To model an operational technology system service, create an OT system service record, complete its ownership, site and criticality fields, add the OT devices that belong to it, and enable the scheduled job that links the service to ISA equipment model entities. The example used here is a distributed control system (DCS) and its components.
What an OT system service represents in ServiceNow
An Operational Technology (OT) system service is the record that represents a group of control technology in the ServiceNow AI Platform. The category covers the technology and systems used to manage, control and monitor physical processes, machinery and industrial operations. These systems are typically employed in manufacturing, energy, utilities and transportation.
Modeling lets you describe a control system through its parts. Instead of tracking each device as a separate record, you attach the devices to one service, so the structure of the plant is visible in one place. The modeling described here is aimed at control systems, and the example is a DCS with all of its related components.
OT system services commonly cover the following categories:
- Distributed Control Systems (DCS)
- Supervisory Control and Data Acquisition (SCADA)
- Industrial Control Systems (ICS)
- Safety Instrumentation Systems (SIS)
- Manufacturing Execution Systems (MES)
- Process Control Systems
- Transportation Management Systems
- Energy Management Systems
- Building Management system services (BMS)
How a distributed control system is structured
A DCS is a platform for automated control and operation of a plant or industrial process. It coordinates and supervises an entire plant that contains many different processes. A DCS is process-oriented and uses closed loop control.
The main difference from a centralized control system is where control happens. In a centralized design, a single controller at a central location handles the control function. In a DCS, each process element, machine or group of machines has a dedicated controller.
Components to record in the model
The four groups of DCS components are as follows.
- Operator stations. These are where operators view the process and monitor alarms and alerts. They are the heart of the DCS.
- Servers, EWS and historians. These handle data collection and data exchange for the hardware configurations.
- Controllers and I/O modules. These exchange data with the servers.
- Field devices. Transmitters, switches, actuators and valves belong in this group.
A full DCS model also includes PLCs, control modules, EWS, RTU, HMI and SCADA components. Operator stations are the heart of the system, so it makes sense to record them first.
Roles and access for each modeling task
Check your role before you start each task, because the requirements differ between tasks.
- Create an OT system service: admin
- Add an OT device to an OT system service: admin
- Map an OT system service to an equipment model entity: admin
- View the dependency map for an OT system service: cmdb_ot_editor
The dependency map uses a different role from the rest of the modeling work. A user who can create and map services may still need the cmdb_ot_editor role to review them. For the wider work, see the common service data model implementation roadmap.
Creating the OT system service record
You can create an OT system service from two places: the OT Systems list in the ServiceNow AI Platform, or the OT Systems list in the Industrial Workspace. Both paths use the same form fields.
Creating from the ServiceNow AI Platform
- Navigate to All > Operational Technology (OT) > OT Systems.
- Select New.
- Fill in the form fields listed below.
- Select Submit.
Creating from the Industrial Workspace
- Navigate to All > Industrial Workspace.
- Select the List icon.
- Under the Operational Technology (OT) module, select the OT Systems list.
- Select New.
- Fill in the form fields listed below.
- Select Save.
Form fields to complete
- Display name: populates the display name of the OT system service.
- Name: the host name of the OT system service.
- ISA entity site: the ISA entity site that the OT system service belongs to.
- Manufacturer: the name of the manufacturer of the service.
- Model number: the manufacturer’s model number for the service.
- Short description: a brief description of the service.
- Owned by: the name of the primary owner.
- Managed by: the name of the primary manager.
- Business criticality: how critical or important the system service is. The examples are High or Most critical, Medium or somewhat critical, Low or Less critical, and None or not critical.
- Support Group: the name of the primary support group.
- Managed By Group: the name of the group that manages the service.
- Operational status: the status of the system service.
Adding OT devices to the service
Adding devices is the step that connects the service record to the equipment that makes it up. The steps below run from the Industrial Workspace.
- Navigate to All > Industrial Workspace.
- Select the List icon.
- Under the Operational Technology (OT) module, select the OT Systems list.
- Select the OT system service you want to add a device to.
- In the Related Records tab, select the Associated OT Devices related record.
- Select Add.
- Select the check box next to one or more OT devices.
- After you choose all the OT devices, select Add.
Adding devices creates two relationships. The first is Depends on::Used by between the selected configuration item (CI) and the OT system service. The second is Managed by::Manages between the OT system service and the equipment model entity of that CI. These two relationships define the structure you review later.
A practical order follows the component groups above: operator stations and servers first, then controllers and I/O modules, then field devices. After the last device is added, open the Associated OT Devices related record again and check that every device you planned is listed.
Mapping the service to ISA equipment model entities
The mapping step ties the OT system service to an ISA equipment model entity. It runs as a scheduled job. When the relationship between an OT device and an equipment model entity changes, the job recomputes the relationship between the OT system service and the equipment model entity. For the governance side of mapping work, see the service mapping governance model.
Enabling the job requires the admin role.
- Navigate to All > System Definition > Scheduled Jobs.
- Select the Show/hide filter icon, then add a filter where Name is Map OT Systems to ISA Entities.
- Select the Map OT Systems to ISA Entities scheduled job record.
- Select the check box next to the Active field.
- In the Run field, select the option that best fits your needs.
- Select Update.
Choose the Run setting based on how often your device and entity relationships change on your instance. Confirm that the job is active before you rely on the dependency map.
Reviewing the dependency map
The dependency map shows the graphical representation of the hierarchical structure of the selected OT system service. It also shows the service’s relationship with other entities in the production process. Use it as the final check on the model.
You can open the map from two places.
From the ServiceNow AI Platform
- Navigate to All > Operational Technology (OT) > OT Systems.
- Select the OT system service record you want to review.
- Select View OT Dependency map.
From the Industrial Workspace
- Navigate to All > Industrial Workspace.
- Select the List icon.
- Under the Operational Technology (OT) module, select the OT Systems list.
- Select the OT system service record you want to review.
- Select View OT Dependency map.
A review order that catches gaps
Work through the record in this order: confirm the service fields, confirm the devices in the Associated OT Devices related record, confirm the mapping job is active, and then open the dependency map. If a step fails, fix it before you move to the next one. For help planning this work, see ServiceNow implementation.
Release differences and checks
The procedures on this page reflect the Brazil release. The overview wording is the same across the Australia, Zurich, Yokohama and Xanadu releases. Verify menu paths, field labels and role requirements on your instance before you follow the steps, since the release you run may show them differently.
Questions about modeling OT system services
Can an OT system service model something other than a DCS?
Yes. The categories listed above include SCADA, ICS, SIS, MES, process control systems, transportation management systems, energy management systems and BMS. The modeling steps on this page are written around control systems, so confirm that a category fits your model before you create its record.
Which fields should I complete first?
Required fields are not marked in this guide, so check the form on your instance for mandatory fields. Owned by, Managed by, Support Group and Managed By Group tell the next person who to contact, so complete them before you add any devices.
What should I check if a device does not appear in the model?
Start with the Associated OT Devices related record on the service, because that is where devices are added. Confirm the device is listed there, then check that the relationships described above exist. If the device is still missing, write down the service name, the device name and the step where the problem appeared before you escalate it. For mistakes to avoid when maintaining records like these, see the common data model mistakes guide.
Are the form fields the same in the Industrial Workspace?
Yes. The field tables for creating an OT system service match in both locations. Only the navigation path and the final button differ, with Submit on the AI Platform and Save in the Industrial Workspace.