OBLYTECH Logo
OBLYTECH Logo

Branch a Virtual Agent Conversation With a Decision Utility

To branch a Virtual Agent conversation with a Decision utility, open the topic’s Flow tab, add the utility, and define a condition for each branch. A branch is followed when its condition evaluates to true. Use distinct branch names and test the input choices that should lead to each outcome.

Plan the Virtual Agent Decision utility branch logic

Start with the question the conversation must resolve. A Decision utility directs the conversation according to conditions; the design work is deciding which input should justify each route. Write the intended outcomes before adding nodes so that branch labels, condition logic, and the next conversation steps describe the same decision.

For example, consider a topic that asks whether the employee already has a device. One route could continue with questions about the existing device, while another could collect requirements for a new one. This is a design example: choose outcomes that fit your own topic rather than treating these routes as predefined product behavior.

Make a small test record for each proposed route. Include the answer supplied by the user, the branch you expect, and the next question that should appear. This separates a condition error from a conversation design error. A technically correct branch can still ask an irrelevant follow-up if the intended outcome was unclear.

If you are still deciding what belongs in a topic, the plain-language Virtual Agent guide provides broader context. Keep this branching change focused on the point where an answer changes what the conversation should do next.

Open the topic and add the Decision utility

The role required for this branching procedure is virtual_agent_admin or admin. Arrange access for the person editing the topic before starting the change. Do not infer additional permissions for unrelated administration tasks from this requirement.

  1. Navigate to All > Conversational Interfaces > Assistant Designer.
  2. Select Asset library, open the intended topic, and view the Flow tab.
  3. Drag the Decision utility onto the canvas at the point where the conversation needs to branch.
  4. Inspect the branch beneath the new node before adding further routes.

A newly added Decision utility starts with one branch named Always. Treat that initial canvas state as the beginning of configuration. Before considering the decision complete, review its branch properties against the outcomes you planned.

Check navigation on your instance and release. Yokohama and Xanadu use All > Conversational Interfaces > Virtual Agent > Designer. Zurich uses Assistant Designer and includes an LLM or NLU/Keyword topic discovery type toggle in Asset library. Select the type appropriate to the topic there.

Choose the insertion point by reading the conversation from the user’s perspective. The answer needed by a condition should already have been collected when the conversation reaches the decision. Sketching that order before editing makes it easier to spot a branch that depends on information the user has not supplied yet.

Add branches and give each one a clear condition

Select the plus sign (+) beneath the Decision utility node to add a second branch. That new branch is also named Always initially. Use the same plus sign to add further branches as needed, then select a branch label to open its properties.

The Name field identifies the branch and must be unique. Choose a name that describes the outcome clearly enough for another topic editor to understand. In the device example, names describing an existing-device route and a new-device route would be easier to review than labels such as “Option one” and “Option two.”

The Condition field defines the expression logic governing that route. The condition must evaluate to true for the conversation to follow the branch. Review the expression itself, rather than assuming that a descriptive name establishes the routing behavior.

  • Use Condition and the Condition builder to create or change conditions.
  • Use Script and the script editor when defining the condition through a script containing a condition statement.
  • Define the properties for each branch, including the original branch supplied with the node.

Keep the relationship between input and outcome visible during review. Ask a colleague to read the user’s answer and predict the branch from its condition. If that requires an explanation outside the topic, consider simplifying the logic or clarifying the outcome name before adding more routes.

Do not build a decision around an assumed tie-breaking rule. As a design check, look for answers that could satisfy more than one of your proposed expressions, as well as answers that satisfy none. Resolve ambiguous intent in the branch design and test the resulting behavior before relying on it.

Use the Boolean prompt for a two-way decision

When you insert a Boolean user input control, you are prompted to add a Decision utility immediately after that Boolean node. Selecting Yes in the prompt generates two branches named True and False. Their conditions are set automatically through the condition builder.

This gives a direct starting point when the user’s answer divides the conversation into two outcomes. Review both generated branches against the wording of the question. A positive answer to a negatively worded question can be easy for a reviewer to misunderstand even when the underlying Boolean route is configured correctly.

For instance, “Do you already have a device?” and “Do you need a device?” express different decisions. In a proposed conversation, decide which meaning you want before attaching follow-up steps. Record the expected next question for both answers so that the test checks the business meaning as well as the branch label.

Review automatically generated conditions before making later changes around the Boolean node. Automatic setup reduces initial configuration work, but the conversation still needs an editorial check: the question, branch meaning, and follow-up should remain aligned after topic changes.

Save the topic and test the routes

When the topic changes are complete, select Save in the topic header bar. Then use a deliberate set of conversation tests. Begin with one ordinary input for each branch, and compare the observed next step with the expected outcome you wrote before editing.

For a Boolean decision, exercise both True and False outcomes. For a decision with several conditions, choose inputs that distinguish neighboring branches. Testing two similar answers that should take different routes is often more revealing than repeatedly testing a single successful conversation.

Include incomplete or unexpected input in your review where the topic allows it. Record what happened instead of presuming that an unhandled answer will reach a particular fallback. The goal is to find gaps in your own expressions and follow-up design before a user encounters them.

Use the Virtual Agent testing and acceptance checklist to organize wider acceptance work. Keep the decision’s expected outcomes explicit within that review so that a general topic pass does not hide a wrong turn.

When a route differs from expectations, compare the supplied input, selected branch properties, and resulting next step. The guide to debugging Virtual Agent conversations covers the adjacent investigation work. For help planning this work, see ServiceNow implementation.

Before handing the topic back, walk through one complete conversation for each intended outcome. Start before the input question and continue beyond the branch, so the review includes the context in which the choice is made. Note any follow-up that assumes an answer different from the one supplied. Correct that mismatch and repeat the affected scenario; a branch reaching the expected node is insufficient if the next exchange no longer makes sense.

Questions about reviewing a branching design

How should I explain a branch change to a topic owner?

Describe the user answer that triggers the change and the follow-up the user will receive. Include a short before-and-after conversation example. This lets the owner assess whether the route serves the intended need without having to interpret the expression logic first.

What should a reviewer retain after acceptance?

Keep the scenario inputs, expected outcomes, observed outcomes, and any unresolved exceptions in the change record. These examples give a future editor a concrete basis for checking whether a revised question or condition has changed the conversation’s meaning.

Should a successful route be reviewed for wording?

Yes. Read the question before the decision together with the first response after it. Check that the transition acknowledges the answer naturally and does not ask the user to repeat information. Route correctness and conversational clarity are separate review concerns.

How can live conversations inform the next revision?

Look for examples where users appear confused by the question or the resulting follow-up. The conversation transcript review guide supports that work. Use observed examples to propose specific wording or routing changes, then add those scenarios to the next acceptance review.

Should a Virtual Agent budget count topic executions or Otto panel conversations, and why must a cost-per-chat figure keep those two meters separate?

Budget Virtual Agent topic executions and Otto panel conversations as separate lines, each in its own unit. A topic execution is one completed end-to-end run of a topic, and a panel conversation is one conversation with its own rate and end rule. A cost-per-chat figure must keep them apart, since a blended number matches neither meter.

Why the two meters carry different rates

As of November 2026, the September 10, 2025 Now Assist overview is the latest document checked for these rows, and it lists one end-to-end Virtual Agent topic execution at 10 Assists and one panel conversation at 5 Assists. The fact-check record does not confirm these two rows against the current card, so treat those figures as the last published rates. The November 12, 2026 Otto Overview confirms a third meter: a small agentic workflow of one to four tool invocations at 25 Assists.

The two meters end on different rules

As of the September 2025 Now Assist overview, a panel conversation ends at the earlier of one hour of inactivity or a change in intent, including the start of a new task. A topic execution counts only when it completes, so a run that stops partway adds nothing to the topic line. Task switching can move the panel count without touching the topic count.

How to build the two budget lines

  1. Forecast completed topic executions per month for each topic in scope, then multiply by the topic rate.
  2. Forecast panel conversations per month for the Otto panel use cases, then multiply by the panel conversation rate.
  3. Add a separate line for any agentic workflow, counted by its tool invocations.
  4. Add a testing allowance as its own line, since AI Agent Studio testing and sub-production use consume Assists.

What a blended cost per chat hides

Take a hypothetical month with 1,000 completed topic executions and 1,000 panel conversations. At 10 and 5 Assists, that is 15,000 Assists. Divide by 2,000 chats for 7.5 Assists per chat, a figure that describes no real chat and no real meter. If the mix shifts toward panel conversations, the blended figure falls even though no rate has changed. These volumes are arithmetic for illustration, not a benchmark.

What to confirm before you set the budget

  • The current Assist rate for each meter, with the date of the rate document.
  • Whether a topic used directly as a tool inside an agentic workflow is charged on its own or counted within the workflow.
  • The end rule for panel conversations and agentic workflows.