Before you turn on a plugin in ServiceNow, name the exact plugin, check whether it is already active, and review the dependencies it will activate. For legacy instances, also check data prerequisites, installer validation, licensing, and demo data choices. Test the proposed activation in a nonproduction instance before you approve the production change.
Build the plugin activation ServiceNow change record
A legacy request may name a feature that is already there, a retired navigation experience, or a plugin that came with a larger application. Start with the business goal. Then record the plugin name and ID that support it. Treat the name in an old change ticket as a lead to investigate rather than an installation instruction.
Check the activation status on the target instance before requesting or activating a plugin. Compare the intended outcome with what users can already do. An active plugin with an unresolved configuration problem needs a different investigation from a missing plugin. Record the current state so the approval describes the change you actually intend to make.
The details below reflect Brazil behavior. Check them against your instance and release. Keep a short record that lists:
- The requested capability and the business owner who will accept it.
- The plugin name, ID, current activation state, and target instance.
- Required plugins, parts that turn on by themselves, and validation conditions.
- The test evidence, demo data decision, and production acceptance criteria.
This keeps a request to enable software apart from a request to prove that a workflow works. For requests about employee ordering, use a Service Catalog health check to shape the workflow checks that should follow the install.
Review dependencies as part of the approval
Do not limit the change to the chosen plugin. A dependency can bring in another part that needs its own review. Tell apart three groups: needs that must be met, related plugins that turn on during the install, and optional sample data. Each group calls for different prep work.
SCCM brings integration dependencies
To turn on a supported Microsoft SCCM plugin, you need the admin role. Integration – JDBC and CI Identification are dependencies, and SCCM turns them on automatically. Put both in the change record, even when the first request names only SCCM. Check their current state before you test, so the comparison shows what the install added.
Make the test result fit the integration that was requested. An installation completion message is evidence of installation, while a successful business test requires separately agreed acceptance criteria. Give someone the job of reviewing the integration results and the identification results. Do not close the change as soon as the plugin is available.
Remote Tables includes Transformation Service
Remote Tables needs the admin role. The plugin ID is com.glide.script.vtable, and its related parts include Transformation Service, com.glide.transform. Related plugins activate if they are not already active. Remote Tables supports script definitions that fetch and, if you choose, cache outside data. Transformation Service supports the matching Transform APIs.
For this request, review the planned outside data access and the script definitions along with the dependency list. Put the owner of those definitions in the test plan. If not, the install may finish with nobody on the hook for whether the planned data fetch meets the business need.
Fiscal Calendar includes related plugins and demo data
Fiscal Calendar, com.snc.fiscal_calendar, needs the admin role. It includes demo data and turns on related plugins that are not already on. Do not translate that into an assumed dependency list. Record the actual related parts found for the planned change. Keep the demo data decision in view of the owner who is in charge of the calendar setup.
When calendar prep is part of a wider portfolio effort, a Strategic Portfolio Management health check can help shape the acceptance review around it. Keep the change record on which parts change and which calendar result the owner will check.
Check Knowledge Management legacy prerequisites
Knowledge Management Advanced needs more prep than a name search and an install. You need the admin role. The Knowledge Management Advanced Installer, com.snc.knowledge_advanced.installer, is what turns on Knowledge Management Advanced, com.snc.knowledge_advanced. Record the installer and the feature plugin apart, so the team knows which part runs the checks.
The installer looks for active Knowledge Management v2 knowledge bases and for a unique database index on the Number field. A unique constraint added to Number makes the install fail. Note these conditions before you schedule the install. If a unique index exists, pause the plan. Have the responsible team work out the fix and how it affects existing knowledge data.
Do not assume that turning on Knowledge Management v3 also turns on Knowledge Management Advanced. Advanced turns on by itself for new customers starting with Xanadu, but an older instance still needs its own check. The history of the instance matters more than an assumption based on what a newly provisioned environment contains.
Knowledge Management Service Portal, com.snc.knowledge_serviceportal, has its own set of dependencies: Knowledge Management V3, com.snc.knowledge3, and Service Portal for Enterprise Service Management, com.glide.service-portal.esm. It needs the admin role. Record both prerequisites when you weigh a legacy portal request. Check the requested experience before you approve more parts.
For help planning this work, see ServiceNow implementation.
Run a controlled installation and verify the result
Use a nonproduction rehearsal to make the dependency review easy to see. Record the starting states, install the approved plugin, then compare the new state with the list of parts you expected. Keep any surprise additions or unmet needs open for study before you make the production call. This is a recommended change process, not a substitute for the plugin-specific requirements.
For the actions here, the role needed is admin. Navigate to All > System Applications > All Available Applications > All, find the plugin by its name or ID, and select Install. A message appears when the install is done. Save the result with the change record and move on to the agreed functional checks.
If domain separation and delegated admin are on, the administrative user must be in the global domain. A user outside that domain can see an error that the install is unavailable and names another Plugin Activation operation. Check that domain condition before treating the message as evidence that a second administrator has started a competing installation.
For access changes, put the permission review next to the matching Zero Trust Access activation checks. The reviewer should know which access result is under test and who can approve it.
Before you hand the change to production support, name the person who will check the first business use. Include the expected result and where the test evidence will be kept. This gives support a concrete acceptance target if the install finishes but the original requester still reports a missing capability.
After the rehearsal, compare the expected and seen dependency states. Record the functional test result apart from the install result. If they differ, explain the gap before approval. An installed part, a finished setup, and a user who accepts the workflow are three separate steps in the change.
Resolve remaining legacy activation questions
What if the plugin cannot be found?
Search by both the plugin name and its ID before you change the request. A plugin that does not show up may need a request to ServiceNow staff. Keep the exact ID and the search result in the change record. Then the next person can study the same part and will not swap in a plugin with a similar name.
Does Advanced activation load knowledge demo data?
When the installer checks pass, Knowledge Management Advanced turns on without its demo data. Loading those examples is a separate action. On the Advanced plugin page, use Load Demo Data Only and then OK. Decide whether examples belong in the test environment before you take that action. Record the choice separately from feature activation.
Does Time Card Management activation grant dashboard usage?
Time Card Management, com.snc.time_card, also turns on Performance Analytics – Content Pack – Project Portfolio Suite Dashboards, com.snc.pa.time_card. To use those dashboards, you need a Performance Analytics license. Time Card Management can also be turned on through PPM Standard, com.snc.financial_planning_pmo, so check for that existing route before treating it as a new standalone installation.
Should a legacy database rotation request include default tables?
Do not turn on Database Rotations Default Tables, com.snc.db.rotation_default_tables. List the tables by hand after you talk to a ServiceNow representative. Database Rotations, com.snc.db.rotation, turns on Table Rotation and Table Extension without adding tables on its own. State the table list that you want. Do not assume the install sets it.
Can a portal request be satisfied without new activation?
Knowledge Management – Service Portal is on by default for customers on Madrid and later releases. Existing customers on earlier releases can turn it on if they need it. If an old request comes back during upgrade prep, first find out whether the capability is already there, and whether the work left is about the portal experience and not another install.
Which Australia and Brazil plugins switch on by themselves during an upgrade, and which ones still need a request, an install or a paid-package check?
In the Australia upgrade, ITSM Enhanced Security Features (com.snc.itsm.enhanced_security) turns on by itself, and Brazil’s unified Process Mining Content Pack installs automatically. Discovery, Recommended Actions for HRSD and the AI features still need a request, a Store install or a license check, depending on the plugin.
Plugins that turn on or migrate during the upgrade
- ITSM Enhanced Security Features. On Australia it turns on during the upgrade, where before this release activation happened only on new instances. It adds deny-unless-authenticated ACL rules to several ITSM tables, so put the access review on the upgrade plan before the change window.
- Unified Process Mining Content Pack (Brazil). The HRSD Process Mining Content Pack is deprecated and cannot be newly activated. The unified pack installs on its own, and existing configurations transfer across.
- Customer Service Management family plugins (Australia). Action Status, Case Digests, Document Templates and Major Issue Management migrate to Store apps automatically. As of November 2026, the old plugins are planned for deprecation in the C release, so treat this as a migration to verify.
Plugins that still need a request, an install or a license check
- Discovery (com.snc.discovery). Request and activate it first. The UDP scanning and operating-system guessing options are off by default and need MID Server properties. MID Server configuration can prefer PowerShell 7 for File-based Discovery and Windows ADME.
- Recommended Actions for HRSD (com.sn_hr_ra). Request it, then install it from the ServiceNow Store as a separate step. The release notes do not name the HRSD package it needs.
- AI features. Intelligent Approvals and AI Agent Advisor both sit under AI licensing, and the capabilities you get depend on your license. As of November 2026, Autonomous Workforce requires Australia Patch 3, and access is arranged through your account team.
Checks to run before you approve the upgrade
- Capture the activation status of each plugin above on the target instance before the upgrade window opens, and keep it with the approval.
- Test integrations that read ITSM tables after the upgrade, because the new ACL rules change who can read those tables.
- Ask the license owner which package covers each AI, HRSD and Customer Service capability, and get the answer in writing. As of November 2026, the release notes leave these packages unnamed.
What does not switch on by itself
Dynamic Identification and Reconciliation Engine is a separate case from the plugins above. New Brazil instances get it on by default. An upgraded instance that runs Static IRE keeps it unless someone chooses to switch, so record that choice as a decision in the change record, not as an upgrade side effect.