Create Process Mining Projects for KPI Groups in Digital Portfolio Management

Create Process Mining projects from a KPI group in Digital Portfolio Management by opening the group and selecting Initiate Process Mining. With Process Mining enabled and the required analyst role assigned, the system creates projects for the group’s KPI tables in the background. Then check mining and inspect KPI records through Process analysis.

Prepare process mining for KPI groups in Digital Portfolio Management

Start with the KPI group whose performance you need to investigate. The purpose is to connect a performance question to the underlying records and their process variations. Before starting mining, write down which group you are reviewing, which KPI prompted the investigation, and which assignment groups belong in the analysis. This gives the person reviewing the results a defined scope.

The KPI assignment group manager needs the Process Mining analyst role, sn_process_optimization_analyst, to create Process Mining projects for their KPI groups. Check that role for the person performing the creation action. Holding a management responsibility is not a substitute for checking the required role on the account that will initiate mining.

Process Mining must be enabled, and the system property sn_dpm.enable.po.dpm must be enabled for this integration. Check these prerequisites before investigating why a project has not appeared. Keep the access check and the integration check separate: the user’s role and the instance’s configuration answer different questions.

Check the controls and integration configuration on your instance and release before following the sequence. For the wider reporting context, see Process Mining dashboards, insights, and KPI configuration. Use that context to decide what you want to examine after creation, while keeping this task focused on the selected DPM KPI group.

Match the KPI tables to project templates

The base DPM system includes templates for Incident, Problems, Changes, and Requests. Review the tables represented in your KPI group before initiating mining. That review helps you distinguish a group that uses the supplied templates from a group that needs administrator preparation for different data.

For other templates, an administrator must create them on the tables that correspond to the records you want to analyze. Make the table requirement explicit when handing this work to the administrator. A request for insights into a different record type should identify that record type rather than assume an existing template covers it.

For a formula indicator, you can select an indicator source used in the formula for Process Mining. Choose the source that corresponds to the question you want the analysis to answer. As a review practice, record that choice with the KPI group so another analyst can understand which underlying source was selected.

Keep portfolio setup questions separate from template selection. If you also need to review the surrounding product structure, use digital product management setup. Resolve those broader decisions without losing track of the KPI tables that this mining action will use.

Initiate mining from the selected KPI group

  1. Navigate to All > Digital Portfolio Management > KPI Groups.
  2. Open the KPI group you intend to investigate.
  3. Review the selected group against your planned analysis scope.
  4. Select Initiate Process Mining.
  5. Allow for background project creation, then inspect the resulting projects.

The creation boundary matters: a project is created for each KPI table in the KPI group. Do not plan the review around an assumption that one group produces one project. When several tables are represented, organize your checks by table so that one visible project does not become your evidence that the entire group is ready.

Background creation also means the initiation action and the later inspection are separate stages. Record which group you initiated before moving to the project list. If the result is unclear, investigate that group and its corresponding tables before repeating the action. This keeps the review traceable without assuming an undocumented completion time.

A concise handoff can identify the KPI group, relevant tables, chosen formula source if applicable, and the person responsible for checking the results. Those are review notes, not additional required fields. Their purpose is to keep the analysis understandable when creation and inspection are performed at different times.

Open DPM Projects and check the mining

Navigate to All > Digital Portfolio Management > DPM Projects to locate the project. Open it and select Generate model (Full) to check the mining state. Treat finding the project and checking its mining as two checkpoints: a project record gives you something to inspect, while the mining check addresses the analysis behind it.

Use the KPI table list from preparation to organize this inspection. For each table you expected to analyze, identify the corresponding project and note what you checked. If an expected result is missing, return to the prerequisites, table coverage, and selected group before drawing a conclusion about KPI performance.

Additional data is handled through a scheduled job that remines projects. This supports updated insights as more data is added. Do not infer a particular run frequency or completion window from that behavior. For an operational review, distinguish the data you expected to be included from the mining result you actually inspected.

When the investigation requires broader coordination, clarify ownership before changing configuration. For help planning this work, see ServiceNow implementation.

Maintain scope when assignment groups change

Assignment group membership affects the project filter condition. Adding an assignment group updates that condition to include the group; removing an assignment group removes it from the condition. A change in membership therefore deserves a scope review before someone compares the next analysis with an earlier result.

To add a group, open the selected KPI group and use Edit in the Assignment Group related list. Add the desired assignment group. A process is automatically created for the assignment group. If you add assignment groups after process mining has already been performed, remine the KPI group as part of reviewing the expanded scope.

For example, suppose an investigation began with one assignment group and a second group is later added. Record the membership change alongside the review notes. The next reviewer can then distinguish a change in the analyzed population from a change in how the work moved through the process. This is an interpretation check, not a claim that membership alone explains a performance difference.

For wider work planning alongside this investigation, see using task dependencies in project management. Keep those planning relationships distinct from the assignment group filter that defines the mining scope.

Inspect selected KPI records in DPM Workspace

  1. Open the DPM Workspace.
  2. Select the enterprise portfolios icon and open an enterprise portfolio.
  3. Select View Details.
  4. Select an incident KPI single score.
  5. On the KPI drill down page, select Process analysis.

The Process analysis tab presents insights and variations for the selected KPI records. Its default data window covers the last 30 days. Before discussing a result, note the selected KPI and the records under review so that colleagues understand what the analysis represents.

Separate observation from explanation in the review. Describe the variation you see, identify the records you examined, and then frame the follow-up question. A process variation is a starting point for investigation; the responsible team still needs to examine the work before deciding which operational change to make.

Close the review with a defined next step: which records need closer examination, who will examine them, and what question they should answer. This turns the selected KPI analysis into a bounded investigation that another team member can continue without reconstructing your intent.

Questions to resolve when handing over KPI mining

How can retired projects be kept out of user filtering?

Set the project definition status to Retired when you do not want users to filter on retired projects. Include that status check when handing over an analysis whose older projects should no longer be selected.

Should an informational message appear whenever a group is added?

The informational message on adding an assignment group is displayed when the KPI group has already been mined. Do not use the presence or absence of that message as a substitute for reviewing the group and its mining history.

What should a reviewer ask before comparing two analysts’ findings?

Ask each analyst to identify their KPI selection, analysis scope, and observation. Agreement about those inputs makes the comparison meaningful. If the inputs differ, reconcile the investigation questions before treating the findings as contradictory.

What belongs in a decision note after reviewing a variation?

Record the question investigated, the observation, the proposed next action, and who will evaluate it. Keep a hypothesis labeled as a hypothesis until the team has examined the relevant work. This keeps a mining review connected to an accountable decision.