A compensating control is a protective measure you apply to an Operational Technology (OT) asset while one of its vulnerabilities stays open. To create one, open the Compensating Controls list in the Industrial Workspace, select New, enter a Name and Description, mark the control Active, and select Save. Use the sn_vul.vulnerability_admin or sn_vul.vulnerability_analyst role.
Why OT teams rely on compensating controls
Many OT assets run a production process, so they cannot be stopped whenever a vendor publishes a fix. A controller, an operator panel or a supervisory server may have to stay in service while a known weakness remains open. A compensating control narrows the route to that weakness or limits the damage if someone uses it. It stays in place until a permanent fix, such as a patch or a hardware replacement, can be scheduled.
Each scenario pairs a threat with measures that reduce exposure while the weakness stays open.
- Unauthorized access to programmable logic controllers (PLCs): filter traffic to the controller with network-level access lists, close ports and services the controller does not use, and tighten its login and password rules.
- Buffer overflow in human machine interface (HMI) panels: install the firmware the panel manufacturer has issued, enable a hardware watchdog timer for fail-safe operation, and add boundary checks in the application code.
- Man-in-the-middle attacks on PROFINET: encrypt the traffic through a VPN or IPsec, configure PROFINET with secure certificates, and segment the network with firewalls.
- Denial of service on SCADA systems: rate-limit critical OT network components, configure SCADA systems for redundancy and load balancing, and apply the security patches the vendor provides.
- Malware on engineering workstations: keep anti-malware software from the manufacturer’s recommended list installed and current, allow only approved applications to run, and control what can be connected through removable media.
Install the OT Vulnerability Response application first
The controls and dashboards described here sit inside the Operational Technology Vulnerability Response application. Install it from an account with the admin role, and check three things before you start.
- Entitlements: the application and its ServiceNow Store dependencies need valid entitlements. The installer prompts you with links to the ServiceNow Store when a dependency needs an additional entitlement.
- Plugins: activate Vulnerability Response (sn_vul), Industrial Process Manager (sn_otsm) and Operational Technology Manager before you install. Industrial Process Manager creates the ISA-95 Equipment Model data foundation that the ServiceNow Industrial solution requires. Operational Technology Manager supports the CMDB, Service Graph Connectors and Discovery.
- Demo data: optional. Load it on a development or test instance.
To install, go to All > System Applications > All Available Applications > All, and find the application by its name or ID. Select a version and select Install. The Review Installation Details dialog box lists any dependencies that install with it. If you are rolling this out across several sites, plan the sequence with an implementation roadmap for operational metrics. For help planning this work, see ServiceNow implementation.
Assign roles to each task
Grant access by task.
- Install the application: admin role.
- Create or edit compensating controls on the Compensating Controls list: sn_vul.vulnerability_admin or sn_vul.vulnerability_analyst.
- Create remediation tasks and schedule existing remediation tasks for vulnerable items: sn_otvr.remediation_owner, the OT Vulnerability Remediation Owner role.
- Open the Operational Technology Vulnerability Response (PA) dashboard: sn_otvr.remediation_owner.
- Use the site filter on the dashboard: cmdb_ot_isa_viewer, with access to the site you want to view.
- View integration records: sn_otvr.integration_viewer (OT VR Integration Viewer). Edit them: sn_otvr.integration_admin (OT VR Integration Admin).
- Configure assignment rules: sn_sec_wf.manage_admin_rules.
Give each user only the roles their task needs. The remediation owner role lets someone create and schedule remediation tasks, while the integration viewer role only lets them view integration records.
Route OT vulnerable items to the right assignment group
Vulnerable items are assigned to groups when they are imported, according to vulnerability assignment rules. The application ships with one OT rule, the Operational Technology (OT) assignment rule. It sends each OT vulnerable item to the OT VR assignment group for the item’s site. An item with no site, or with a site that has no group specified, goes to the OT VR Default Assignment Group.
The execution order of that rule sets your strategy. If all OT vulnerable items should go to their site first, set the rule’s execution order lower than every other rule. If you assign by class first and send the remaining items to sites, set it higher than all class-based rules. After you set the order, change the OT VR Assignment Rule Active state to true.
To open the rule, go to All > Industrial Workspace > Guided Setup > Operational Technology Vulnerability Response > Assignment Rules > Configure. You can also go to Workspaces > Security Exposure Management > Administration > Assignment, then select Operational Technology (OT) assignment rule in the Assignment list.
Review vulnerable item fields before you choose a control
A control should match what the vulnerable item says about the asset. Open the item and check these fields.
- State: defaults to Open. You can change it to Under Investigation when the item is ready for immediate remediation.
- Risk rating: Critical, High, Medium, Low or None, taken from the quantified risk score. The base rating on a vulnerable item is separate from the Risk rating on the solution record, so do not compare the two directly.
- Exploit exists: shows Yes when at least one exploit is associated with the item’s vulnerabilities.
- Exploit attack vector and Exploit skill level: show the most exposed attack vector among the associated exploits and the lowest skill level needed to use them.
- Configuration item: the OT asset the item belongs to. Assignment group and Assigned to show who works on it.
- Threat and Remediation notes: pulled from the vulnerable entry record. A change you make to Threat also updates that record, so edit it with care.
Select the Additional comments check box on the item to add relevant information, such as the name of the compensating control that covers it. Doing so lets the next reviewer see the link without reopening the control.
Track controls and remediation on the OT dashboard
The Operational Technology Vulnerability Response (PA) dashboard shows the volume, performance and progress of OT vulnerable items, from detection through containment or remediation. Go to All > Industrial Workspace, select the Dashboard Library icon in the navigation panel, then select Operational Technology Vulnerability Response. Filter by assignment group, exploits, risk rating or state to narrow the view to the affected services. For the measures behind these reports, see the operational metrics that matter.
The dashboard has three tabs.
- Vulnerable Items covers risk and prevalence, affected devices, remediation target adherence and progress. Its reports include OT Vulnerable Items by State, OT Vulnerable Items by Risk Rating, OT VIs Met Remediation Target and OT Overdue Critical Vulnerable Items by Assignment Group.
- Remediation tracks the progress of remediation actions and shows which support teams need the most help. Its reports include OT Remediation Tasks, OT Critical Remediation Tasks Near Due and OT Unassigned Remediation Tasks.
- Exception shows where the organization carries risk from deferrals, through OT Deferred Vulnerable Items by Reason and OT Exceptions for Critical Vulnerable Items by Assignment Group.
When a compensating control stands in for a patch, the Exception tab shows where deferrals are concentrated, broken down by deferral reason and by assignment group.
Troubleshoot the setup and confirm results
Work through these checks when a control, an assignment or a dashboard report does not look right.
- Confirm that the required plugins were active before the install. The installation lists plugins and store applications as dependencies, so a missing one is the first thing to check.
- Match the failing step to its role in the list above.
- If a control does not appear where you expect, open the Compensating Controls list and check the Active box. If Active is not selected, the control is not activated.
- If items land in the OT VR Default Assignment Group instead of a site group, check whether the item has a site and whether that site has a group specified.
- If the assignment rule does not act, compare its execution order with your strategy and confirm that its Active state is true.
The compensating control steps are the same in the Yokohama, Zurich, Australia and Brazil releases. For more on mistakes that show up in metrics setups, see common mistakes in operational metrics setups.
Questions about reading OT vulnerability data
Are the Remediation and Exception tab reports real time?
Yes. The Remediation and Exception tabs show their reports in real time. The Met Remediation Target and Mean Time to Remediate reports on the Vulnerable Items tab let you view data for the last month, 3 months, 6 months, year or all time.
What should I change when an indicator source holds more than a million records?
Open the indicator source under Performance Analytics > Indicators > Automated Indicators, filtered to the Operational Technology Vulnerability Response application. In the Records collection section, select Override record collection and enter a maximum number of fetched records above the default of 1 million. The override helps avoid performance problems when the Industrial Workspace collects data.
What do the Last opened and Updated fields show on a vulnerable item?
Last opened starts out as the creation date. If the item is closed and then reopened, Last opened shows the date and time it was reopened. Updated shows the date of the last scan.
Can I add notes to a deferred vulnerable item?
Yes, starting with Vulnerability Response v20.0. Add work notes in the Notes section of a deferred vulnerable item.