OBLYTECH Logo
OBLYTECH Logo

ServiceNow Release Calendar 2025 to 2027: GA Dates and Support

Brazil is the family ServiceNow currently offers as generally available, as of November 26, 2026. Its general availability date was November 5, 2026, when it shipped as Patch 2. Australia is the previous family and Zurich is now older than both. This page covers the dates that matter for planning and the 2027 families still awaiting confirmed dates.

How to read the dates in this calendar

A release calendar is only useful to an upgrade planner if it shows how sure each date is. This one uses three labels. Confirmed means a ServiceNow source states the milestone, and only confirmed dates belong in a planning document. Tentative means the date comes from planning material that no official statement has matched yet, so it can move. Not verified means no defensible day or month exists, and the row says so rather than leaving a blank that looks like an oversight.

General availability is the date this calendar treats as a family’s public release, and it is the date the support rule works from. Early availability is a separate, earlier milestone. This page does not plan from early availability dates, because the support rule works from general availability dates. A patch number is not a family date, and neither is the publication date of a documentation page. The research cut-off for every date here is November 26, 2026.

For how family names map to version numbers, read the guide to ServiceNow release versions before comparing dates against an instance.

General availability and support status by family

The families below run from the current release down to the 2027 windows. Each line gives the general availability date and the label that applies to it.

  • Brazil: general availability November 5, 2026, as Patch 2. Confirmed. This is the current family as of November 26, 2026.
  • Australia: general availability May 5, 2026, as Patch 2. Confirmed. This is the previous family as of November 26, 2026.
  • Zurich: general availability September 10, 2025. Confirmed. It is older than both the current and previous families, so it sits outside the supported pair.
  • Yokohama: outside the supported pair since May 5, 2026, the date Australia became generally available. This row shows the support boundary rather than launch dates, because the boundary is what affects planning now.
  • Canada: general availability tentatively in the first half of 2027. Tentative. Unofficial planning material points to May 2027, but no authoritative general availability date has been verified.
  • Denmark: general availability tentatively in the second half of 2027. Tentative. Early and general availability dates have not been verified, and no day or month is published.

Brazil, Australia and Zurich: what the record covers

Brazil holds the current position, so its record deserves the most care. General availability arrived on November 5, 2026, packaged as Patch 2. Documentation for available versions was updated on November 25, 2026 and lists Patch 2m and the hotfixes after it. That confirms Brazil has moved past early availability. It does not tell a customer which patch its own instance can take, so target selection still depends on the patch offered to that instance. Older listings can carry stale status, so check the date of any source before using it for planning.

Australia’s general availability on May 5, 2026 made it the previous family. It matters because the support rule works from the two most recent general availability dates. Any instance still on Zurich or older is therefore measured against Australia and Brazil, and that comparison moves again when Canada becomes generally available.

Zurich reached general availability on September 10, 2025 and is now older than both the current and previous families. That changes its status from a planning target to a family that needs to move off. Zurich also carries changes that a date table cannot show. The conditional authentication-policy fix applies when authentication policies were disabled but pre-authentication and post-authentication contexts still existed. The documented fix can enable policies, change context associations and schedule deletion of enrollment data. Production and sub-production instances may behave differently because they start from different configurations, so capture the authentication setup before any upgrade step. The detail is set out in what changed in the Zurich release and what it means for upgrades.

Canada and Denmark: why their release windows are still open

The next family in the planning material reviewed is Canada. Its general availability is tentatively placed in the first half of 2027, and unofficial planning material points to May 2027. Neither is an official release commitment, so the calendar shows a window rather than a day.

Denmark follows Canada in the same material, with a window in the second half of 2027. Exact early and general availability dates have not been verified. Publishing a guessed day or month would create a commitment that no source supports, so the row stays open until an official statement arrives.

The open dates still matter. Canada’s general availability would start another support transition for Australia under the same rule, so the Canada window is a planning trigger even though its day is unknown. The planned approach is one 2027 release watch view covering both families, with separate launch pages only once official documentation supports them.

How the support rule turns release dates into deadlines

Release dates and support boundaries answer different questions, so this calendar keeps them apart. A family becomes unsupported once it is older than the current family and the one before it. Applied to the general availability dates above, the rule places Yokohama outside support from May 5, 2026 and Zurich from November 5, 2026. Australia’s boundary depends on when Canada becomes generally available, so it stays open.

As of November 2026, an unsupported instance no longer receives patches or hotfixes, SLA coverage or service credits, or coverage for security or functional defects. The end-of-life upgrade program, last updated October 5, 2026, sends 90-, 60- and 30-day notices. Within a defined window a customer may pick a new date, but opting out is not an option. The date that binds a particular customer comes from that customer’s own maintenance record, not from a public calendar.

A row changes in three situations. An official statement confirms a milestone and replaces a tentative window. A patch becomes available and updates the patch detail for that family without moving its general availability date. A support rule or end-of-life notice is published and updates the boundary. Each change carries its source and check date, so readers can see what moved and when.

Turning these dates into work is covered in the upgrade readiness section, and the order of those tasks is set out in an upgrade readiness implementation roadmap. If you want help turning these dates into a dated upgrade plan for a specific instance, see ServiceNow platform upgrade services.

Frequently asked questions about the ServiceNow release calendar

What is the latest ServiceNow release as of November 26, 2026?

Brazil is the current generally available family. The family went generally available on November 5, 2026, in the form of Patch 2. Australia is the previous family, and Zurich is older than both. Choose a target from the patch offered to your own instance rather than from the family name alone.

Is Canada’s release date confirmed?

No. Canada’s general availability is tentatively in the first half of 2027, and unofficial planning material points to May 2027. No authoritative general availability date has been verified, so the entry remains a window rather than a day. The row will change once an official statement confirms the milestone.

When does Yokohama fall out of support under this calendar?

Yokohama sits outside the supported pair from May 5, 2026, when Australia became generally available. That boundary is derived from the support rule and the general availability dates, not from a separate end-of-life notice. Some third-party calendars give a Q4 2026 end date for Yokohama, and that does not reconcile with the rule. The customer’s own entitlement record governs the date that applies to that customer.

Does a general availability date mean my instance has to upgrade?

Not by itself. A general availability date starts the support clock for older families under the policy, but the mandatory upgrade date for a specific instance comes from its end-of-life record. Check that record before committing to a date, and treat the public calendar as the planning input rather than the final deadline.

Why keep support boundaries apart from release dates?

Release dates show when a family was offered, and support boundaries show when it stops receiving fixes. A release date prompts testing, while a boundary prompts a dated move. Separate fields stop a general availability date from being read as a deadline.