OBLYTECH Logo
OBLYTECH Logo

Analyze vulnerability remediation status with generative AI

Generative AI can report vulnerability remediation status on request. In the Analyze vulnerability remediation status agentic workflow, you ask an AI agent in plain language for a given month. The answer covers the share of vulnerable item (VIT) records that met or missed their SLA targets, split by severity and assignment group.

Confirm activation and roles before the first request

Two conditions have to be met before you can run the workflow. The panel that hosts the workflow must be activated, and the signed-in user must hold one of the vulnerability roles. Your license also shapes what you can reach. Depending on the license, some generative AI skills and agentic workflows may not be included, so confirm entitlement before you plan a monthly review around this tool.

  • Panel: the ServiceNow Otto® panel on Brazil, Australia and Zurich, or the Now Assist panel on Xanadu.
  • Roles: sn_vul.vulnerability_admin or sn_vul.vulnerability_analyst.

Check the panel name on your own instance before you brief your team, because the label you see depends on the release your instance runs.

Starting the agent and running a request

  1. Select the panel icon in the header of any page on the instance.
  2. In the panel, select the Analyze vulnerability remediation status option.
  3. Type your request in natural language.

The workflow runs on demand, so it answers the questions you type. Background retrieval of metrics is covered in a later section. Lookups default to assignment group. If you leave the month out, the agent starts with the current month and steps back one month at a time, so a request without a period can return a month you did not mean to review.

Your conversation is saved until you start a new chat, and the new chat icon starts one. To end the conversation, use End the session or Stop. For more on the workspace, see the IT remediation workspace page.

Writing requests that return a usable monthly view

The workflow answers one core question: how well your teams met their monthly remediation target dates for vulnerable item records, as reported in your Service Level Agreement (SLA). Shape each request around that question by naming the period and, when needed, the slice you want to see.

Naming the month and year

Put the month and year in the request, for example the month of October 2024. Without a month, the agent works from the current month backward, so a request with no period can return a different month than you expected. Name the period each time to keep the results comparable across your monthly reviews.

Adding a configuration item class or vulnerability

You can ask for a breakdown by configuration item class or by vulnerability. Put the class in the same request as the month. Asking for Windows servers in a given month returns compliance for that class in that month. If the class is container-based, check the container vulnerable items and remediation page before you set the filter.

Asking follow-up questions in the same session

Follow-up questions keep the month from your original request. Ask which asset types account for the largest number of missed SLAs, and the answer is organized by asset type for that month. Ask which assignment group had the fewest missed Critical SLAs, and the agent returns the group with the fewest Critical vulnerable items that missed the SLA. You can also ask for missed SLAs by VIT category, which adds a view the summary does not give.

Reading the summary and severity breakdown

A single-month answer comes back in sections. Read them in order, because each one narrows the picture the one before it gives.

  • Summary: the total records that had SLA remediation targets for the month and year you requested, with the percentage that missed target dates and the percentage that met them.
  • Breakdown by severity: the vulnerable items that missed remediation targets, grouped as Critical, High, Medium and Low.
  • Breakdown by assignment groups: the percentage of records with missed targets, split across assignment groups.

Each summary carries a More information link named for its period, such as Remediation Compliance for October 2024. The link opens in a new tab in UI16 and shows the detail behind the figures.

Read the percentages together with the record counts. A high missed percentage across a small group points to a different problem than the same percentage across a large one, and a percentage on its own hides that difference.

For help planning this work, see ServiceNow implementation.

Comparing one month with another

With one month on screen, ask how it compares with another, for example how this data compares with November 2024. The reply opens with a Comparison Summary that sets the two periods side by side. It then gives a breakdown by severity of the vulnerable items that missed targets, followed by an Observations section that describes the trend between them.

Treat Observations as a starting point rather than a finding, and check both More information links before you report a change to group leads. A comparison works best when both months were run with the same request wording and the same filters. If you add a class to one question and leave it out of the other, the two summaries cover different records, and the change you see may reflect the filter as much as remediation performance.

Checking a result before you report it

  1. Confirm the period in the summary matches the month and year you meant to ask about.
  2. Open the More information link and check that the record count behind the percentage matches the summary total.
  3. Check the assignment group names in the breakdown against current group names. A renamed or merged group can make a team look as though its figures dropped.
  4. Compare the figure with the previous month’s result. Note any change the Observations section does not explain, and check the remediation rules and exceptions that apply to those items. For the rules and exceptions themselves, see the application vulnerability response remediation rules and exceptions page.

Keep a short note with the month, the request text and the figures you reported. When someone asks later how a number was produced, the note answers the question without a rerun of the workflow.

Customizing the workflow for your own process

On Xanadu, the agentic workflow can be changed. Duplicate it, adjust the settings in the copy to suit your process, and activate the duplicated version. Leave the original in place so you can compare the default results with the customized version.

The Xanadu workflow uses the Remediation Compliance Insights Provider agent. Settings you change in a copy may alter the figures it returns, so test the copy against a month whose results you already know before you use it for a review. Before you change any setting, write down what the default returns for a month you have already reviewed by hand. That baseline shows afterward whether a difference came from your change or from the data.

Where the metrics are cached and who can read them

Retrieved SLA metrics are cached on the Remediation Compliance Insights [sn_vul_ai_remediation_insights] table. Two processes fill it. The agentic transactions cache the metrics retrieved for each of your requests, and a background job retrieves the metrics monthly.

The table has access control lists that limit who can read its records. For tighter control, grant the granular roles sn_vul_ai.read_rem_insights and sn_vul_ai.write_rem_insights. The sn_vul.vulnerability_admin and sn_vul.vulnerability_analyst roles inherit both granular roles automatically. The VR.System role also inherits them, so the background job can run.

The caching description applies to the Brazil, Australia and Zurich releases. On Xanadu, confirm the table and the background job on your instance before you plan around them.

Questions about the remediation compliance agent

What should I do if the agent does not answer?

Ask the agent to review your previous question, or ask it to show the output for the previous question. Include the month and year again in the new request so the agent does not fall back to the current month.

Can the comparison cover more than two months?

The comparison pairs the month from your first request with the month in your latest request. For a longer run, ask for each month separately and record the summary figures for each one in your own tracker, so the trend across the year stays visible.

Can a request combine a month with more than one filter?

Start with one filter alongside the month, then use a follow-up question to move to another class, vulnerability or severity. Each answer stays easy to check against its More information link that way.

Should a team lead receive the raw breakdown?

Share the summary with group leads after you have checked it, and explain any percentage that rests on a small count. A breakdown by assignment group names teams directly, so a figure read out of context can look like a verdict on a team that did not own the missed targets.