Use the ISA-95 equipment model

The ISA-95 equipment model is an industry standard for describing an industrial facility and the production equipment in it. In ServiceNow, you apply an ISA-95 template in Industrial Process Manager to build a hierarchy from the site down through areas, work centers and work units.

What the ISA-95 equipment model is used for

The model answers a question that operational technology teams ask often: where does a piece of equipment sit, and what is it part of? A car plant might have a welding cell inside a body shop, the body shop inside a production line, and a paint storage room feeding that line. Each item becomes an equipment model entity, and the hierarchy records how they nest.

The template supports three jobs. You map entities into one hierarchical structure, create a separate equipment model for each industrial site, and assign users to individual sites so each team sees its own location’s data.

Entities are stored as records in the Equipment Model Entity table, cmdb_ci_ot_isa_entity. If you are deciding how these records relate to the rest of your configuration data, read the plain language guide to the Common Service Data Model before you settle on a naming scheme.

The four hierarchy levels

Each level sits beneath the one above it, so build the tree from the top down, starting with the site.

  1. Site. A physical facility or plant. Each model starts here.
  2. Area. A sub-facility or department inside a site. The standard template places a door assembly area directly beneath the site, with its own work centers and work units under it.
  3. Work Center. A section within an area that brings together people, machinery and equipment. This is the first level where you choose a type.
  4. Work Unit. A specific unit or section within a work center. It is the finest-grained level and also carries a type.

Work center types

Work centers offer four types. Choose the type that matches what the section does on the production floor, not what the room is called.

  • Process Cell. A cell that runs one stage of production, with the controllers, sensors and actuators that automate it. Its data supports control, quality monitoring and diagnostics. Example: a robotic welding cell in an automotive factory.
  • Production Unit. A group of process cells that perform related operations, coordinating their activity and the flow of material and data between them. Example: a car plant unit grouping welding, painting, assembly and packaging cells.
  • Production Line. A sequence of cells or units that takes a product from start to finish, with monitoring across the full run. Example: an assembly line that turns parts into a vehicle.
  • Storage Zone. An area for raw materials, work-in-progress or finished goods. Inventory management systems keep material flow and availability current for it.

Work unit types

Australia and Brazil list three type options for the Work Unit level.

  • Unit. A generic designation for operational purposes.
  • Work Cell. A bounded space where grouped machines and resources cooperate on one task or process.
  • Storage Unit. A space or structure for keeping specific equipment, materials or products. Example: a car plant keeping paint, electrical accessories and raw steel.

Yokohama and Xanadu list just the four work center types. On those releases, check the type list on your instance before you assign work unit types.

Plan the model before you enter data

These planning steps are practitioner guidance rather than product steps. Settling the levels first avoids correcting a wrong level after entries already exist.

  1. List each site the model must cover. Each site becomes its own equipment model, so settle the boundaries first.
  2. Sketch each site’s areas from the top down, using the names on the plant’s own drawings.
  3. For each section, decide whether it is a process cell, production unit, production line or storage space. A raw material bay usually fits a storage type.
  4. Note sections that hold groups of machines sharing one task, since they are candidates for work cells.
  5. Name the people who need to see each site and what they must do there. You need that list when you set site access.
  6. Decide which equipment needs maintenance schedules. Attach each schedule to an entity once that entity record exists.

For help planning this work, see ServiceNow implementation.

Create the equipment model template

Creating the template requires the cmdb_ot_isa_admin role. Levels and level types are added to the template after you create it.

  1. Navigate to All, then Industrial Workspace Admin, then Industrial Process Manager, then Equipment Model Template.
  2. Select New.
  3. Enter a Name and a Description.
  4. Check the Application field. It shows the selected application scope, and it reads Global when the template is in the global scope.
  5. Select Submit.

Next, create the sorting levels for the template and add the level types each level needs. Installing Industrial Process Manager also delivers a default ISA-95 template to use as a reference.

Give non-administrator users access to a site

Site access is set with user criteria records, which you attach to a site. The criteria determine which users match. The access level on the site sets what they can do: Can Read lets them view entities for that site, and Can Edit lets them change those entities.

Creating a user criteria record requires the admin role. Follow these steps:

  1. Navigate to All, then Knowledge, then Administration, then User Criteria.
  2. Select New.
  3. Fill in the name, a short description, and the users, groups, roles, companies, locations or departments that should match. Turn on Match All if every condition must be met.
  4. Assign the user criteria to the site for Can Read access. For users who change entities, assign it again for Can Edit access.

For OT device access on the same sites, assign the OT roles to the users or their groups. The Operational Technology Manager role steps are covered separately.

Two version notes apply. User criteria configurations are not available with ISA Equipment Model version 4.2.0. Users upgrading to version 1.0.12 have their site access migrated to user criteria and groups, so check those assignments after the upgrade.

Review a site hierarchy in Equipment Model Manager

View hierarchy requires the cmdb_ot_isa_editor or cmdb_ot_isa_admin role. The graphic shows the selected entity as the parent.

  1. Navigate to All, then Industrial Workspace Admin, then Industrial Process Manager, then Equipment Model Manager.
  2. In the Equipment model view for field, select the site.
  3. In the selector pane, select the entity. Select the top-level site entity to see the whole site.
  4. Select View hierarchy.

The manager also lets you view upstream and downstream production processes, review child entities, and add child entities to your favorites. When the graphic loads, check that each area sits under the correct site, each work center under the correct area, and no section appears twice. A mismatch usually means a parent was chosen in the wrong order, so correct the parent before adjusting anything below it.

Schedule maintenance against equipment model entities

Creating a schedule requires the sn_isa_schedule_admin role. The Equipment Model Downtime Planner role (sn_isa_schedule_admin) also lets you add, modify and delete schedule entries.

  1. Navigate to All, then Industrial Workspace Admin, then Industrial Process Manager, then Equipment Model Entity Schedules.
  2. Select New.
  3. Enter a unique Name, choose a Time zone, enter a Type as a text label for the purpose, and add a Description.
  4. Select Submit.
  5. On the saved schedule, open the Schedule Entries related link and add entries. One schedule can carry several entries, each for its own maintenance task.
  6. To detach a schedule from an entity, use the Schedules related link in the equipment model record.

A child schedule passes changes to its parent. Extending the time on one day, or removing holidays from the child calendar, also applies to the parent. View schedules in the Equipment Model Manager or the Planned Downtime module, and pick a time slot from a schedule when you work an OT incident or remediation task.

Checks to run before you rely on the model

Run these checks after the first build and after each structural change:

  • Open View hierarchy for each site and compare the levels with your sketch.
  • Check that each work unit has a type and that work center types match the floor.
  • Sign in as a non-administrator user with the access you configured, and confirm the site list. If a site is missing, check its user criteria assignment first.
  • Confirm each schedule’s time zone and type before you attach it to an entity.

If the tree is complete for an administrator but blank for a user, the cause is usually access rather than the model. After launch, who maintains equipment data is a governance decision. The discovery governance model and the service mapping governance model are worth reading when you assign those owners.

Questions about schedule time zones, admin visibility and site access

What does a Floating time zone do for a schedule?

A floating schedule is not tied to one time zone. Its times stay fixed on the clock, so 8:00 to 17:00 reads the same for all users. Choose a named time zone when the schedule belongs to one plant.

Can an administrator see equipment for all sites?

Yes. A user with the cmdb_ot_isa_admin role can view equipment model entities for any site.

Can I link OT devices to an entity from the Equipment Model Manager?

Yes. The Equipment Model Manager lets you review or associate additional OT devices with the selected entity. Use it when a device belongs to a section that already exists in the tree.

Why can a user with the editor role not see a site?

Users with the cmdb_ot_isa_editor or cmdb_ot_isa_viewer role can access only the sites an administrator has granted them. Check that a matching user criteria record is assigned to the site with Can Read access. A user who can open a site but cannot change its entities is usually missing the Can Edit assignment.