OBLYTECH Logo
OBLYTECH Logo

Source-to-Target Field Mapping Sign-Off

A source-to-target field mapping sign-off is a written record of each source field, its target field, the transformation rule between them, and the business owner who accepted that mapping. Teams usually sign it before any load runs, so testing has one approved reference and owners can challenge a rule while changing it is still cheap.

What a mapping sign-off record contains

The record is a table with one row per mapped field. Each row names the source system and object, the source field and its data type, the target object and field, and the transformation rule. Add columns for the reviewer, the business owner who accepted the row, the acceptance date and the version of the mapping the row belongs to.

Fields with no transformation still belong on the record. A straight copy is a decision, and the owner should accept it in the same way as a rule. Leaving a field off the sheet is a common reason a target field arrives empty after cutover, because nobody was asked whether it should be filled.

Keep the record in one place that both the migration team and the business owners can read. A spreadsheet suits a small program. A larger program usually needs a controlled document with version history, since the sign-off has to show what the owner saw on the day they accepted it.

Building the mapping rows before review

Start from the target design rather than the source extract. Walk each target field and identify the source field that feeds it, or record that no source exists and the value will be set by a rule. Working from the target side surfaces two kinds of gap: target fields with no source, and source fields that feed nothing. Both need a decision before the review session.

Group the rows by target object so each owner reviews one business area at a time. For each source field, pull real sample values from the extract. Field names mislead. A field called Region may hold country codes in one system and free text in another, and a rule written for one will fail on the other. Record two or three sample values per row so the reviewer sees what the rule will receive.

Teams new to this kind of review can start from the Salesforce services overview.

Mapping row checklist

  • Source system, object and field name, exactly as the extract shows them
  • Source data type and two or three observed sample values
  • Target object, field and data type
  • Transformation rule, or the words “direct copy” when no rule applies
  • Default value for blank or invalid source data
  • Open question, when the rule depends on a decision not yet made

Writing transformation rules a reviewer can test

A transformation rule helps a reviewer when they can apply it to a sample and predict the output. “Standardize phone numbers” cannot be tested. “Remove spaces, dashes and brackets, then add the country code from the billing country field when the result has ten digits” can. Write each rule with its input, its logic and its expected output, one line each.

Show one normal value, one edge value and one invalid value for each rule. Where a rule maps codes to labels, attach the full code list to the record. A summary sentence leaves open what happens to a code that was not on the list, and the reviewer will otherwise guess.

Name the owner of any rule that depends on a business definition. A rule that decides which accounts count as active depends on a definition the business owns, not one the migration team can settle. Record that definition as its own decision with its own sign-off line, and link the rule to it.

Rule types to document separately

  1. Direct copy, with the source and target data types confirmed as compatible
  2. Code or lookup mapping, with the full list of codes and labels attached
  3. Derived value, built from two or more source fields, with the order of operations stated
  4. Default fill, with the condition that triggers it written out
  5. Exclusion, where a record is left out of the load, with the reason recorded

Assigning business owners and the acceptance step

The owner who signs is the person who can answer for what a target field means to the business. For opportunity fields that is often a sales operations lead. For revenue fields it is often a finance controller. The migration lead can sign as the technical reviewer, but the record needs a separate business line for the owner. If one group of owners reviews several programs, keep their decisions in one record so they stay consistent. Teams planning that staffing can also look at the dedicated Salesforce delivery teams page.

Set the scope of each acceptance in writing. An owner who accepts the mapping for their object has accepted the rules on that object. They have not accepted the load timing, the volume checks or the access settings on the target. Those belong to other sign-offs. State that boundary in the header of the record so no one reads a signature as wider than it is.

Agree a response window for review comments before the session starts. A long sheet with no deadline invites approval without reading. Hold the session with the record on screen and the sample output beside it. Read each rule aloud with one example, and ask the owner to name the value they expect for that example.

When the expected value differs from the sample output, stop on that row. The gap is usually a definition, such as what counts as an open account, and the decision belongs on the record as its own line before anything is signed. Write the accepted rule, any rejected rule and each open question into the record during the session, with the time and the people present. A sign-off recorded from memory afterward is hard to defend if a value is questioned later.

For help planning this work, see Salesforce implementation.

Checks to run before the sign-off is recorded

Run the rules against a sample extract before the owner sees the record. Include the awkward records: blanks, duplicates, values outside the code list and the longest text values. Compare the output with the expected values on the sheet. A mismatch means either the rule or the expected value is wrong. The record should show which one, and should not hide the difference behind a quiet fix.

Check coverage in both directions. Each required target field should have a row with a source or a rule. Each source field in scope should feed a target field or carry a documented reason for being dropped. A coverage check on paper catches gaps that a sample run will miss.

Review the target fields that hold personal or financial data before sign-off. The mapping defines the values but not who can see them, so the reviewer should flag those fields on the record for an access review. For the access side, the field-level security review checks page is the place to start.

Pre-sign-off check list

  • Sample run output matches the expected value for each rule
  • Each required target field has a source field or a rule
  • Each in-scope source field maps to a target field or has a documented reason for being dropped
  • Personal and financial fields are flagged for an access review
  • Code lists are complete and include handling for unexpected codes

Handling changes after the sign-off

A signed mapping will change. Source teams rename fields, owners revise definitions, and a sample run sometimes shows a rule that fails on real data. Treat each change as a new version of the record. Keep the earlier version, describe the change in one line, and record the owner’s acceptance again for that change alone.

Decide in advance which changes need the owner again. Correcting a typo in a rule description may not need a new signature. Changing logic that alters values in the target does. Writing that line down in the record saves an argument later about whether a change was minor.

Freeze the record at the point of load. After the load, the signed version is the reference for reconciling the target against the source. If the record moved after the load ran, the reconciliation has no fixed point to compare against.

Questions about mapping sign-off records

How long should a sign-off record be kept after the load?

Keep it for as long as the load’s reconciliation reports and any later correction to the loaded data could be questioned. Your retention policy and any regulatory obligations for the data set the actual period, so confirm those with whoever owns records management before you set a deletion date.

Can one sign-off record cover more than one source system?

Yes, as long as each row names its source system. Split the record when two systems hold the same target field under different codes or formats, because the owner needs to see each system’s rule on its own.

What happens when the owner rejects a rule during review?

Record the rejection and the owner’s reason on the row. Rewrite the rule or the expected value, run the samples again, and ask for acceptance on the changed row. Keep the rejected version in the history so the reason stays visible to anyone who reads the record later.

Does a signed mapping prove the loaded data is correct?

No. A signed mapping shows that the agreed rules were approved. It does not show that the load applied those rules correctly. That needs a reconciliation after the load that compares loaded values with the expected output on the sheet.

Should a derived value get its own sign-off line?

It should when the derivation combines fields in a way the owner must judge, such as an account status built from three inputs. A separate line lets the owner accept the derivation on its own, so a change to one input does not reopen the whole object.