OBLYTECH Logo
OBLYTECH Logo

Visualize dependencies for a business impact analysis

To visualize business impact analysis relationships, open the 360° view from a business impact analysis record in the Business Continuity Workspace. It shows the analysis alongside its template, dependencies, and vendors, so you can see how it connects to the entity it applies to. You can use it while you are still creating the analysis.

Where the 360° view fits in the BIA workflow

A business impact analysis (BIA) moves through business continuity management (BCM) in a defined sequence. The owner works through the steps listed in the workflow and adds the details of the analysis. When the BIA reaches Pending approval, a user with the sn_bia.bia_manager role can approve or reject it, and an approved analysis moves to the Approved state. The owner can also generate a PDF or Microsoft Word report of the analysis.

The 360° view lets you inspect this work without adding a step. For the terms, read the plain-language guide to business continuity management. For each stage in order, use the BIA workflow from creation to archive, and for the reviewer side, see approving a BIA as the owner or BCM lead.

Opening the 360° view on a BIA record

These steps are the same in the Brazil and Xanadu releases.

  1. Navigate to Workspaces > Business Continuity Workspace.
  2. In the List view, go to Business Impact Analysis and select a record.
  3. Select 360° view on the record.

The view shows Impact Analysis (the analysis name), Applies to (the entity covered, such as a business process or business service), Template, and Depends on. Select Template or Depends on to open its details in the side panel, and select Vendors for vendor details. Use the breadcrumb at the top of the page to return to the analysis.

Roles for each task in the view

The role requirements differ by task, so check the role for the task you are doing:

  • Open the 360° view on a BIA: sn_bia.bia_admin, sn_bcm.program_manager, or sn_bcm.planner.
  • Define relationship registries and views under 360° View Configurations: sn_bcm.admin.
  • Create a relationship registry record in the Data Relationships Framework: sn_grc_rel_config.admin.
  • Configure the Impact analysis dependency update configuration: a BCM administrator.
  • Update BIA dependencies manually: sn_bcm.program_manager, sn_bcm.planner, or sn_bcm.admin.

Activating the scheduled job that collects dependency snapshots is a system administrator task.

Configuring the relationships the 360° view displays

Define the relationships first, then arrange them into a view. Open 360° View Configurations > Relationship Registries, fill in the form, and select Submit. The fields are:

  • Name, a descriptive name for the registry.
  • Table, the table where the relationship is defined.
  • Relationship type: One-to-many, Many-to-many, Scripted (a custom relationship from the ServiceNow AI Platform), or One-to-one (any relationship that is available as a field in the selected table).
  • Active, selected to mark the relationship as active.
  • Relationship and Relationship table, where the table name follows your Relationship choice.

Next, open 360° View Configurations > Configure 360° Views, save the record, and choose Select Relationships. Complete these fields:

  • Name and Data relationship, the registry you defined in the previous step.
  • Node position, the sector you set up earlier for this relationship.
  • Filter, the conditions that decide which relationships display, such as limiting the view to controls with failures.
  • Order, the position of the element in the view. Changing a value from 0 to 1 moves the element to the next position.

Submit the record, then select the new view on the 360° view. If an expected relationship is missing, the usual causes are an inactive registry or a filter that excludes the record you are testing.

For help planning this work, see ServiceNow implementation.

Creating a relationship registry record

Go to All > Data Relationships Framework > Relationship registries, select New, fill in the form, and select Submit. The form includes these fields:

  • Name, such as BIA analysis to Issue.
  • Table, such as Impact analysis [sn_bia_analysis].
  • Relationship type, with options One-to-one, One-to-many, Many-to-many, and Scripted relationship.
  • Relationship, the linked table, such as Issue [sn_grc_issue]. The Relationship table field is read-only and repeats this choice.
  • Related field, the fields set as the target or output of the relationship.

Two screens carry the name Relationship Registries. The one under 360° View Configurations feeds the view, and the one under the Data Relationships Framework defines the table link. Check which one you are on before you create a record.

How dependencies reach a BIA from the CMDB

Dependencies come from the configuration management database (CMDB) and are fetched for the entity named in the Applies to field of the BIA. Set up the Impact analysis dependency update configuration module, found under General Administration in the Business Continuity Workspace. The setup is a one-time activity, and after it the dependency updates sync into the BIA. The full steps are in configuring impact analysis dependency updates.

On each configuration, set the BIA record name, the target records, the sources, and the notification preferences. Auto-update dependencies applies the snapshot to the BIA without a manual step, and Send notification emails the users or groups named in the configuration, such as the BIA owner and BCM lead. You can create several configurations for one record. The system evaluates them in ascending order and applies the first whose filter the record meets, such as a separate rule for archived BIA records.

Reviewing snapshots before they apply

The Update BIA dependencies snapshot scheduled job ships with the base system and is not active by default. A system administrator selects Active and then Execute now to start it. Once running, the job runs weekly, checks non-archived BIA records for changes in the CMDB relationships, and creates a snapshot record for each BIA that changed. Each asset is marked Added, Updated, or Deleted.

With Auto-update dependencies set to True, the job applies the snapshot and updates the BIA fields named in the configuration. With Send notification set to True, the users named in the configuration receive a notice.

To review a snapshot, open the Pending updates module in the Business Impact Analysis list view of the Business Continuity Workspace. The Added, Updated, and Deleted tabs show the changes. Deleted assets are marked Invalid when the snapshot is committed. When a snapshot is waiting, the Dependency assessment on the BIA shows: The dependencies have been updated in the sources. To review and apply the changes, select here. One active snapshot is kept per BIA, and completed snapshots not updated in six months are removed automatically.

Updating BIA dependencies by hand

Open a BIA in the Draft state, go to the Assessments tab, select Open assessment in the Dependency assessment, and then select Update dependencies. The system then does one of three things. It applies an existing snapshot to the BIA. If no snapshot exists and a configuration filter matches, it fetches dependencies in real time from the sources. If no filter matches, the workflow continues without a dependency update.

During the import, UI actions on the BIA are blocked, and the BIA cannot move to its next state. When the message Dependencies are being updated appears, refresh the page, finish the Dependency assessment, and select Save. BIA owners and approvers can also bring in updates by saving changes to the BIA.

Release and volume limits for dependency updates

Check these on your instance and release. The scheduled job processes up to 1,000 BIA records. That ceiling is set by the sn_irm_shared_cmn.config.get_gliderecord_limit system property, and it applies when you have more than 1,000 BIAs and the job is active.

From the Xanadu release, the latest BIA record’s dependency data can support an asset dependency assessment. The columns Related item BIA, Related item Recovery Time Objective (RTO), Related item Recovery Point Objective (RPO), and Related item Recovery Tier carry that information, and the Required Recovery Timeframe and Required Data Backup columns on the BIA record display it.

Questions about the 360° view and dependency updates

Does the BIA dependency feature need the Data Relationships Framework?

From the Brazil release, the Data Relationships Framework application supports BCM as the framework that fetches dependencies into a BIA. It installs with BCM by default, so check that it is present before you build registries.

Why does a BIA show no snapshot after the job runs?

A snapshot is created only when a BIA’s dependencies have changed in the CMDB. If nothing changed, the job leaves the record alone. If you expected a change, compare the source relationships with the configuration’s filter, because a record that does not match the filter is skipped.

How does the 360° view differ from the Dependency assessment?

The 360° view lets you inspect the analysis, its template, dependencies, and vendors, in a side panel. The Dependency assessment is where you bring in dependency updates through the Update dependencies action.

Does a manual update create a snapshot record too?

Yes. A snapshot record is created for each BIA update, whether the scheduled job runs it or you select Update dependencies. Manual snapshots appear in Pending updates alongside the others.

Do I need the scheduled job active before manual updates work?

No. The manual route works whether or not the job is active, so it is the route to use when the job has not been turned on.