work progresses. After completion, enter Actual hours. The State of a new task defaults to Draft; the form also includes Type, Priority, Short description, Description, Blocked, and Work notes.
Use Blocked to indicate an issue preventing progress and Work notes to record progress or obstacles. A task that exceeds its planned effort can be divided further. In this workflow, a story is not complete until its tasks are complete. Creating a Scrum Task under a Story also makes the Story’s date fields read-only.
Create a batch without leaving placeholders behind
For Agile Development 2.0 batch creation, start in Stories, right-click the story number, and select Add Scrum Tasks. Enter how many tasks you need for Analysis, Coding, Documentation, and Testing, then select OK. The resulting records appear in the story’s Scrum Tasks related list.
Batch-created tasks start with the short description ToDo…. Open the records and replace that placeholder with the work each task represents. Add descriptions, priorities, and other relevant details. Creating the records together saves entry effort, but the team still needs a meaningful breakdown before using them to coordinate work.
As a review technique, read each task name without looking at its neighbors. If it is unclear what action the assignee should take, improve the name or description. Then read the list alongside the parent story to check coverage. Readers who also manage remediation work can read remediation task concepts separately.
CWM task boundaries that affect sprints, copies and imports
Why are child scrum tasks absent from Backlog?
In Sprint planning, scrum tasks appear in the sprint section rather than the Backlog section. Check the parent story’s sprint placement before concluding that the child records were not created.
Can a task be copied to another story?
CWM does not support copying or dragging a scrum task outside its parent story. Reordering is available within the parent story.
Does task progress calculate the story’s percent complete?
Scrum task percent complete does not roll up to the parent story in CWM. Percent complete tracking applies to CWM tasks, so do not use a presumed child-task rollup as the story’s completion measure.
Can Connected work import scrum tasks separately?
Connected work brings associated scrum tasks in when it imports their story. It does not directly import scrum tasks independently. Review the parent-story connection when investigating missing imported children.
Does deleting a scrum task remove its underlying record?
Deleting a scrum task in CWM removes it from viewing in CWM without deleting the underlying record. Account for that behavior when deciding whether a Board cleanup has removed the work record itself.