To connect Tenable.io to Configuration Compliance, activate the Tenable.io integrations in the Vulnerability Response Integration with Tenable application. The Assets Integration creates the configuration items, the Fixed and Open Compliance Results integrations import test results, and the Backfill Integration matches results to assets missed on the first pass.
Which Tenable.io integrations feed Configuration Compliance
The Tenable.io integrations ship inside the Vulnerability Response Integration with Tenable application, and the same set serves both Vulnerability Response and Configuration Compliance. You do not install a separate connector for compliance. Setup Assistant in Vulnerability Response adds each Tenable.io instance and also installs and configures the application. Tenable.io is a cloud-based enterprise integration that supports multi-source deployments, so you can add more than one instance across your environment.
Integrations that carry asset and compliance data
Four integrations handle the compliance side. Each one writes to a different part of the data model, so it helps to know which one you are looking at before you change a schedule.
- Tenable.io Assets Integration retrieves all asset data, including asset tags, and creates unique configuration items for assets that do not match an existing CI.
- Tenable.io Fixed Compliance Results Integration retrieves test results with a status of Passed or Skipped, along with the policies, configuration tests and citations they reference.
- Tenable.io Open Compliance Results Integration retrieves test results with a status of Failed, Warning, Error or Unknown. These are the results you investigate and remediate.
- Tenable.io Compliance Results Backfill Integration matches results with assets that were missing on an earlier import and clears those entries once they match.
Starting with v3.0, the Assets Integration can also bring in secure configuration assessment data along with asset data when the compliance results integration is activated. When assets across your environment share an IP address, the Assets Integration updates the existing CI with a network partition identifier attribute.
What arrives in Configuration Compliance
Imported items appear as records in the Configuration Compliance application. Knowing what each record type holds makes the first set of results easier to read.
- Test results record the outcome of each configuration check for an asset.
- Policies group the configuration checks that apply to a set of assets.
- Configuration tests hold the individual controls that each test result refers to.
- Citations name the authoritative source behind each configuration test.
Test results drive the investigation work, and the other three give each result its context.
Activating the compliance integrations
The Backfill Integration is inactive by default. You must activate both the Fixed and the Open Compliance Results integrations to keep ingesting compliance data, and the same steps apply to each record.
- Navigate to Tenable Vulnerability Integration > Administration > Integrations.
- From the Tenable Integrations list, open the integration record.
- Select the Active check box.
- Select Update.
Keep the default schedule settings the first time you activate these integrations. The backfill runs after the Assets Integration completes, so confirm that the Assets Integration is also active.
If you are rolling this out across several Tenable.io instances, plan the activation for each instance separately rather than switching them all on at once. For help planning this work, see ServiceNow implementation.
How the Fixed and Open compliance integrations chain
The Fixed integration runs first. When it is active and completes successfully, it triggers the Open integration, provided the Open integration is active and is named in the Next Integration field on the Fixed record. The Open integration runs on demand by default. You can change its scheduling from the integration record under Tenable Vulnerability Integration > Integrations.
If the Fixed integration is inactive, or it finishes with an error, the Open integration does not start. In that case, run the Open integration manually or give it its own schedule. Both integrations write execution details and error information to the integration run record, which is the first place to look when the chain stops.
Think of the pair as one import with two passes. The Fixed pass pulls results that passed or were skipped, and the Open pass pulls the results that need attention. Keeping both active and chained means you do not have to start the second pass yourself.
Reading the Ignored CIs count after each run
A compliance result can attach only to an asset that exists in your instance. When an asset cannot be matched, the result is ignored, and its asset ID is stored in a temporary record in the missing asset table. Assessment data for assets without an asset ID is not imported at all, so a missing asset ID is something to check on the asset record itself, since the backfill will not import data for it.
The integration run record stores the total in the Ignored CIs field. The first time you open a run, check both the Items tab and the Configuration tab to find the field. Compare the value on the Assets Integration run with the value on the compliance run. Suppose the Assets Integration imports 80 assets in one run and the compliance results integration imports 100. The difference of 20 ignored CIs is the set of assets the backfill integration works through on its next run.
The backfill integration imports up to 200 asset IDs per run and removes its temporary records once each asset and its data are matched. A large backlog can take several runs to clear, so expect the Ignored CIs count to fall over a series of runs rather than in one step.
Handling the v6.1.3 split when you upgrade
Starting with v6.1.3, the original Tenable.io Compliance Results Integration is no longer available. The Fixed and Open integrations replace it, and they import compliance results separately based on status. Splitting the import this way improves ingestion performance when compliance volumes are large.
Existing compliance data stays unchanged after an upgrade. The Fixed and Open integrations keep the start time you configured and continue fetching incrementally from where the previous integration left off. Both use the same Compliance Results Transform map and import into the Test Results Import table, so the data mapping does not change. You can adjust the scheduling or turn off the automatic chain. If you turn off the chain, keep both integrations active and run or schedule the Open integration yourself.
Checking imported results in Configuration Compliance
Imported data appears on the test result, policy and configuration test records in the Configuration Compliance application. Use those records to answer two questions: which assets listed in your CMDB show configuration-related vulnerabilities, and whether those assets meet the policies and controls assigned to them.
Configuration Compliance v14.9 renamed several terms. Older records may use the earlier names, so map them before you search:
- Test Result Group became Remediation Task.
- Group Rules became Remediation Task Rules.
- Policy became Test group.
Once failed results are on screen, the remediation model explains how those results turn into work. See how remediation works in configuration compliance. To control which policies reach which assets, read setting up configuration compliance assignment rules.
Troubleshooting a first import
Work through these checks in order when a first import looks incomplete.
- Open each integration record and confirm that the Active check box is selected for the Assets, Fixed, Open and Backfill integrations.
- On the Fixed integration record, confirm that the Next Integration field names the Open integration.
- If the Fixed run ended with an error, read that error on its integration run record before you start the Open integration by hand.
- If the Ignored CIs count stays high after several backfill runs, check the asset IDs of the assets involved, since assessment data is not imported for assets without one.
If a failed result needs an exception rather than a fix, handle the request through managing configuration compliance exception requests. If the same assets also receive results from Microsoft Defender for Cloud, read about importing Microsoft Defender for Cloud results into configuration compliance.
Questions about Tenable.io credentials, plugins and vulnerability integrations
Which integrations supply credentials for rescans?
The Scan Credential Integration retrieves the scan credentials configured in Tenable.io and stores them in the scan credential table. It runs weekly. The Template Integration retrieves the available Tenable.io credentials for rescans and keeps a single template record temporarily, because credentials are specific to each instance. The imported credentials are used to reach the scanner when you start a scan request from the ServiceNow AI Platform. Neither integration imports compliance results.
How do plugin and scan metadata records connect to findings?
The Plugin Integration pulls plugin data to keep Tenable Identifiers (Ten IDs) current, based on the date the plugins were last updated by a Tenable.io run. The Scan Metadata Integration reads the scans endpoint and stores each scan’s ID, name, status, start and end times and scan type in a custom table. It then links each discovered item, whether a configuration item or a vulnerability, to its latest scan record, so triage can show when the item was last scanned and how that scan ran.
How long does the chunk status table keep imported data?
The Assets Integration and the vulnerability integrations import data in chunks and hold those chunks in the chunk status table. A table cleaner removes stored data from that table after 30 days. The 30-day window applies to the chunk status table only.
What do the Fixed and Open vulnerability integrations import?
The Fixed Vulnerabilities Integration retrieves vulnerability data filtered by severity and outputs closed or fixed vulnerable items. It then triggers the Open Vulnerabilities Integration, which retrieves open vulnerability data and outputs new or reopened vulnerable items. By default, vulnerable items are created for detections in the Open and Reopened states and not for Fixed detections. If you turn on the flag named Create vulnerable items for ‘Fixed’ vulnerability detections in Setup Assistant, the new items start in the Fixed state, which can affect import performance.