OBLYTECH Logo
OBLYTECH Logo

Find chemical and asbestos safety data sheets in the safety register

A safety register gives employees a route to chemical and asbestos Safety Data Sheets in Employee Center. Open Health and Safety, choose View safety register documents under Quick links, and select the material. The documents come from attachments maintained in Health and Safety Workspace; employees can search the list before opening a sheet.

Find a safety register document in Employee Center

Start with the material you need to identify. Have its name available, and consider which location or register category may help distinguish it from similar entries. A recognizable search result is a starting point: check that the document you open belongs to the material involved in your work.

  1. Navigate to All > Self-Service > Employee Center.
  2. Select the Health and Safety menu.
  3. Under Quick links, select View safety register documents.
  4. Use the list search field or the available list filters to narrow the results.
  5. Select the chemical to view its Safety Data Sheet.
  6. Download the sheet if you need a copy.

No role is required for this viewing action. That differs from maintaining register records, which has its own role requirement. When investigating an employee access problem, test the employee route itself rather than treating a successful workspace session as proof that the employee can reach the document.

The menu names and quick links in this section follow the ServiceNow Brazil release. Menus can differ on a customized portal, so confirm them on your instance before you rely on them. Keep those instructions focused on the route employees actually use, especially where a local portal has additional navigation.

Recognize the material behind the search result

The register connects information about hazardous materials with their attached documents. Chemicals and asbestos are register categories managed by the safety team. An employee looking for an SDS needs the relevant material entry and its associated file, rather than a general document that happens to contain a similar term.

Use the search field to reduce a long list, then examine the remaining choices. If your first query returns too many candidates, try a more distinctive part of the material name. If filters are limiting the list, review those selections before concluding that the record is missing. Treat these as search checks, not changes to the underlying register.

For an asbestos document, begin with the same Employee Center document route and identify the appropriate register entry. Avoid assuming that a chemical result with a familiar name covers a different material. If the match remains uncertain, give the safety team the material name and work location so it can identify the intended record.

Agreeing how material names are maintained helps make this search repeatable. For the broader ownership decisions behind those names, see data governance and source authority. A naming decision should help the employee distinguish records, not simply make an administrative list look consistent.

Trace a missing sheet to its register attachment

Safety Data Sheets added to safety registers in Health and Safety Workspace are available for employees to view through Employee Center and Now Mobile. This makes the workspace record and its attachment a sensible starting point when an employee cannot find the expected sheet.

First separate three observations: the material does not appear in the search results; the material appears but the expected document is absent; or a document opens but does not match what the employee needs. Record which situation occurred. Each gives the register manager a different check to perform and avoids an unhelpful report that the whole register is broken.

For a missing result, capture the search terms and filters used. For a missing attachment, identify the material entry that was opened. For an unexpected file, describe the mismatch without replacing the attachment yourself. The register manager can then compare the employee report with the saved workspace record.

When documents have been brought across from another source, include an attachment check in reconciliation. A record count alone does not establish that the intended file is associated with the intended material. The related planning work is covered in data migration, reconciliation, and cutover.

Maintain chemical and asbestos records in the workspace

Managing safety registers requires the sn_hs_rm.safety_register_manager role. Use that role requirement for creating or modifying the register record; do not apply it to the employee viewing procedure. Keeping the two actions distinct helps support teams route a correction to someone who can make it.

  1. Navigate to All > Health and Safety > Health and Safety Workspace.
  2. Select the configuration icon and open the Configuration tab.
  3. Select Safety Registers, then Chemicals and All, or Asbestos and All.
  4. Select New to create a register record, or open the existing record that needs review.
  5. Complete the form fields for the material.
  6. In the Safety data sheet field, select Attach File and attach the relevant document.
  7. Select Save.

The saved record appears in the register corresponding to its type. The same maintenance procedure includes Other and All for other hazardous materials. For this chemical and asbestos lookup, keep attention on the category that represents the material being searched for rather than creating another entry simply because the first search failed.

Coverage matters as much as accuracy. Add a record for every hazardous material used in the organization, including those held in the Other register, so that a missing sheet points to a real gap rather than to a search fault. Once saved, the record appears under the Chemical, Asbestos, or Other register in the Safety Registers list, and the attached sheet becomes available to employees through Employee Center.

Before saving a correction, compare the selected material with the file being attached. After saving, return to the employee document route and check that the intended sheet can be found and opened. This check joins the administrative action to the employee outcome instead of stopping when the form saves successfully.

For help planning this work, see ServiceNow implementation.

Check the employee journey before handing it over

Use a small set of known chemical and asbestos records for a handover check. Choose records whose expected attachments the safety team can identify. The aim is to establish that a person can reach the intended document through the published route, not merely demonstrate that the register contains records.

  • Find the material using its name and note whether the result is distinguishable from similar entries.
  • Review the filters used so another employee can repeat the search.
  • Open the document and compare it with the expected attachment.
  • Try the optional download if the employee workflow calls for a saved copy.
  • Route a mismatch back to the register manager with enough detail to identify the record.

Assign an owner for correcting record names and document associations. Also decide who receives employee reports when a sheet cannot be found. These are operating decisions to make during handover; a working search screen does not by itself settle responsibility for the information behind it.

The attached file is what employees open, so an out-of-date sheet on a record is the same problem for them as a missing one. When you replace a sheet, the update is only complete once the saved record shows the new file.

For a wider view of how records support the user journey, see workflow and data context design. In short, an employee finds the material, opens its record, and reaches the attached sheet.

Write the handover result in terms another person can repeat. For example, record the selected register category, the material searched for, and whether the attached file was the expected one. This gives the next person a clear starting point.

When correcting an ambiguous name, consider how an employee would describe the material without seeing the workspace form. Ask the safety team to review that wording alongside the document association. The goal is to reduce uncertainty at selection time while keeping the record connected to the material it represents.

Use Now Mobile when checking mobile access

The Now Mobile app provides another route to the register documents. Open the app, tap Home in the navigation bar, and find Quick links. Tap Safety register documents, select the material, then tap the associated document to open it.

On mobile, the Register type and Location filters help narrow the list. Alternatively, enter the chemical name in the search bar. A safety admin can configure search criteria in Now Mobile, so include the actual query and filter values when reporting a mobile search problem.

Test the channel employees expect to use at work. A successful desktop lookup is helpful evidence about the attachment, but a mobile handover should include opening that document on the mobile route. Keep the record identity consistent when comparing the two journeys so differences in search selections do not confuse the result.