OBLYTECH Logo
OBLYTECH Logo

Assign contact tracing badges to employees

To assign contact tracing badges to employees, create a User Badges record, enter the unique Badge number, select the employee in User, and set the Facility code. Mark the badge Active when it is ready for use. Employees can then use active badges with readers at controlled workplace entry and exit locations.

Prepare employee and badge details for contact tracing

Start with the person and the physical credential together. The assignment joins a badge identifier to an employee; an incorrect match can undermine the interpretation of workplace movement records. Before entering records, reconcile the badge allocation list with the employee names that the badge manager will select.

The role for adding and editing user badges is sn_imt_tracing.badge_manager. Give the assignment task to someone with that role. Keep the responsibility for checking employee identity explicit: the person entering the record needs a reliable way to distinguish employees with similar names.

Prepare three values for each assignment: the unique badge number, the employee who owns it, and the facility code identifying the original location of the employee and badge. Preserve meaningful characters when transcribing identifiers. Compare the value entered with the credential being handed over, not with an unverified spreadsheet row.

Confirm the field names against your instance and its release before you apply this procedure. Badge records support readers at building entrances, exit gates, and floors. Identify which controlled locations are in scope so the handover team knows where an employee is expected to use the credential.

Create the employee badge assignment

  1. Navigate to All > Contact Tracing > Badge Management > User Badges.
  2. Choose New for a new user badge. To correct an assignment already recorded, open that user badge instead.
  3. Enter the credential identifier in Badge number. This field holds the unique badge number.
  4. Select the employee who owns the badge in User. Check the selected person against the allocation record before continuing.
  5. Enter Facility code using the code for the original location of the employee and badge.
  6. Set Active according to whether the badge is ready to be used, then click Submit.

The Active field has an immediate operational meaning: badge readers accept active user badges for swiping. A completed identifier and employee assignment do not remove the need to check that field. Include it in the handover check so a credential is not issued while its record remains inactive.

After saving, reopen the record and compare its employee, identifier, facility code, and active setting with the intended assignment. Treat this as a data accuracy check. Recording the right person on the wrong badge is a different failure from omitting a field, and a form that saves successfully does not settle that distinction.

For larger allocations, user badge data can also be imported from an Excel spreadsheet. Prepare and review a small sample before loading the full allocation as an operational precaution. Check identifiers and employee matches after import instead of assuming that the source file’s appearance guarantees correct stored assignments.

Check the handover and investigate mismatches

Use a short acceptance checklist before closing the assignment work. Confirm that the employee received the credential corresponding to the stored Badge number, that User identifies that employee, and that Facility code describes the original location. Include the expected controlled location in the handover notes so the check has a clear context.

If a badge cannot be swiped, inspect Active first. If an activity record appears to concern the wrong employee, compare the physical credential identifier with Badge number and User. Changing an employee association will not explain an inactive credential, and activating a badge will not correct an incorrect employee selection.

Next, separate record correction from investigation of reader data. A badge assignment establishes the employee association, while badge swipe data is held in the Badge Access Register. Record the location and time of a test, so the team investigating collected data has something specific to reconcile.

Route unresolved issues to a named owner with the identifier, expected employee, location, and observed behavior. Broader routing practices are covered in contact center case escalation. Keep sensitive tracing details within the access arrangements established for the investigation.

For help planning this work, see ServiceNow implementation.

Keep badges and wearable assignments distinct

An employee may also receive a wearable device. Record that allocation through All > Contact Tracing > Wi-Fi Access Management > Wearables, using sn_imt_tracing.wifi_manager for the wearable action. The Wearable Technology table, cmdb_ci_wearable, requires the CMDB CI Class Models application to be installed and active.

The wearable form uses Name for its unique name, Asset tag for its unique identifier, Assigned to for the employee, and Category for the device category. MAC address is also required for contact tracing; add that field to the Wearables form through form layout configuration. Click Submit after entering the device details.

Maintain a clear allocation record when an employee has both kinds of equipment. The badge’s User field and the wearable’s Assigned to field each need the intended employee. Do not use matching display names for devices as a substitute for checking their identifiers. For governance of device records, consider the responsibilities described in a CMDB ownership model.

Wearable risk scoring introduces another data path. The Devvio DevvTrace platform can supply risk scores through an integration, whereas the badge assignment procedure records who owns a credential. If the operational question concerns a score rather than a badge association, hand it to the team responsible for that integration with the relevant device and employee details.

Coordinate privacy outreach and badge data retention

Plan employee communications alongside allocation. Creating or configuring privacy consent outreach requires sn_imt_checkin.checkin_admin or admin, with Emergency Outreach installed and location-based privacy configurations generated. In All > Emergency Outreach > View Outreaches, the outreach configuration selects its audience and uses Privacy Consent as the Response mode.

Before relying on that outreach, check employee profile locations. Privacy consent outreach is not sent to selected users whose profiles lack a location or whose location privacy configuration disables consent. An audience selection therefore needs a corresponding location review; it does not by itself establish that an employee will receive the request.

The admin role configures retention. Under Contact Tracing > Administration > Properties, set Contact Tracing data retention period (in days) and click Save. The underlying property is sn_imt_tracing.data_retention_period, with a default of 90 days. Choose the retention setting through the organization’s data governance process.

The Data Retention Job For Contact Tracing checks updated dates against that period and deletes eligible records, including badge swipe data in sn_imt_tracing_badge_access_register. Under System Definition > Scheduled Jobs, open that job, configure its settings, and click Save. Coordinate its timing with investigations that depend on retained movement records.

A separate Purge Contact Tracing Deleted Records (Data Retention) job removes eligible deleted tracing records from Audit Deleted Record. This job is not installed by default. Download its XML file from the Contact Tracing application page on the ServiceNow Store, then under System Definition > Scheduled Jobs import it into the Scheduled Job table in the Global scope. Open the Purge Contact Tracing Deleted Records (Data Retention) record, select Active, set the schedule in the Run field, and click Update. It purges deleted tracing records whose updated date is past the retention period. Distinguish the deletion schedule from that subsequent purge when investigating missing historical data. A broader discussion of record history is available in ServiceNow history tables.

Questions about employee badge rollout exceptions

Does enabling Use Country change the privacy text employees receive?

Yes. With Use Country enabled in outreach content configuration, the location privacy statement takes precedence over the privacy consent template text. Update the location’s statement when that is the text the intended audience needs to receive.

What must employees have to receive mobile push outreach?

Employees need the Now Mobile app on their phones. The Now Mobile Push notification option also depends on the ServiceNow NowMobile App Screens and Applet Launcher plugin being active. Check the employee’s ServiceNow Request Application notification device is active.

Will overlapping privacy audiences send repeated consent notifications?

The privacy consent notification is sent once to a user even when that user belongs to the target audiences of multiple privacy notifications. When reconciling communications, consider overlapping membership before expecting separate notifications from separate outreach records.

Can a daily contact log request complement badge collection?

Yes. Daily log outreach asks employees to submit the coworkers they interacted with that day. Configuring it requires sn_imt_checkin.checkin_admin or admin through Contact Tracing > Administration > Daily Log Alerts. Plan its audience and schedule around the employee reporting process.

Are case surveys deleted with eligible tracing cases?

A survey associated with a case eligible for retention deletion has its own retention period. Do not assume that deleting the case applies the same lifecycle to its survey when reviewing the data still available after cleanup.