Configure crisis map alert rules and search

Alert rules decide which feed items are promoted to alerts on the crisis map dashboard, and they also set when those alerts are dismissed. You create each rule under Threat and Alert Data Feeds, then combine a feed condition, an optional advanced condition script, and dismiss conditions. Place search is a separate setting: set one system property to True.

Confirm the prerequisites and roles before you open the form

Alert rules belong to the crisis map configuration, so check two things first. The Crisis map application has to be installed and active. The business locations you want to watch should exist as resource records, because the crisis map plots your assets from the resources you configure, and feed conditions are written around locations such as corporate offices, employee locations, data centers, and suppliers.

Creating alert rules and setting up place search both require the sn_bcm.planner or sn_bcm.program_manager role. Alert actions require sn_bcm.program_manager. If a step is blocked, compare the role that step requires with the roles on your user before you change anything else.

How an alert rule decides what reaches the dashboard

An alert rule is a filter with a specific job. An organization may subscribe to thousands of feeds, and many of the items in them have nothing to do with its sites. The rule narrows that stream to feed items that could disrupt a business location, so the crisis manager is warned about impending danger, potential harm, or risk that can cause business disruption.

The Create Condition section holds the If Resource Impacted option, the Advanced option, the Optimize Impact Area check box, and the Feed Condition field. The Advanced Condition Script field appears when Advanced is selected. The Dismiss Condition section controls when an existing alert is removed. Design both sides together, because a rule that creates alerts too broadly fills the dashboard, while an early dismiss condition can remove an alert that still matters.

Create an alert rule from the Alert Rules list

The Advanced option changes what the form shows, so decide on it before you fill in the condition fields.

  1. Navigate to Threat and Alert Data Feeds, then Administration, then Alert Rules.
  2. Click New.
  3. Enter a Name that identifies the risk the rule watches.
  4. Select Active to turn the rule on.
  5. Check the Application field. It is read-only and marks the rule as relevant to the crisis map.
  6. Set Order, the display order of the rule. The default is 100.
  7. Enter a Description that explains what kind of alert the rule raises and why it matters to your locations.
  8. Configure the Create Condition section, then set the Feed Condition.
  9. Configure the Dismiss Condition section.
  10. Click Submit.

Write the Description for the person who will read the alert, not the person who built the rule. A crisis manager scanning the dashboard needs to see what the alert concerns and why the rule raised it. For a separate rule type, see the application vulnerability response remediation rules and exceptions page. Vulnerability response has its own grouping rules, described in the triage grouping rules topic, and those are separate from crisis map alert rules.

After you submit the rule, wait for a feed item that matches it and confirm that the item appears on the dashboard.

Writing feed conditions and advanced condition scripts

Start with the simple feed conditions. Get the rule working with plain filters first, and add the advanced option when a plain filter cannot express the condition you need. Adding script logic before the basic rule behaves as you expect makes it hard to tell which part causes a result.

The Advanced Condition Script field takes a script that filters feeds by the criteria you specify. Two examples are a filter for active alerts and a proximity condition based on how close the crisis is to your asset locations. Write the script against the fields your instance exposes and test it before you rely on it. Start with a feed item you already know about, confirm whether the rule raises an alert for it, and then change one condition at a time.

Setting dismiss conditions so stale alerts leave the dashboard

An alert that stays on the dashboard after the threat has passed clutters the list and pulls attention from current alerts. The Dismiss Condition section offers two triggers.

  • When Feed Deleted: dismisses the alert from the dashboard if the feed that raised it is deleted.
  • When Resources Not Impacted: dismisses the alert from the dashboard if there are no resources impacted.

The triggers cover different situations. A deleted feed removes the source of the alert, while a resource that is no longer impacted means the alert no longer touches your locations, even though the feed remains.

Turning on place search for the crisis map

Place search lets you locate a place on the Google map inside the crisis map. Before you change anything, confirm that you have purchased and set up the Google Maps API, because the crisis map requires that setup.

  1. Enter sys_properties.list in the left pane of the application navigation filter to open the System Properties table.
  2. Search the Name column for sn_bcm_map.use_google_places_lib.
  3. In the Value column, set the property to True.

If you cannot open the System Properties table, ask your administrator to check your access rather than changing roles on your own account.

Searching for places and asset layers on the map

Open the Crisis map from the List view, where its icon appears once the Crisis map application is installed. Enter the location or data center affected by an alert in the Search Assets and Locations field. Results combine your company records, shown with display values and icons, with Google map pin icons. If you are not sure which location the alert touches, open the Layers icon and select asset types such as Locations, Web Servers, Datacenters, or Vendors.

Alert actions that notify stakeholders or declare a crisis

Open alert actions from Threat and Alert Data Feeds, then Administration, then Alert Actions. The base system includes two actions.

  • Notify: sends email notifications to stakeholders and asset managers within the impact radius.
  • Declare Crisis: declares a combination of an alert and critical assets as a crisis event.

To add an action, click New, fill in the Alert Action form, and select Submit. You can follow up on the action from the crisis map dashboard. Because alert actions require the sn_bcm.program_manager role, settle who builds them before the work starts. If your team also sends crisis notices through another platform, compare the Notify action with crisis management map Everbridge notifications so stakeholders do not receive the same message twice.

Reviewing alerts and dismissing them from the dashboard

The Alerts panel shows each alert’s title, category, event, source, and severity, such as Extreme or Severe. Use Search to find alerts by keyword, switch the Show option between Active Alerts and Dismissed Alerts, and sort by severity, created date, or updated date. The Refresh control reloads the alerts display.

When an alert is resolved, dismiss it from the Alerts panel. You can find it again by switching the Show option to Dismissed Alerts.

Troubleshooting alert rules and place search

When a rule or place search fails, work through these checks in order.

  • Confirm that Active is selected on the rule, and that your role is one of those listed for the failed step.
  • Check that the Crisis map application is installed and active.
  • Compare the feed condition with a feed item you know should match, and loosen one condition at a time.
  • If the rule depends on Resource Impacted, check that the locations it should match exist as configured resources.
  • If a location search returns company records but no Google pins, check the value of sn_bcm_map.use_google_places_lib and confirm that the Google Maps setup is complete.

Stop at the first failed check and fix that one. Changing several settings at once makes it hard to tell which change solved the problem.

Release differences in alert rules and place search

The alert rule and place search pages read the same in the Brazil, Australia, and Zurich releases. The Brazil versions were updated on 10 September 2026, the Australia versions on 12 March 2026, and the Zurich versions on 31 July 2025. The topic paths refer to the BCM Classic Workspace, BCM Configurable Workspace, and BCM UIB Workspace, so match each path to the screen your instance shows.

Questions about rule order, dismissed alerts, and subscriptions

What does the Order field change on an alert rule?

Order sets the display order of the rule and defaults to 100. Test with two rules before you rely on its effect on the dashboard.

Why can I not edit the Application field?

The field is read-only. It marks the rule as relevant to the crisis map, which helps the system distinguish crisis map items from other items.

What happens to an alert after someone dismisses it?

A dismissed alert leaves the active list. Switch the Show option from Active Alerts to Dismissed Alerts to find it again.

Can I subscribe to an alert?

Yes. Select the bell icon on the alert to subscribe to it.