OBLYTECH Logo
OBLYTECH Logo

Run control assessment through attestation

You can attest controls with an assessment method instead of the classic attestation. Set the Enable smart assessments on control system property to true, set the Attestation method on the control objective, and select an assessment template. Moving a control to the Attest state triggers the assessment, and a passing result closes open issues and marks the control compliant.

Install the scoped applications and enable the system property

The assessment method needs more than the GRC: Policy and Compliance Management (sn_compliance) plugin. That plugin ships the GRC smart assessment template, but four scoped applications are also required. Confirm that each one is installed on your instance before you change any control or control objective records.

  • Smart Assessment core (sn_smart_asmt)
  • Smart assessment Migration tools (sn_smart_asmt_mig)
  • Smart Assessment Connected (sn_smart_asmt_conn)
  • Smart Assessment Designer (sn_smart_asmt_desg)

Next, set the Enable smart assessments on control system property to true. Controls use the assessment method based on the GRC attestation template only while this property is true.

Build the template from legacy metric types

Templates are built in the Smart Assessment Engine. If your instance still holds legacy assessment metric types, create a new assessment template from each one. The migration tools move the source metric type and its template category into the new format. The assessment template migrations table, sn_smart_asmt_mig_template_migration, is the table used for these moves,.

Run the first migration on a copy of the instance where you can compare the old and new templates side by side. Once the template exists, the steps for assigning and reviewing control attestations in the designer are in assigning and reviewing control attestations in the designer.

For help planning this work, see ServiceNow implementation.

Set the attestation method on the control objective

The attestation method is set at the control objective level, and the controls generated from that objective inherit it. When the system property is true and the control objective holds Attestation in its Attestation method field, each generated control takes the Attestation method and Attestation field values from the objective. The Attestation method field value defaults to Attestation.

Controls are generated automatically when the Create controls automatically option is enabled on the control objective. If you create a control from an objective instead, its Attestation method and Attestation fields pre-fill from the objective when the objective has values in them.

The Attestation method field is read only on the control. The Attestation field stays editable, so you can select a different template for the attestation. Until a control moves to the Attest state, both the Attestation method and Attestation values can still be updated.

A change from classic attestation to the Attestation method on the control objective is reflected in the control records generated from it. Make that change once on the objective, then open a sample of the generated controls to confirm they picked it up.

When you create a new control objective, you choose either classic attestation or attestation as its attestation method. Pick the value before you generate controls, so the generated records start with the method you intend.

Run the assessment when a control reaches the Attest state

Moving a control to the Attest state triggers its assessments. The control owner and the attestation respondents each receive an email notification. The subject line includes the name of the new attestation, the control number, and the due date for completing it. Plan respondent time around that due date.

Work through the sequence below for each pilot control. The screen-level steps are covered in attesting controls with an assessment method in Compliance Workspace. Labels and status values can vary by release, so confirm them on your instance before you run the sequence.

  1. Open the control objective and confirm the Attestation method field shows Attestation.
  2. Confirm the Attestation field points to the template you intend to use, and change it there if needed.
  3. Open a generated control and check that its Attestation method and Attestation values match the objective.
  4. Move the control to the Attest state. The assessments start and the notification goes out.
  5. Check the attestation widgets on the control and control objective overview pages to follow progress.
  6. Review the outcome after the attestation is completed.

A failed attestation makes the control non-compliant and creates an issue, or updates the Issue source field on an issue that already exists. When the control moves to the Attest state and the attestation passes, existing issues close and the control becomes compliant. To see control attestations alongside a control’s other relationships, use the 360° view in the Policy and Compliance Management relationship visualization.

If a control shows an unexpected state, compare its Attestation method and Attestation values with the objective first, because those values determine which assessment method the control uses.

Roles for each attestation task

  • sn_grc.business_user and sn_grc.business_user_lite: respond to attestations in My Attestations on the Task page of Compliance Workspace, Risk Portal, and Employee Center.
  • sn_compliance_ws.corporate_compliance_manager and sn_compliance_ws.it_compliance_manager: view and edit the assessment templates.
  • sn_compliance.attestation_creator: create template categories and run template migration.
  • sn_compliance.user: read all the assessments related to a control category.

Changes that cancel or re-trigger assessments

Several control actions affect assessments that are already running. Check these before you change a control in the middle of an attestation cycle.

  • Return to Draft: selecting the Return to Draft button moves the control to Draft and cancels all active assessments on it.
  • Retirement: retiring a control cancels all of its related assessments.
  • Exempt: marking a control Exempt because of a policy exception cancels its assessments. Clearing Exempt while the control is in the Attest state re-triggers them, and all the fields in the Attestation section of the control become read only.
  • Published policy: when a policy linked to the control objective is published, all the fields on the control objective form become read only.

Return to Draft and retirement both cancel work that respondents may already have started, so tell the control owner before you run either action.

Check the setup before you run a pilot

Work through these four items before you touch a control.

  • All four scoped applications are installed.
  • The Enable smart assessments on control system property is set to true.
  • Each pilot control objective has an Attestation field value that names the template you want.
  • Each pilot control objective holds Attestation in its Attestation method field.

Check the Attestation field on each pilot objective as well as the method. A control can hold the right method and still point at a template you did not intend, and the template is what the assessment asks respondents to complete.

Plan a pilot across control objectives

A cautious rollout starts with a small set of control objectives rather than switching the whole library at once. Changes to an objective flow to every control generated from it, so one mistake on an objective repeats across all of its controls. Choose objectives that each map to a single template, and check the first set of generated controls before you widen the scope.

Control objectives and controls can both be created in Compliance Workspace, and the attestation fields sit on those forms. Keep a short log for each pilot control that records its objective, template, due date, and the state it reached. That log makes it easier to compare results when you widen the scope.

For a separate control effectiveness assessment in the same program, see configuring a control effectiveness assessment.

Questions about older objectives, related lists and template categories

Do older control objectives switch to the assessment method?

No. Older control objectives default to classic assessment as their assessment method. To move one to the assessment method, change the control objective or the control directly. Framework attachment is covered in mapping controls to compliance frameworks.

Which related list shows open and completed attestations?

After a control is saved and attested, the Attestations related list appears on the control record. It shows every assessment instance in the Open and Completed states, so you can see both running and finished assessments in one place.

What happens to classic attestation history when a control changes method?

A control generated under the classic attestation method keeps the details of its completed attestations on the Classic attestation related list.

Who can read an assessment template category?

Each template category has a Category role field that sets the minimum reader role for its templates. That role must contain the sn_smart_asmt.template_reader role, and anyone who needs to open a template in that category has to hold it.