Operational technology (OT) change approval is the review step in the Advanced OT Change Model. Reviewers in the site approval group check a requested change, can edit the request, and then approve or deny it. The change moves forward once 51% of the approval group approves. The Basic OT Change Model has no approval step.
Setup needed before approvals can run
Approval depends on a site, a site approval group that holds the members assigned to review and approve change requests, and reviewers who hold the right role. Each approver must have the sn_ot_change_read role, so check that role on each reviewer before the first request is routed to them.
The threshold is 51% of the approval group. Because 51% of ten is 5.1, a ten-person group needs more than five approvals. Test how your instance handles a group size that produces a fractional count before you rely on the threshold.
Each action has its own role. Choosing a change model requires sn_ot_change_admin or admin. Creating a change request from a device record requires sn_ot_change_write. Approving a change requires the sn_ot_change_read role that every approver carries.
How approvers are added to a change
Approvers reach a change in two ways. The first is membership in the site approval group. You can add a group member, or approver, manually to that group so the person can review the OT change request. The second is the list of site-level approvers that the flow adds to the change record after it evaluates the policy.
How the approval flow runs after a change request is created
Once a change request exists, the platform runs the approval flow in a fixed order. It creates the change request, invokes the flow based on the change model, applies the change approval policy, evaluates the decision records, executes the matching approval definitions, and then adds the list of site-level approvers to the change record. When approvals look wrong, check the model, the policy and the decisions before you blame a reviewer, because the approver list is the output of those steps.
The change model decides whether an approval policy applies at all. The Advanced OT Change Model includes a change approval policy, and you can create your own. The Basic OT Change Model has no change approval policy, so the flow has nothing to evaluate for a Basic change.
Choosing an execution option for a policy
A change approval policy has an Execution field with two options. First decision that matches uses the first matching decision in ascending order of the Order column on the Decisions list, and applies its associated approval definition. Run all decisions that match applies the approval definition of every matching decision. Choose the first option when one rule should set the approval path. Choose the second when several rules each add a required approval.
Creating a policy requires the admin or change_manager role. The Decision Builder plugin (sn_decision_design) must be installed first. Go to All > Change > Change Policy, select Create new change approval policy, enter a name, choose the execution option, and select Create & Continue. Then add inputs and decisions. An input is a variable source, such as a change field or a referenced record value, and each condition column evaluates an input. Confirm the menu path on your instance before you start.
What reviewers check and decide in the Approve stage
In the Approve stage, reviewers listed in the table on the task form see an Approve button and a Deny button. Approve accepts the change. Deny rejects it. The Comments field holds the additional information about the approval or denial. The stage has one task, so that decision is the whole stage.
Read the plan the requester completed in the Plan stage before you choose a button. The Plan stage supplies the material a reviewer needs:
- Justification: the reason the change must take place.
- Implementation plan: how the requested change is carried out.
- Risk and impact analysis: the risk and impact factors tied to the change.
- Backout plan: how to reverse the change if necessary.
- Test plan: how to test the implemented change.
- Planned start date and planned end date: when the change takes place and when it ends.
For OT changes, the backout and test plans deserve the closest reading. A change that touches equipment in a running process is hard to undo when the reversal path is thin. That is a review judgment, not a product rule.
Suggesting changes and recording the decision
Reviewers can suggest improvements as necessary. In the Advanced model, an approver reviews the change request, edits it as necessary, and then approves it. Use the Comments field to state the reason for each decision, and note in the same comment any edit you made during review.
Choosing a change model in Industrial Workspace Admin
Two change models are available: OT Change Basic and OT Change Advanced. Basic runs the change process without approvals. Advanced runs it with approvals, and you can assign an approval group to review the change request. Select the model with this procedure.
- Navigate to Industrial Workspace Admin > Guided Setup.
- In the Operational Technology Change Management category, select Get Started.
- Next to the Change Models section, select Configure.
- Select the change model that fits your organization.
- Edit the record as needed.
The change model is applied to the system, and you can then begin creating OT change requests. For help planning this work, see ServiceNow implementation.
The two models differ in their stages. Basic runs Initiate, Plan, Implement and Close. Advanced runs Initiate, Plan, Approve, Implement, Post-implementation Review, Spin-off Tasks and Close. In Basic, the Implement stage has one task, perform the change. In Advanced, it has three: stop the function, ensure LOTO, and perform the change.
Creating an OT change request from a device record
Creating a request from an OT device record requires the sn_ot_change_write role. Use this procedure.
- Navigate to All > Industrial Workspace.
- In the All OT Devices list, select an OT device record.
- Under the Related Records tab, select the OT Change Requests related list.
- Select New.
- Select the OT change model that applies to your organization.
- Select Create OT Change Record.
Some fields fill in automatically. The OT Device field fills in when the Industrial Process Manager application is enabled. When Industrial Process Manager is installed, the site assigned to the OT device appears in the Site field. When it is enabled and one entity is associated with the device, the Equipment model entity field fills in automatically. When several entities are associated with the device, that field is left empty.
Check the Site field on the new record before you continue, because the approval requirements are defined at site level. Once the request is created, the users in the Assignment group, Assigned to and Watch list fields are notified.
Implementation, post-implementation review and close
After approval, the Implement stage tracks the work on the targeted OT devices. Mark the stop the function task complete once you have stopped the function of the devices, if that step applies. Ensure LOTO, meaning the safety procedure that prevents machinery from starting by accident during maintenance or service, and mark it complete when the procedure is done. Mark perform the change complete when the change is performed and completed.
The Post-implementation Review stage has four check boxes: electrical, network, quality and safety. Select each one after that check is completed. The stage also lets you create OT change tasks for remaining work, and it includes a revoke LOTO step to mark complete after the change is implemented and reviewed. The Spin-off Tasks stage lists the change tasks that must still be completed.
In the Close stage, choose a close code that gives the reason the record was closed, and add close notes for any further detail.
Tracking approval turnaround after go-live
Once approvals run, the time between a request and its decision becomes a measurable step in the change process. Teams that want to track that interval can begin with the plain-language guide to operational metrics and the wider operational metrics hub. Before you use a turnaround figure to judge reviewers, read the common metric mistakes list, because an average can hide a slow approver.
Release differences and checks on your instance
The approval requirements, the 51% threshold and the flow steps are the same in the Xanadu, Yokohama, Zurich, Australia and Brazil releases. Check field labels and menu paths on your instance and release, since your instance may differ.
Questions about denied changes, missing groups and policy testing
What happens to a change after a reviewer selects Deny?
Deny rejects the change, and the Comments field holds the reason for the denial. Confirm the state the record moves to after a denial on your instance before you tell requesters what comes next.
What if a site has no approval group?
A site approval group is one of the four requirements for change approval, so set one up before you expect reviews to run. Test what happens when a site has no group on your instance rather than assuming an outcome.
Does approval mean the change can skip post-implementation checks?
No. Approval moves the request into the Implement stage. The electrical, network, quality and safety checks happen in the Post-implementation Review stage after the work is performed, so approval does not replace them.
Should a new approval policy be tested before it is used?
Yes. Create a test change against a non-production device record, if your instance has one, and check which approvers appear on the record after the flow runs. Compare that list with the approval group you intended.