OBLYTECH Logo
OBLYTECH Logo

Sprint Planning and Boards in CWM: Step-by-Step Guide

Sprint planning in Collaborative Work Management runs from the Sprint planning tab of a board. You create sprints with a duration, dates and story point capacity, drag backlog items into them, and then start, complete, edit or delete each sprint from its header.

How the sprint cycle fits together on a CWM board

A CWM board runs as one loop. A team sets up a Space and a Board, builds the backlog, plans sprints, runs them on a Kanban view, and can close each sprint with a retrospective board. Scrum tasks can break stories down along the way. Sprint planning is the stage where scheduling decisions get made, and its controls sit on one tab.

Teams that used the unified backlog in Agile Development 2.0 can bring incidents, defects and other records into a CWM board with Connected work, then plan them into sprints alongside stories. Program-level planning, such as PI planning, stays in EAP, and EAP teams can connect to CWM so sprint work runs in CWM while program visibility remains in EAP.

Opening the sprint planning view

Go to Workspaces, then Collaborative Work Management. Choose the Space, open the Board, and select the Sprint planning tab. If the tab is missing, switch it on from the Views section of the Personalize side panel, then save the board view so it keeps showing.

Each work item already on the board lands in the Backlog pane, old or new. Older incomplete work stays visible beside fresh items, and completed items are left out, so the pane shows what still needs scheduling.

Setting up the first sprint and the ones after it

A board with no sprints shows a setup form in the Sprints section. You enter the duration, the start and end dates, and the story point capacity. Once a sprint exists, you choose one of two routes for the next one.

Route Use it when What happens
Add another Sprint The next sprint keeps the duration and story point capacity of an existing sprint A sprint is created from the existing settings
Create Sprint The duration or story point capacity differs A form opens, you fill in the details, then select Create Sprint

Each sprint appears as a collapsible section that reports the share of its capacity already used and the story points remaining.

Moving work from the backlog into sprints

Drag items from the Backlog and drop them onto a sprint section. The drop works even when that section is collapsed. To move work between sprints, select the items and drop them on the target sprint. The same drag gesture covers both moves.

The Backlog also offers controls before anything is scheduled. You can move an item to the top or bottom by priority, move it into the sprint that is running, rearrange rows, delete rows, filter on a column, and change how many rows appear per page. Filters do not work on custom columns, so build filters around the standard fields.

Copy row duplicates CWM tasks and stories. Connected work records from other ServiceNow applications cannot be duplicated this way, so handle those in their source application. Teams that need more room can show the Backlog, the Sprints, or both panes.

Adding new work items without leaving the planning view

In the Backlog pane, select the Add item icon and choose an item type from the Item type list. In a sprint header, the same icon creates the item directly inside that sprint. The default type is Task. Story becomes available once it is enabled on the board, and custom work item types can sit alongside it.

The form asks for a short description, start and end dates, story points and other fields. Select Submit. Creating from the backlog adds the item to the Backlog, where it can be planned later. Creating from a sprint header creates the item directly in that sprint.

Stories can also be broken down into scrum tasks. ServiceNow Otto can draft them from the story’s description and context. With review, the suggestions appear on the Scrum Tasks tab, where you can select Refine, then Regenerate, before choosing Insert. Without review, the Otto icon on the story short description adds them immediately.

Editing and deleting a sprint

Sprint dates, duration and capacity can be changed after creation. Open the More options icon on the sprint header, select Edit, change the fields and select Save. This suits changes made mid-cycle, such as a capacity reduction when team members are away.

Deleting uses the same menu. Open More options, select Delete, then confirm in the Delete Sprint dialog. The sprint is removed, and active incomplete work items scheduled in it move back to the backlog.

Starting and completing a sprint

Select Start in the sprint header when the team is ready. From that point the Kanban view tracks work in progress as people move story cards across state lanes. Quick filters narrow the board to one sprint or one state.

To finish, select Complete Sprint in the sprint header. The review step lists completed and open items. Move each incomplete item into the next sprint or back to the backlog, then select Complete Sprint to confirm. The sprint leaves the Sprint planning view, and its open items go where you chose.

Running a retrospective after a sprint closes

The completion step also offers a retrospective board. Choose that option, enter a name, and pick a template. The default is the Agile Retrospective template, and other templates are available through the templates for Boards and Docs in CWM. The new board is created in the same Space, and you can open it from the success message or the left navigation panel.

Create the board during completion, since that is where the option is offered. This ties it to the sprint you just closed and gives the team one place to record what went well and what to improve next time.

Tracking sprints with the team sprint tracker

The Team sprint tracker dashboard covers active sprints that have started and are not yet complete. Its widgets are listed below.

Widget What it shows Notes
Sprint progress Points completed as a share of total scope Scrum tasks are not counted
Sprint tasks missing estimates Scheduled items with no story points Single score
Sprint burnup Completed points, total story points in scope and ideal pace Needs the daily sprint data job
Sprint burndown Remaining work against total scope, tracked daily Needs the daily sprint data job
Sprint velocity Committed and completed points for recent sprints, with a running average Shows the last six completed sprints; needs at least one
Sprint spillover Points carried over from past sprints into the active sprint Accurate for sprints completed after version 11.0.1
Sprint tasks by state Tasks grouped as Open, Work in Progress, Completed or Other Bar chart
Sprint workload by assignee Task count per assignee Unassigned tasks are grouped together

For more on the measures used in agile reporting, see agile development KPIs and metrics.

The burnup and burndown charts depend on the CWM Daily Sprint Data Collection scheduled job. The job must be enabled, with its Run as and Run as tz fields set. Once it first runs, active-sprint data is collected daily and chart data appears from the following day.

To create a dashboard, open the Dashboard tab, select New dashboard, enter a name and select Create. The dashboard opens empty with an Add widgets option. Space owners and editors can create dashboards, and space viewers can view them. Dashboards are shared with everyone who has access to the board. In My Space, the team sprint tracker appears as My sprint tracker.

Customising the Sprint planning view and other board views

The Personalize icon appears on the List, Gantt and Kanban views. On List and Gantt you can rearrange and show or hide columns, pin a column to the left of the grid, filter from a column, or reset a column’s size. On Kanban you change the vertical lane field, which sets how task cards are grouped vertically.

Inside the Sprint planning view, the same side panel shows or hides columns in the Backlog and Sprints panes. Save changes to the current board view, or save them as a new view if the setup is for the whole team.

Hide a board view from the Views tab of the Personalize side panel, and show it again from the same tab.

Frequently asked questions

Can I plan work before the first sprint exists?

Yes. Work items on the board appear in the Backlog straight away, and the Sprints section shows a setup form until the first sprint is created.

What happens to unfinished work when I complete a sprint?

You decide during completion. Each incomplete item can move into the next sprint or back to the backlog, and the sprint then leaves the Sprint planning view.

Does deleting a sprint remove its work items?

Active incomplete work items scheduled in the sprint move back to the backlog, so they stay available for scheduling.

Why does my burndown chart show no data?

The CWM Daily Sprint Data Collection job has to be enabled, with its Run as and Run as tz fields set. Chart data starts the day after the job first runs, so a new setup looks empty until then. For other setup problems on agile development boards, see the agile development troubleshooting guide.

Can I filter the backlog on any column?

Yes, with one exception. Custom columns in the Backlog pane cannot be filtered, so use the standard fields when you build a filter for a planning session.