To schedule a Process Mining job, open All > Process Mining > Scheduled Jobs > Create New, complete the job form, and add projects through Project Definitions. Save the membership selection. The job follows its configured frequency, and projects grouped in that job are mined sequentially in their listed order.
Plan the job around project order and review needs
A scheduled job can contain several projects, but each project can have only one scheduled job. Decide which projects belong together before creating the record. A shared schedule makes sense when the same review cycle can accommodate the projects and their sequence. Treat that grouping as an operational decision: adding another project changes the work that the job must complete.
Projects within a job do not begin mining together. If the list contains Project A followed by Project B, mining of B starts after A finishes. The schedule therefore sets a starting point for the job; it does not establish a simultaneous start for its members. Someone waiting for the second project’s results must allow for the first project’s mining time.
Before configuration, write down the intended members, their listed sequence, the desired recurrence, and who will review the resulting projects. These are planning recommendations, rather than additional required form fields. They help distinguish a scheduling problem from a mismatch between the planned review time and the order of work.
Keep the purpose of each member clear. If your next decision concerns how results will be examined, use the related guidance on Process Mining dashboards, insights, and KPI configuration to plan that review alongside the schedule.
Check the role for the scheduling action
In Brazil and Australia, creating a scheduled Process Mining job requires sn_process_mining_power_user or sn_process_mining_admin. In Zurich, Yokohama, and Xanadu, the scheduling action requires sn_process_optimization_power_user or sn_process_optimization_admin. Check the role requirement against your instance and release before starting.
Use that distinction when handing the task to an administrator. Give the person responsible for scheduling the specific action and applicable role names, rather than asking for broad access to Process Mining. A project review assignment and a scheduling assignment are different responsibilities; the scheduling role requirement belongs to the job creation procedure described here.
Also check your proposed membership against existing schedules. Because a project can have one scheduled job, an existing association matters before you plan another job around it. Record the intended arrangement before making changes, especially when several people maintain mining schedules. This reduces the chance of two administrators planning different recurrences for the same project.
Create the scheduled Process Mining job
- Navigate to All > Process Mining > Scheduled Jobs > Create New.
- Complete the applicable fields on the Scheduled Process Mining Job form for the job you intend to run.
- Review the frequency you have configured against the review cycle agreed with the project owners.
- Select Submit to create the scheduled job record.
- Continue with project membership in the Project Definitions section.
Keep the job’s configuration and the choice of members as two deliberate checks. Completing the first form does not replace selecting the projects that the job should mine. During handover, distinguish a record that has been created from one whose intended project membership has also been saved.
Choose a recurrence that you can assess after an initial run. As a planning measure, leave enough time between the job’s expected start and the team’s review meeting to inspect its output. Do not promise a completion time from the configured frequency alone: the projects grouped in the job still need to finish their sequential mining work.
For help planning this work, see ServiceNow implementation.
Add projects and verify the saved membership
In Project Definitions, select Edit. The Edit Members form presents Collection and Project Definitions List columns. Select the projects you intend to mine from Collection and move them into Project Definitions List. Select Save when the membership matches your plan.
Review the resulting project list before considering the setup complete. Check the identity of each project, whether a planned member is missing, and whether an unintended project was included. Compare the listed order with the sequence the reviewers expect. The meaningful check is the saved membership, rather than a recollection of which items were selected while editing.
For example, suppose a team wants to review two projects after a recurring mining job. It should record which project is listed first and which follows it. If the second project has no new output when the team first looks, establish whether the first has finished before treating the second as a scheduling failure.
If a planned member concerns an external system, keep the source preparation work visible in the handover. The related page on Process Mining with external Workday and Salesforce data addresses that neighboring concern. Selecting a project for a schedule is a separate decision from preparing the information that project will analyze.
Check execution and inspect the generated project
The scheduled job runs at the configured frequency. To locate scheduled Process Mining jobs, navigate to All > Process Mining > Scheduled Jobs > All Jobs. Use this view to find the record you created and check that the job you are discussing is the same one the project owners expect.
After a project has been generated successfully, view it from Analyst workbench. Make that result review part of the handover: a saved schedule establishes intended execution, while the generated project gives the reviewer something to inspect. Avoid treating those two checkpoints as interchangeable evidence.
A concise review record can include the scheduled job, expected project members, listed sequence, and which generated projects were inspected. This is a suggested operating record, not a required ServiceNow field set. It makes follow-up easier when the scheduling administrator and the person interpreting the mining results are different people.
Once the mining output is available, the next discussion may concern what to improve. The page on Process Mining improvement opportunities covers that next stage. Keep the initial scheduling check focused on whether the intended projects were included and their generated output can be reviewed.
Investigate delays without changing several settings at once
Start an investigation by comparing the intended job with its saved membership and configured recurrence. An incorrect assumption about either can make expected behavior look like a failure. Establish which project the reviewer is waiting for, where it sits in the list, and whether the preceding mining work has completed.
If the issue concerns a later member, account for the sequence before changing the frequency. Increasing recurrence does not itself establish why an earlier project is taking time. Keep a short record of the observation that prompted a change so that the next review can evaluate whether the change addressed the original issue.
If the wrong project appears in the list, separate that membership issue from result interpretation. Resolve the intended membership with its owner before drawing conclusions from output associated with another project. If a project is already tied to a scheduled job, investigate that existing arrangement before planning another association.
As an operating practice, change one aspect of the plan at a time where possible. Recheck the saved record after an adjustment and assign someone to review the next relevant output. This gives the team a clearer basis for comparing its expectations with what actually happened.
Questions for scheduling handover and ownership
What should a handover note contain?
Include the reason for the chosen recurrence, the person who requested it, and the business review it supports. Those details explain why the configuration exists and help a successor judge whether it still meets the team’s needs.
Who should decide whether projects belong in the same job?
Ask the people responsible for the projects’ review cycles to agree on the grouping. The scheduling administrator can then implement a shared decision instead of inferring business priorities from project names.
How can a team evaluate a proposed schedule before relying on it?
Plan an initial observation period and name the reviewer in advance. Compare the availability of the required output with the intended decision time, then use that observation to discuss whether the planned recurrence suits the workflow.
When should a scheduling decision be reconsidered?
Revisit the plan when a review meeting moves, a project’s ownership changes, or the required analysis changes. Treat these as prompts for review rather than automatic instructions to alter a job that may support other people.
How should scheduling feedback be reported?
Describe the expected decision time, the output needed, and the observation that prevented the review. A concrete report gives the administrator a testable question and avoids an ambiguous request to make the schedule faster.
What must a buyer have in place before a Process Mining evaluation or license can show a real bottleneck?
A Process Mining evaluation or license shows a real bottleneck when three conditions hold: the instance keeps usable audit history for the process under review, the buyer has a measurable delay to test for, and a named process owner can change the steps the data exposes. Missing any one leaves a map without a decision attached.
Audit history must cover the steps you intend to examine
The first check is whether audit data exists for the tables, fields and transitions the process touches, because the map can only show what the platform recorded. As of November 2026, keep audit and log data when you clone an evaluation instance. A clone that drops that history can produce a map that looks finished but covers only part of the real activity. Ask the administrator which tables are audited, how far back the records reach, and whether an archiving or cleanup job has removed records inside the period you plan to study.
Pick one process and one delay to test
In practice, the handoffs that hold up are the ones where a record sits in one state until a person, a queue or an approver moves it. Pick one such handoff and define the delay as the elapsed time between two named states. Write down the figure you expect the data to confirm. Trying to map a whole value stream at once usually turns the review into a debate about which step matters; one measured wait gives a clear yes or no.
Test the delay with a sample evaluation first
As of November 2026, Process Mining supports a sample evaluation without full mining rights, and full mining requires a license. Use the sample to answer one question: does the map built from your own history show the delay you wrote down? Agree on a bounded scope, an end date and written usage limits before the evaluation starts. If the sample cannot reproduce a delay you can see in the operational records, a full license is unlikely to make it appear.
Name the process owner and confirm they can change the step
A confirmed delay produces the projected saving only when someone can change the step that causes it. Before the evaluation starts, name the owner who will sign off on a remedy and confirm they control the approval or handoff involved. Ask that owner which change they would commit to if the wait is confirmed, and how they would measure it.
Ask for these items in writing before you commit
Confirm the following with the vendor before signing anything:
- Audit history is retained for every in-scope table, and its start date reaches back past the delay period.
- The evaluation scope, end date and usage limits are written down.
- Process Mining is sample only or full, and which entitlement covers it.
- Which package or add-on covers Process Mining.