To duplicate and publish Virtual Agent Lite topics, test a pre-built ITSM topic first, create a named copy, and review its Description, Keywords, and Roles. Save those properties, then publish the copy from the triple-dot menu. Check the published topic in the chat client using the intended end-user access.
Prepare a tested topic and a clear audience
Start with the pre-built topic that you intend to deploy. Previewing and testing it comes before duplication. Treat that test as a decision about whether the conversation fits the request you want users to complete. A recognizable topic name alone does not establish that its conversation meets your needs.
The role required for this duplicate-and-publish procedure is virtual_agent_admin or admin. These are the administrator permissions for the procedure. The Roles property on the duplicated topic serves a different purpose: it determines which end users can view and run that topic. Keep those two decisions separate when preparing the work.
Before opening the duplication menu, write down the source topic, the proposed copy name, and the intended audience. This is a recommended review record rather than an additional platform requirement. It helps the person reviewing the copy distinguish the original conversation from the version intended for deployment.
If the surrounding Lite configuration still needs attention, use the Virtual Agent Lite setup steps to address that work. Keep this procedure focused on taking a tested pre-built topic through duplication and publication.
Duplicate and publish Virtual Agent Lite topics in order
With the tested source topic open, use the triple-dot icon on the Virtual Agent Designer header bar and select Duplicate. Enter a name for the new topic in the pop-up window, then select Save. The resulting copy opens on the Topic Properties page, under the Properties tab.
Check the interface against your instance and release: the Zurich procedure places the duplication menu on the Assistant Designer Asset library header bar, while the other covered releases name Virtual Agent Designer. Find the tested source topic in the applicable interface before selecting the action.
- Check that the topic open for duplication is the pre-built source you tested.
- Select Duplicate from its header menu.
- Give the copy a name that your reviewers can distinguish from the source.
- Select Save and review the Properties tab on the new topic.
- Adjust Description, Keywords, and Roles for the intended deployment.
- Select Save again, then use the triple-dot icon and select Publish.
There are two separate save points in this sequence. The first saves the named duplicate and opens its properties. The second saves the property changes before publication. Do not use the presence of a named copy as your evidence that the topic has been deployed to users.
You can duplicate a pre-built topic, but you cannot duplicate a copy of a pre-built topic. Plan naming and review around that restriction. If you need another copy, return to the pre-built source as the starting point rather than planning a chain of copies derived from earlier duplicates.
Review the three properties before deployment
Description: explain the request the topic handles
The Description field holds a brief explanation of the topic. Use it to make the intended purpose clear to the people maintaining the conversation. A good review question is whether someone unfamiliar with the duplication work could identify the request this topic addresses from that explanation.
As a writing recommendation, describe the user need directly. Avoid filling the explanation with the history of who created the copy or why it was assigned a particular name. Keep any handoff history in your review record so the topic explanation stays focused on its purpose.
Keywords: choose phrases associated with activation
Keywords are words or phrases associated with the topic that activate it. You can add, change, or delete them on the copy. Review the inherited keywords against the request you intend to support instead of assuming the original set expresses your users’ language.
For example, a reviewer can list the phrases employees use for a request and compare them with the copy’s Keywords field. Treat that comparison as an input to testing. A familiar phrase on a review checklist is not, by itself, evidence that the deployed conversation behaves as intended.
Roles: decide who can view and run the topic
The Roles field specifies the roles an end user must have to view and run the topic. Review it as an audience decision. Administrative access to the designer does not tell you whether the intended end user will have access to the published conversation.
For a public topic, including one available to unauthenticated guest users, select only the Public role. That setting deserves an explicit audience review before publication. Do not use it as a shortcut for resolving uncertainty about an employee audience; first establish whether unauthenticated access is intended.
For help planning this work, see ServiceNow implementation.
Check the published result in the chat client
After saving the properties, select the triple-dot icon followed by Publish. Publication makes the topic active and available in chat clients. When users run Virtual Agent, their topic selection menu displays the published topics available to them.
Check that result from the perspective of the intended audience. A recommended acceptance check is to open the relevant chat client with a representative end-user account and look for the topic. Then run the conversation against the request you used when reviewing the pre-built source.
If three or fewer topics are available to the user, the topic choices appear as buttons. A button presentation therefore fits the described menu behavior; it does not imply that the topic failed to publish. Count the topics available to that user when interpreting what the client displays.
Record the copy name, the audience used for the check, and the observed result. These notes help distinguish a publication problem from an audience or conversation problem during handoff. They also give a later reviewer a concrete result to reproduce instead of a general statement that testing was completed.
Investigate a missing topic without making unrelated changes
If the expected topic does not appear, work backward through the deployment decisions. Check whether the copy was published after its property changes were saved. Next compare its Roles property with the intended end-user audience. Finally, verify that the conversation being checked is the named duplicate rather than the pre-built source.
If the topic appears but does not match the intended request, revisit the Description and Keywords review alongside the conversation test. Keep a specific example of the request that produced the unexpected result. That gives the next review a defined starting point and avoids changing several unrelated settings without knowing which problem they address.
Use the pre-built ITSM Virtual Agent topics page when the decision concerns choosing the source conversation. If the requirement concerns reusable conversation components, the separate discussion of topic blocks in Virtual Agent design addresses that design question.
Before closing the work, ask the reviewer to distinguish three outcomes: the copy exists, its properties reflect the intended audience and request, and the published conversation is available in the client. Record each outcome separately. This review structure keeps a completed editing task from being mistaken for a completed deployment when the user-facing check is still outstanding.
Questions for a topic publication handoff
What should a second reviewer receive?
Provide the source topic identity, copy name, intended audience, and the result of the chat-client check. Include any request wording that produced an unexpected conversation. This recommended handoff gives the reviewer something specific to inspect without requiring them to reconstruct your decisions.
Should we publish several copies as one review batch?
For review purposes, keep an acceptance record for each copy even if several are prepared together. Different descriptions, keywords, or audiences can require different checks. A successful result for one conversation should not stand in for reviewing the remaining copies.
How should we record an unresolved test result?
Record the request entered, the audience used, and the result observed. State what remains undecided, such as whether the request belongs in that conversation. This is more actionable than recording a broad failure label without the circumstances needed to investigate it.
Who should decide whether the conversation fits the business request?
As a governance recommendation, ask the person responsible for the service request to review the conversation outcome. The administrator can carry out the publication procedure, while the service reviewer can judge whether the resulting interaction answers the user need that motivated deployment.
What can the Virtual Agent Lite included with Standard actually do, and when is full Virtual Agent a separate entitlement?
Virtual Agent Lite, included with ITSM Standard, runs pre-built IT service conversations using keywords in the web chat client and in Slack, Microsoft Teams and other supported messaging integrations. It cannot build new topics or use natural language understanding. Full Virtual Agent is a separate entitlement, which the legacy Pro package adds.
What Lite can do
Lite runs keyword-triggered conversations from the pre-built ITSM set. It is not a flow builder. Within that scope it does the following:
- Runs the pre-built ITSM self-service conversations once the ITSM Virtual Agent Conversation Topics Lite package is installed.
- Starts a conversation when a user’s message matches a topic keyword.
- Delivers conversations in the web chat client and in Slack, Microsoft Teams, Workplace by Facebook and Facebook Messenger.
- Controls visibility with two switches: discovery for chats, and listing in the All Topics menu.
What Lite cannot do
Lite supports topics in the ITSM self-service category, related topic blocks and platform setup topics. Outside that scope, it does not do the following:
- Create new topics, topic blocks or custom controls.
- Set conditions that decide how or when a topic runs.
- Pass Live Agent chat variables into a conversation.
- Use NLU models or NLU-enabled topics, including topic switching and multi-language NLU.
- Add translations, since translated content is read-only.
- Run in custom chat channels.
- Send actionable notifications, or use the Virtual Agent Analytics Dashboard.
When full Virtual Agent is a separate entitlement
Full Virtual Agent is a separate entitlement. In the legacy structure, Standard carries Lite only, and full Virtual Agent sits in the Pro package, as the November 2025 package presentation lists it. A working Lite topic shows that the Lite topics package is installed and published. It does not by itself establish that you hold the full entitlement.
Full Virtual Agent is also metered in that structure. The fulfiller model in the entitlement schedule effective 20 September 2024 includes 1,000 conversation transactions per fulfiller per month. Other user models differ, so use the figure on your order form.
The route from Lite to full Virtual Agent runs through the ServiceNow account team. A request that needs a custom topic, NLU or a custom channel is a full Virtual Agent question, not a configuration question.
What to check before relying on Lite
- Check the Virtual Agent line on your order form and confirm whether it says Lite or full.
- Sort your request list into pre-built, keyword-achievable, and custom or NLU. Only the last group needs full Virtual Agent.
- Confirm your chat channels. A channel outside the supported integrations is a blocker.
- If the contract is metered, compare expected monthly conversations with the allowance before launch.