Yokohama reached general availability on March 12, 2025, and as of November 2026 it sits outside the current-and-previous support window. An instance still running it is past the normal support boundary. This page covers the dates, the support position, the changes that carry forward and what to plan before choosing a target. It does not list the feature set.
Yokohama reached general availability in March 2025
Yokohama had two milestones. Early availability came on January 30, 2025, and general availability on March 12, 2025. The support position is derived from the general availability date, so record both dates in separate fields in an instance inventory and use the later one when you place the family in sequence.
That sequence is what makes the date useful. Zurich’s general availability fell on September 10, 2025, with Australia coming after it on May 5, 2026. As of November 2026 the newest entry in that run is Brazil, whose general availability date is November 5, 2026. Each new arrival moves the window, so a single family date tells you little on its own. If the naming is new to you, how ServiceNow release families are named and dated explains the pattern before you apply these dates.
Why Yokohama falls outside the support window now
The support test is short. Under the support rule, a family falls outside the window once it trails both the current release and the one directly before it. As of November 2026 the current family is Brazil and the one before it is Australia, so Yokohama is older than both. Australia’s May 5, 2026 general availability date is the event that pushed Yokohama past that line.
This position is worked out from general availability dates and the support rule. It is not a separate end-of-life notice written for Yokohama, and this page has not found one. Treat it as a planning position. It becomes a hard deadline only when the instance’s own end-of-life records say so, because those records are what schedule a mandatory upgrade for a specific customer.
Being outside the window carries real consequences. An unsupported family receives no patches or hotfixes, carries no SLA coverage or service credits, and has no coverage for security or functional defects. It may also be pushed into an emergency upgrade. Those points are the reason to settle the date early instead of waiting for a notice to arrive.
Third-party calendars place the end date elsewhere
As of November 2026, some third-party release calendars place the close of Yokohama support in the fourth quarter of 2026. That date does not match the rule above. One such calendar also lists Zurich as supported, and under the current-and-previous rule Zurich is outside the window as of November 2026. A calendar that treats Zurich as supported is not applying the same test, so its Yokohama date deserves caution.
Keep both dates on record rather than choosing the one that looks more comfortable. For each one, note the source, the date you checked it and which test it used. When the conflict stays open, the customer’s own end-of-life records and entitlement details decide the next step.
Yokohama changes that carry into later families
Some Yokohama-era decisions carry into later families. Edge Encryption is the clearest case. A knowledge record dated November 21, 2025 restricts renewals that run from Yokohama and plans end-of-life for December 2028. These are two different milestones. The renewal restriction affects the next renewal decision, while the end-of-life date still needs its own plan.
Platform Analytics shows the same pattern in a later family. In the Australia family it is enabled by default on upgrade, and a clarification dated September 2026 separates the new-content experience from the optional migration of existing reporting content. Do not read enabled by default as meaning every older report has been moved across.
Local configuration is often where carry-forward work sits, because an upgrade may not carry it over cleanly. Skipped records are easy to miss: the upgrade completes, and the gap appears later, in testing or in a user’s workflow. The review steps are covered in how to work through skipped records after an upgrade. Read them before the test plan is drafted rather than after it.
Yokohama release changes to plan for
Not every change in a family upgrade is a deadline, and treating them all alike wastes planning time. Sort each item into one of four categories before you schedule the work.
- Mandatory: the change applies to the instance whatever the team decides.
- Default-on: the change is active after the upgrade unless someone switches it off.
- Optional: the change is available but needs a deliberate decision before anyone uses it.
- Entitlement-dependent: the change applies only where the customer holds the relevant product or subscription.
Patching runs on a separate clock from the family move. Commercial customers on supported families move to “m” patches as their quarterly target from January 2027, as recorded in a patching FAQ dated November 16, 2026. Plan that as its own track so it does not get folded into the upgrade project and lost when the project slips.
Legacy workflows show why the categories matter. A knowledge record dated April 30, 2026 covers the Zurich upgrade’s effect on existing custom legacy workflows: they are not affected, and existing customers keep their editing and creation capability. A team that reads this as a rule to migrate every legacy workflow before moving may be doing work the record does not require. Legacy plugins need their own check on the same list, covered in legacy plugin activation checks.
When a skipped change needs a decision rather than a reset, how to merge skipped changes by hand covers the manual route. Use it alongside the skipped-records review, not in place of it.
Choosing a target family after Yokohama
Pick the target family on three tests: whether it will still sit inside the window on the date you expect to finish, what its general availability date is, and which changes you inherit from every family between your current release and the target. A target that is current when the project starts can be on its way out when the project finishes, because each new general availability date moves the window.
The Zurich changes are covered in what changed in the Zurich family. Read them next to the later family changes you have already documented.
Sequencing matters as much as the target. A move onto the family that is current on your project date usually leaves the most runway before the next one, though that is a judgment about planning room rather than a rule. Map the sequence before you fix the date, not after.
Frequently asked questions about Yokohama upgrades
Does being outside the window mean I must upgrade this month?
Not necessarily. Outside the window raises the risk of an unplanned move, but the timing of a mandatory upgrade comes from the end-of-life record attached to your instance. Check that record first, then set the date.
Why do some Community posts give the wrong release dates?
Community answers can lag behind the release notes. A Community answer dated February 25, 2026 still described Zurich as an expected Q4 2025 release, although Zurich had reached general availability on September 10, 2025. Take general availability dates from the release notes and record the date you checked them.
Is the Edge Encryption date a shutdown for every Yokohama instance?
No. The renewal restriction and the planned end-of-life belong to Edge Encryption, so an instance that does not use that product does not inherit the timeline. Confirm whether the product is in use before you add the milestone to a plan.
How often should a team plan a family upgrade?
As of November 2026, moving to the latest family can keep an instance on an approximately annual cadence, but it does not mean every family release has to be implemented. Treat that as a planning cadence rather than a fixed calendar, since timing depends on general availability dates and the family your instance starts from. A yearly review of family position is a practical habit even when no deadline is close.
Which Yokohama changes are mandatory after a move?
The answer depends on the item rather than the family. On hosted instances the customer usually cannot decline patches, and an end-of-life upgrade is required, though the program’s rules control when it can be moved. Sort each change into its category before the test plan is written, so the plan reflects the choices that are still open. If you want help sequencing the upgrade, see ServiceNow platform upgrade support.