A safety risk assessment should lead to clear work on the hazards it identifies. A risk assessment only changes anything once someone is handed a specific piece of work. In Health and Safety Workspace, that work is recorded as a safety action tied to the hazard it addresses. A hazard or control measure can have several actions, so separate the work into tasks that people can carry out and check.
Prepare the safety risk assessment for action
Start with the assessment that describes the work and location involved. Check that the hazard, exposed people, and intended controls are clear enough for someone outside the assessment team to understand. An action that says “improve safety” leaves the recipient to decide what problem needs attention. Describe the change needed and how the team will recognize that it has happened.
Use the assessment fields to establish context. Location identifies where the assessment applies. People at risk identifies affected employees, groups, or other people. People responsible for control identifies those responsible for implementing control measures. Assigned to and Assignment group identify responsibility for managing the assessment record. The person who assesses the loading-area hazard does not have to be the one who repositions the equipment, so name each one separately.
Creating an assessment requires sn_hs_rm.risk_assessment_manager or sn_hs_rm.risk_assessment_writer. After saving the assessment, the Risk analyses, Risk actions, and Action schedules tabs become available. These instructions follow Brazil behavior; check labels and availability on your instance and release before using them as a team procedure.
Choose the right route for adding actions
Adding a safety risk action requires sn_hs_rm.risk_assessment_manager, sn_hs_rm.risk_assessment_writer, or sn_ohs_im.action_writer. This action permission differs from the permission to conduct the underlying assessment. Confirm the role for the activity the person needs to perform before investigating a missing creation option.
Navigate to Workspaces > Health and Safety Workspace, then select the risk management icon. From there, choose between scheduled actions associated with an assessment and direct creation through the Risk actions list.
- For scheduled work, select Risk assessments, then All, and open the relevant assessment.
- Use its Action schedules tab to set up actions for that assessment.
- Check the resulting actions in Risk actions. The schedule creates actions there and assigns individuals using the condition builder.
- For direct creation, select Risk actions, then All, and select New.
- Complete the action form and select Save.
Actions can also be added from the Actions tab on a Health and Safety record or through Action planner in the contextual sidebar. Choose a route that preserves the context the recipient needs. When an action is associated with an assessment, verify that it appears within that assessment rather than assuming the association from its description.
Split one hazard into work people can complete
A single hazard may need more than one response. Consider a hypothetical loading area where people and moving equipment share space. A team might need to change the physical arrangement, clarify how the area is used, and check the arrangement during operations. Treat these as separate pieces of work when their owners or completion evidence differ.
Several actions can be added for a hazard or control measure. Use that capability to make responsibility visible. Combining unrelated changes in one action can make a partial result look complete. Splitting work too finely creates a different problem: recipients lose sight of the control the actions are meant to establish.
Before saving, review the proposed work against three questions:
- Does the action describe an observable change connected to the identified hazard?
- Can the recipient tell what evidence would show the work has been carried out?
- Is another action needed because a different person must complete a separate part of the control?
These are planning checks, rather than additional product fields. Write the action so its meaning survives a handoff between the assessor and the person doing the work. For a broader discussion of evaluating controls, see risk assessment and control testing.
Verify the action reaches the assigned person
Saving the action is the start of the follow-up. An action associated with a risk assessment appears in that assessment’s Risk actions tab. It also appears in the Risk actions list in Health and Safety Workspace. Check both locations when confirming that the task was created in the intended context.
The assigned user receives the action in My Tasks in Employee Center and the Now Mobile app. They can respond to the action and update its status from either location. Ask the recipient to confirm that the wording makes sense in the task view they use, especially when the action was created by someone who has more background knowledge.
If a recipient cannot find an expected action, first compare the actual assignment with the intended person. For scheduled work, inspect the condition builder used for assignment. Then check the assessment association and the workspace list. This sequence helps distinguish an assignment problem from an action that was never created or was associated with a different assessment.
For help planning this work, see ServiceNow implementation.
Check the control effect before completing the assessment
An action records work to address a risk; risk analysis evaluates the hazard and its controls. Performing risk analysis requires sn_hs_rm.risk_assessment_manager or sn_hs_rm.risk_assessment_writer. Open the assessment and use Risk analyses to add analysis records. Within a risk analysis, use Hazard assessments to review hazards and their controls.
Inherent risk describes the risk before controls, while residual risk describes the risk after controls. Risk levels use severity and likelihood. Review the control in place before treating the intended reduction as established. Completed actions show that work was done, not that the risk has fallen; the overall rating comes from the highest identified risk in the Risk analyses list, so check the Residual risk view after the analyses are complete.
The assessment’s overall inherent and residual risk levels reflect the highest identified risk in its Risk analyses list. Another hazard may still determine that result. Use the Risk matrix section to inspect Inherent risk view and Residual risk view after the analyses are complete.
When hazard assessments for a risk analysis are complete, set that analysis State to Complete. Repeat for the remaining analyses. Once all associated risk analyses are finished, use Details to enter Assessment completed and set the assessment State to Complete.
If the team also needs ongoing checks of whether controls remain effective, consider the separate purpose of continuous control monitoring indicators. Decide what should be observed after implementation, who will observe it, and what finding should trigger further work.
Keep action evidence connected to wider control decisions
When a safety control also supports an organizational requirement, record the relationship clearly in the team’s working evidence. State which hazard the action addresses and what change it supports. A policy statement alone does not show that a workplace control has been implemented, and an action description alone does not establish that the risk has been reassessed.
Use compliance frameworks and control mapping when considering how a control relates to broader obligations. Keep the safety decision understandable on its own: the assessor should be able to explain the hazard, the selected measure, the work assigned, and the reason for the resulting risk judgment.
Questions about sharing and reviewing safety actions
Sharing an action without sharing its risk
Yes. Copy action creates a duplicate that can go to another team or agent without the parent risk attached. The duplicate lands in the assignee’s My Tasks in Employee Center and in the Actions list in Health and Safety Workspace, so check the copied wording against the receiving location. The duplicate appears in the assigned user’s My Tasks in Employee Center and in the Actions list in Health and Safety Workspace. Review the copied wording for the receiving location.
Who can be assigned as an approver
The selected approver must have sn_hs_rm.risk_assessment_approver. Assigning an assessment to an approver requires sn_hs_rm.risk_assessment_manager. Plan that handoff separately from action creation so the person preparing the work does not assume they can also assign approval.
Covering several predefined jobs in one assessment
Yes. Jobs to be assessed supports multiple predefined jobs from the job register. Before assigning actions, check whether the same control change applies across those jobs or whether each job needs a different response.
How the risk matrix is chosen for an assessment
Select a risk matrix presents active records from the Risk matrix table. When one active matrix exists, it is selected by default. Check that the selected matrix suits the assessment before interpreting severity and likelihood against it.
Access needed to link an assessment to an audit
A user associating the assessment with another record, such as an Audit, needs access to that assessment. Review the assigned users before planning the association. Only users with access to the assessment can associate it with another record, such as an Audit, so review the assigned users before planning that link.