OBLYTECH Logo
OBLYTECH Logo

Set up a triage board in Agile Development 2.0

To set up a triage board in Agile Development 2.0, own a backlog and use the scrum_product_owner role. Create a triage definition from the Agile Board’s Backlog section, choose the source table and destination backlog, and retain the default filters. The board brings product-related operational records into a queue for review.

A triage board needs a single intake rule before it is created

Problems, incident tasks, defects and change requests can all reach a triage board, which lets a product owner review them before any work enters a backlog. The definition specifies a source table and filter criteria. Start by deciding which records belong in this review queue and which backlog should receive the stories created from them.

Write a short inclusion rule before opening the form. For example, a product team might want active defects relevant to its product, with no associated Agile story. Treat that as a proposed selection rule, then check that the fields and values needed to express it exist on the chosen table. A recognizable board name should tell reviewers what they are looking at.

You can create multiple triage boards, so a single broad queue is not compulsory. Separate definitions can give distinct categories of work their own review context. For example, one board can hold defects and incidents, and another can hold enhancements. Keep each definition narrow enough that its reviewer can explain why a record belongs there.

Agree who decides whether an operational issue deserves product work. The board can surface candidates, but your team still needs a decision rule for acceptance and priority. Use the Agile Development governance model to frame those ownership decisions before expanding intake across teams.

Only a product owner who owns a backlog can create the definition

Creating this triage board requires scrum_product_owner, and you must own a backlog before starting. Check those two prerequisites separately. Being able to open an Agile board does not establish that the user meets the prerequisites for creating a triage definition.

The Agile board has separate tabs for the Backlog, Sprint Planning and Sprint Tracking work, so a product owner can manage the backlog, plan sprints and follow sprint progress from one place. Its broader access roles include scrum_admin, scrum_master, scrum_product_owner, and scrum_sprint_planner. For this setup procedure, use the specific product owner role rather than assuming that another board role grants the same action.

These steps match the Brazil release of Agile Development 2.0. Menu names and fields can differ on your instance, so check them against your own release before you start. Establish the intended backlog first so that the triage definition has a deliberate destination. Record the backlog name in your setup notes alongside the board’s purpose and proposed source table.

Do not substitute the SAFe procedure when working in Agile Development 2.0. SAFe triage setup requires safe_scrum_master and has separate plugin, team membership, and current program increment prerequisites. Those requirements belong to that workflow. Identify which application and board you are actually configuring before diagnosing missing navigation.

Creating the definition takes seven steps from the Backlog section

  1. Navigate to All > Agile Development > Agile Board > Backlog.
  2. For the first definition, select Triage Board > Set up Triage Board. If a definition already exists, select Triage Board > New Triage Definition.
  3. Enter a Name that identifies the intake queue.
  4. Choose the Table containing the records you want to assess.
  5. Build the Filter for that table, retaining the two default conditions described below.
  6. Set Backlog definition to the backlog that should receive stories created from this board.
  7. Select Submit.

Check the name, the table, both default conditions and the Backlog definition value before you select Submit.

After submission, the definition is accessible through the Backlog section of the Agile board. Open Triage Board and select the board you created to inspect its contents. Verify the result before treating the queue as ready for regular review.

A useful first check is to find one record you know well in the queue and confirm that it meets the table and both default conditions and does not already have a story.

The table limits which records the filter can select; the Backlog definition sets where the resulting stories land.

For help planning this work, see ServiceNow implementation.

The default filter keeps the queue to active, unlinked work

Keep Active is true and Agile story is empty in the definition. These conditions serve different purposes. The active condition excludes completed or canceled tasks. The Agile story is empty condition keeps out any task that already has a story or already sits in another backlog.

Add product-specific conditions around that starting point without removing its safeguards. Before submitting a revised filter, inspect the full selection logic. Your goal is a queue of relevant active work awaiting a backlog decision, rather than a historical list or a second intake route for work already converted to stories.

Validate with contrasting records. Choose an active record that meets your intended product criteria and has no Agile story. Compare it with a completed record and a record that already has a story. Review whether the resulting board reflects those differences. This is a suggested acceptance check, not a requirement to create artificial production records.

If the queue is empty, inspect the source table and additional filter conditions before broadening it. An empty result may be correct when no records satisfy the definition. Removing the default conditions to produce a fuller board changes the meaning of the intake queue and can obscure the underlying selection problem.

To change an existing filter, select Triage Board > Edit Triage Definitions. Keep a short record of the change and the records used to verify it. Broader review habits belong in your Agile Development best practices, so future owners can repeat the same checks.

Accepted candidates become backlog stories through the Backlog field

Adding triage items to a backlog also requires scrum_product_owner. In the Agile board’s Backlog section, select the intended product or team backlog in the Backlog field. Open Triage Board and choose the definition whose items you want to review.

Review the candidates, select the items that should become product work, and select Add to Backlog. Selected items enter the backlog as stories. Each has an associated original item, allowing the product owner to preserve the operational context while planning the development work.

You can switch between the original item’s Information and Story Information tabs from the Agile board. The associated story references the source record in Original task. Use that relationship when checking that the accepted story represents the intended defect or other task, rather than relying on similar short descriptions.

Story creation does not finish prioritization. Stories created from the handoff still need an owner. Assign each one to a product team, then schedule it into a sprint from the Sprint Planning tab. The Sprint Planning tab provides the planning context. Review sprint planning boards when the next question concerns how accepted backlog work fits into delivery planning.

For an initial acceptance review, follow one suitable item through the handoff and inspect the destination backlog and source relationship. Then assess the story’s readiness for planning, including missing story points or acceptance criteria. The Backlog tab has cards that expose stories missing those details, giving reviewers a way to identify refinement work after intake.

Reviewers can also use the keyboard to move and rearrange accepted stories in the Backlog and Sprint Planning tabs. The required role is scrum_admin, scrum_master, scrum_product_owner or scrum_sprint_planner. Press Tab to highlight the story, Tab again to highlight its context menu icon, and Enter to select the story. Use the up or down arrow keys to move it, then press Enter to fix its position. To move several stories together, select the first story with Enter, then use the down arrow key with Shift and Enter for consecutive stories, or with Control and Enter for stories in other positions. Press Tab to highlight the context menu icon on a selected story and press Enter to group the selection. Move the group with the arrow keys, then press Enter to fix its position.

When a reviewer reports that an expected item is missing, work through three questions in order: is the selected board the intended definition, does the record meet its table and filter criteria, and does it already reference an Agile story? When an accepted item seems absent from planning, inspect the backlog choice and associated story before changing the intake filter. These checks separate selection problems from handoff problems and keep troubleshooting focused on the record involved.