Data 360 can share selected objects between orgs, and the receiving org sees them as if they were defined locally. Nothing is copied when the share is set up. Tags and policies do not travel with the objects, so the receiving org must reapply its own governance, operational and AI tags.
What a data share passes between Data 360 orgs
A data share is a grouping of specific objects that an admin chooses to make available from one Data 360 org to another. Only access is shared. The receiving org gets access to the selected objects, and those objects appear as though they were defined in that org.
The underlying data stays in the source Data 360 org. The target org reads through the share, so it does not need its own copy of the source records to work with a shared object. Before you pick this pattern, review your Salesforce integration architecture so the share fits the data flows already in place.
Start the inventory with the objects the receiving team actually needs. Note whether any of them depend on other objects that would also need to be shared, and test that dependency on your own instance rather than assuming it.
Why each object needs a deliberate share
Sharing does not happen automatically. Each object the receiving team needs must be added to a data share on purpose. An object that exists in the source org is not visible in the receiving org until someone includes it.
When a segment or insight appears to be missing in the receiving org, check the share’s object list first. A missing object is often a scope problem rather than a data problem, so checking scope before you investigate downstream logic saves time.
What does not carry over: tags, governance and policies
Tags are the item that usually surprises a receiving team. Tags are not shared. When a data share is created, no tags or policies flow to the target org, so the receiving team has to reapply the governance, operational and AI tags its own rules require. A shared object arrives without the classifications the source team applied.
This changes two decisions. First, the receiving org should not assume a shared object is already classified for its own governance rules. Second, any report, filter or segment rule that depends on a tag needs that tag in the receiving org before the results are trusted. A filter that returns an empty set can look like a data problem when the real cause is an unapplied tag.
Plan for three tag groups: governance, operational and AI. Each group needs its own owner and its own list, even when one person manages all three. If the source org’s tags were not cleaned up, that backlog moves into the receiving org with the work. A clean tag list is easier to reapply than a long, inconsistent one, so the Salesforce data quality and migration work is a sensible place to start.
How companion orgs receive metadata from a home org
The companion model is a separate arrangement from a data share between two Data 360 orgs. A home org sends metadata definitions to companion orgs, including data model objects, the unified profile schema, calculated insights and segments. Those definitions appear natively in the companion org as if they were local assets, although they remain linked to the home org.
Data is shared selectively. Specific data spaces are shared from the home org, so a companion org sees a slice of the home org, not the whole of it. Teams planning the feed side of this model should review Salesforce data migration and integration before choosing which data spaces to share.
Data 360 administration, governance policies, tagging and masking are applied centrally from the home org. Whether tags carry into a companion org is not something to assume. Confirm it on your own instance and release before you plan any tagging work there.
What the receiving team can and cannot build
A companion org cannot ingest or unify data. Ingestion, modeling and unification stay with the home org, and all ingestion configuration, including connectors, batch and streaming, is set up there. The companion team’s build work therefore sits on top of the shared objects.
Keep source-side modeling in the home org. If a requirement needs a new source feed, add it to the home org’s plan at the start. Teams that skip this step often find the gap late, when a dependent insight has nothing to read from. For the setup side of the companion org, see Salesforce configuration and customization.
Choosing between a data share and a companion setup
A data share fits when two Data 360 orgs need access to a defined set of objects and each is run by its own administrators. A companion setup fits when one home org should govern the data and several companion orgs need the same metadata and a selected slice of data.
A useful test is to ask who must change the upstream data path. If one team is willing to own it centrally, the companion model fits. If each org needs its own control over ingestion, a data share between separate orgs usually fits better. Record the decision and the reason in your project notes, because the choice determines who reapplies tags and who approves later changes.
Preparing the tag reapplication work before you share
Start with an inventory on the source side. List each object you plan to share, then list the tags attached to it, grouped by governance, operational and AI type. Record who made each tag decision in the source org, because the receiving org has to make its own decisions rather than inherit them. For help planning this work, see Salesforce implementation.
Next, decide what the receiving org needs. Not all source tags are useful in the target. A reporting team in one org may need a much smaller label set than the team that built the source tags. Write the target tag list before the share is created, so the reapplication work has a defined finish line rather than an open-ended cleanup.
Then set the order of work. Create the data share, confirm the objects appear in the receiving org, and then reapply tags. Reversing that order makes it harder to tell whether a missing result comes from an object that was not shared or from a tag that was not applied.
Assign a named owner in the receiving org for each tag group. A tag list with no owner tends to drift, and the drift often goes unnoticed until a report looks wrong. Put the owner and a review date in your project notes so the tag set is reviewed on a schedule, not just at go-live.
Checks to run after the first share
Run a short verification after the first share is live, before moving the rest of the objects across. Confirm that each object in the share is visible in the receiving org and appears as a locally usable asset. If one is missing, check the share’s object list before you debug downstream logic.
Next, check tags on a sample of shared objects. Open each sampled object in the receiving org and confirm the planned tags are present. Any object without its expected tags goes back onto the reapplication list. This check catches the case where a team assumed the tags came across with the share.
Then review billing attribution. For a data share, consumption is billed to the source org, so agree the reporting view with finance before the share goes wider. In a companion setup, credits bill against the home org’s allocation, and Digital Wallet lets you drill down to the credits each org used.
Finally, compare a small set of segment and insight results between the source and the receiving org. Differences often come from share scope or filter conditions rather than the data itself, so compare the object list and filters before comparing counts. Record the result with its date and release.
Questions about sequencing, removal and refresh behavior
Can a tag be added to a shared object without sharing it again?
This page recommends sharing first, confirming visibility and then reapplying tags. Whether a tag can be added to an already shared object without a new share is a question to test on your own instance before you rely on it in a reporting plan.
What happens when an object is removed from a share?
What the receiving org sees when an object leaves a share, or when the share is revoked, is not something to assume. Test removal on a non-production pair of orgs before building reports that depend on a shared object staying in place.
Do shared segments refresh in the receiving org on the same schedule as the source?
Refresh timing for shared calculated insights and segments is unconfirmed. Measure the lag yourself by comparing a known record’s result in both orgs at two points in time, and set reporting expectations for the receiving team from that measurement.
Which release should the reapplication test run on?
Run the test on the release your organization actually uses, not on one seen in a demo. Behavior can differ between releases, so write the release identifier next to each test result. A result without a release attached is hard to reuse after an upgrade.