An access review evidence pack is a dated record of who reviewed each Salesforce user’s access, what the reviewer decided, and what change followed. Keep one row per reviewed user with the reviewer, the decision, the reason and the change made, plus the source data the reviewer saw. That lets you replay the review when an auditor asks.
Defining what each reviewed user record must contain
The pack is a set of records, not a summary slide. A stranger should be able to follow each row without asking the person who wrote it. For each reviewed user, the row needs the user’s identifier as it appears in the export, the access that was reviewed, the reviewer’s name, the date of the decision and the decision itself.
The access field deserves the closest attention. List the profile, the permission sets, the roles and any group membership the user held on the snapshot date, copied from the export rather than typed from memory. If a reviewer decides on a summary such as “standard sales access”, the row cannot be replayed, because that phrase means different things to different people.
Keep the raw export as well. A decision means little if you cannot show what the reviewer saw on that day. Store the extract under a file name that carries the run date, and record its row count and a checksum. That combination lets you show later that the file was not edited after the review started.
Setting the review scope and snapshot before reviewers start
Write the population down first. State which orgs are in scope, which user types are included, whether inactive users appear, how integration and API accounts are handled, and whether external or community users are covered. Scope gaps are a frequent reason reviews look incomplete.
Freeze the population at a single snapshot date. Reviewers working from a live view will see access change while they work, and the record will stop matching what they approved. Export once, give all reviewers the same file, and note the export time in the scope note. Clean up duplicate identifiers before that export. A duplicate review routine for data stewards is one way to find them first.
Name the reviewer for each group of users. If a manager reviews their own team, say so in writing, and decide in advance how to handle users whose manager is also under review. An auditor will ask who checked whose access, and the scope note is where that question gets answered.
Use this sequence to set scope:
- Write the population definition, with each inclusion and exclusion and the reason for it.
- Export the population once on the snapshot date and record the row count.
- Assign a reviewer to each group and record the assignment in the scope note.
- Agree the review window, meaning the period the decisions cover, and the date the reviews close.
If the population is too large for a line-by-line review, sampling can work. A method written down before reviewers start is far easier to defend than one chosen afterwards. Record the selection method and the list of unsampled users in the scope note. For help planning this work, see Salesforce implementation.
Recording each decision with a fixed vocabulary and a specific reason
Decisions need a fixed set of values, or the log turns into free text that cannot be counted or checked. Four values cover the usual cases:
- Keep: the access shown matches the user’s current role and no change is needed.
- Reduce: the access is wider than the role needs, and a narrower set has been agreed.
- Remove: the access has no current business need.
- Follow up: the reviewer cannot decide without information from the user’s manager or the owner of the system.
The reason should explain the decision, not repeat it. “Left as is” is a decision. A reason such as “moved to the renewals team last quarter, and the access still matches the previous role” gives the next reader something to test. Ask reviewers to write a reason on each row that is not a plain keep, and a short line on keeps too.
Require each reviewer to sign with their own identity. Shared logins and group sign-offs break the chain of custody, because nobody can say which person made which call. Where a reviewer holds access under review themselves, the row needs a second reviewer, and the log should show both names.
Do not let a reviewer change a decision to match the live record. If the reviewer disagrees with what the export shows, the correct entry is a follow-up with a note describing the mismatch. Silent corrections are a common way a review ends up appearing to approve access nobody actually checked.
Logging the change that followed each decision
A decision is not finished until the resulting change is recorded. For each row marked reduce or remove, note the change request reference, the person who made the change and the date it took effect. Then compare the access shown in a fresh export with the decision on the row. The gap between a decision and the live state is a common starting point for audit findings.
Keep the change log separate from the review log, and link the two by user identifier and review run ID. Mixing them makes it hard to tell whether a change came from this review or from a routine request.
Check the change log with three tests:
- Each reduce or remove row has a change reference.
- The change date falls after the decision date.
- A re-export taken after the change shows the decided state.
If a change cannot be made within the window, record it as a follow-up with a new owner and a due date. Do not mark the original row complete.
Keeping the pack replayable after the review closes
A replayable pack lets a second person rebuild the review from stored inputs and reach the same rows. Put the scope note, the frozen extract, the decision log, the change log and the sign-off into one folder per review run. Do not overwrite a previous run. If the review repeats, create a new run folder and link it to the earlier one so the history reads in order.
Store the guidance reviewers used too, such as the access baseline or role definitions. If that baseline changed during the review window, record the version in force on the snapshot date. Otherwise a later reader cannot tell whether a keep decision matched policy or matched a baseline that had since been loosened.
Configuration changes made between review runs can alter what an export shows. Note the configuration state on the snapshot date in the scope note. Before you reuse an old export as the basis for a new review, compare its field names and values with a current sample, and check this on your own instance rather than assuming the earlier layout still applies. Reviewing admin release notes before each sandbox test is one way to catch these changes early.
Checks to complete before the pack is signed off
Run these checks in order before the sign-off is completed. Each one catches a problem auditors tend to find first.
- Count the rows in the decision log and match the count to the row count recorded in the extract.
- Confirm no row has a blank decision or a blank reviewer.
- Confirm each follow-up row has an owner and a due date, and list any follow-up still open.
- Check that no reviewer decided on their own access, and that second-reviewer rows exist where needed.
- Read a sample of reasons and confirm that someone outside the review could act on each one.
- Match the change log to the decision log for each reduce and remove row.
- Record a checksum for the final file set in the sign-off note.
Sponsors who read review status on a fixed cadence, the way they would in an executive sponsor pipeline and forecast review in Salesforce, can spot open follow-ups before the deadline. The person who signs off should be accountable for the outcome, which may differ from the person who did the spreadsheet work.
Questions about building and storing the review evidence
How much detail does a keep decision need?
A keep decision still needs the reviewer’s name, the decision date and the snapshot it refers to. The reason can be brief, such as a line stating that the current role matches the access shown. Save longer reasoning for rows that change access or leave a follow-up open.
Should integration and service accounts go through the same review?
They should be reviewed, but the reviewer is usually the owner of the system or the process the account supports, not the manager of a person. Record the process the account supports, the named credential owner and the last date someone checked that it was still needed. Reviewers who look at human users alone tend to miss these rows.
How should users who leave during the review window be handled?
Keep them in the population and mark each one with the departure date as it appears in the extract. Record whether access was removed and on what date. A user who left before the snapshot is a different case from one who left after it, so the scope note should say which rule applies.
Can a spreadsheet serve as the evidence pack?
A spreadsheet can hold the decision log if it sits in a versioned folder, keeps a clear edit history and carries a checksum at sign-off. The main risk is copies. Keep one master file for each run and share a copy of it with the sign-off reviewer.
How long should the review folder be kept?
The retention period depends on the rules your organization or regulator applies, so confirm it with whoever owns compliance before setting any deletion date. Whatever period applies, keep the files readable for that whole period, and open a sample each year to confirm they still open.