Reviewing Upgrade History in ServiceNow

Review ServiceNow upgrade history by selecting an upgrade, checking its version pair and timing, then separating applied changes from records that still need examination. The history record brings together change totals, access to skipped records, and the upgrade log after completion. Use those details to investigate a particular upgrade and record the reasoning behind each customization decision.

Identify the upgrade before interpreting its results

In Brazil, open All > Upgrade Center > Upgrade History. Selecting an entry opens the System Upgrades form. History includes earlier upgrades as well as the most recently completed one, so a review does not have to begin with the latest event. Choose the entry that matches the investigation.

The From and To fields identify the .war versions on either side of the upgrade: From holds the previous version, while To holds the version applied. Upgrade started and Upgrade finished give the corresponding start and completion timestamps. These fields establish which upgrade the figures below describe.

As a review practice, record the version pair beside any observation you take from the form. If a colleague later examines another history entry, the distinction remains visible. Keep the timing with the versions when investigating an issue reported around the upgrade window; timing alone does not establish what caused the issue.

The guide to upgrades and release readiness places this inspection within the wider preparation and review process. This page concentrates on reading the historical record and following its evidence into skipped-task decisions.

Separate upgrade activity from remaining review work

Upgrade History Details contains four totals with different meanings. Changes processed combines Changes applied with Changes skipped. It therefore includes records for which the upgrade component was withheld as well as changes that were applied. Read the two contributing figures before deciding where to investigate.

Changes skipped covers records that differ from the previous upgrade but did not receive the upgrade component, most often because of customization. Changes applied includes updated records that differ, together with deleted and inserted records whose changed value is true. The applied total describes upgrade activity; it is not a count of completed reviewer decisions.

Copies to review draws attention to a separate issue: a copied record needs examination after its base record has been upgraded. A useful review practice is to keep that total distinct from skipped records in your notes. Combining both into an informal backlog figure would conceal which kind of record needs attention.

Before discussing completion with the team, take the actual applied and skipped totals from the selected record and keep them beside its version pair. As an organizing practice, allocate an investigator to each skipped task. Do not treat a large applied total as a substitute for examining the work represented by the skipped total.

Use the focused log after the upgrade completes

The log inspection procedure requires the admin role. Upgrade messages go into localhost_log and database-upgrade_<timestamp>.log when the upgrade begins. The former includes the broader log output; the latter isolates upgrade-related messages. For an investigation specifically about the upgrade, the focused file is a useful starting point.

After completion, the database-upgrade file is uploaded to the upgrade history table. To locate it through the log interface, open All > System Logs > Utilities and select Node Log File Download. Look for the database-upgrade filename. The extracted file is available through this procedure only after the upgrade has finished.

You can also return to Upgrade Center > Upgrade History, open the relevant upgrade, and inspect its attachment. The upgrade log is attached automatically when the controlling property permits it. Downloading the attached log provides a zipped copy, reducing the transfer time. These are two access routes to the upgrade log, rather than two separate investigations you must perform.

Check glide.db.upgrade.log.save_to_db.enabled if the expected file is missing. Its default is True, and the documented file appearance and attachment depend on that setting. Confirm the upgrade has completed as well. Neither an absent attachment nor a changed property, by itself, explains whether the upgrade’s record changes were correct.

As an investigation practice, write down the question before examining the log. Keep the relevant observation with the selected upgrade’s versions and the task that prompted it. Distinguish a message you actually found from a suspected explanation that still needs checking. This makes the evidence useful when the investigation moves to another reviewer.

Open skipped tasks to examine customization decisions

The Skipped Record VTB related link opens the visual task board for the selected upgrade. That link appears only when the version upgrade has skipped records. The board exposes resolution status for previous upgrades, and the history record’s related lists provide routes for handling and following skipped-record work.

Choose a task number on the board to open the Upgrade History Task form. Short description identifies the task, while Work notes holds task notes. Disposition is Skipped because this board concerns records that the system left unchanged to preserve customizations. This describes what happened during the upgrade; a reviewer still needs to consider the differences.

Type identifies the file category used to determine priority. UI pages and UI macros are examples in Priority 1, the highest group. Business Rules and Security ACLs fall in Priority 2; reports appear in Priority 3. Form Sections and Choice Sets appear in Priority 4, with other types in Priority 5, the lowest group.

Use those categories to understand the displayed priority. As a team practice, keep any separate business concern explicit in the notes rather than presenting it as the reason for the documented file-based ranking. A task’s priority and the explanation for your chosen resolution answer different questions.

Resolve Conflicts provides an action for examining differences and resolving conflicts. Revert to Base System provides an action for reverting customizations, while Update saves task changes. Review the differences before choosing an action. As a review practice, record which difference mattered, why the choice was made, and what behavior needs checking afterward.

For help planning this work, see ServiceNow implementation.

Read task states without assuming an automatic sequence

The State field distinguishes review status and resolution outcomes. Not reviewed and Reviewed indicate whether review has occurred. Merged identifies a combination of old and new changes. Retained identifies files keeping updates from the latest upgrade, while Reverted identifies a return to the base system. Read the state displayed on the task rather than assuming that every task follows one fixed progression.

For earlier decisions, inspect Old Resolution Details. It provides the prior task number, description, disposition, state, assigned user, and From and To versions. Those details connect a previous action to the file and version pair involved. They give historical context for the current decision without establishing that the same resolution remains appropriate.

The historical list uses outcome labels such as Reviewed and Merged, Reviewed and Retained, and Reviewed and Reverted. The current task form uses the shorter Merged, Retained, and Reverted labels. Preserve the wording you see when preparing review notes so a reader can tell which part of the record you examined.

Connect each resolution with a specific acceptance check

As a handover practice, organize the evidence around the decision: identify the upgrade and skipped task, describe the difference examined, and state the reason for the selected action. Include the relevant log observation only when it helps explain that decision. Mark an open question as investigated or still awaiting investigation, and give it an owner.

Use the testing and acceptance checklist to plan the behavior checks following a resolution. As a practical distinction, recording a task outcome and observing the resulting behavior are separate steps. State what was tested and what remains untested instead of relying on a short note that says only “reviewed.”

Where responsibility crosses teams, the upgrade roles and responsibilities guide helps frame the ownership discussion. Agree who investigates the difference, who chooses the resolution, and who accepts the observed result. Keep those assignments with the open questions so the next reviewer can continue from the evidence already collected.

Related links answer questions beyond individual skipped tasks

Can history show the upgrade plan configuration?

Yes. View Upgrade Plan History opens configuration details for the upgrade plan. Use that route when your question concerns the plan rather than a single skipped file. As a review practice, keep any configuration observation associated with the same upgrade identity used in your task notes.

Can I obtain a summary for an older upgrade?

Yes. View Upgrade Summary Report provides access to an older upgrade’s summary through Upgrade Monitor. It offers a broader historical view when a discussion concerns the upgrade as a whole. Individual skipped-task records remain the place to examine their states, notes, and earlier resolution details.

Can an instance jump straight to the latest family, and what must be reviewed first?

Yes, an instance can technically move straight to the latest family, but only after the release notes for every skipped family have been read and its customizations, integrations and applications have been checked against that target. As of November 2026, the latest family is Brazil.

Confirm the target and both of its dates

Brazil reached early availability on September 24, 2026 and general availability on November 5, 2026. Plan production against the general availability date, and keep the two dates separate in the plan so that a September entry is not read as a production-ready release.

Work through the review in this order

  1. Inventory the changed baseline. List every customized record the upgrade would replace, with its owner and the requirement it serves.
  2. Read each intervening family’s release notes. Work from the oldest family forward and tag each finding with its family, because a jump combines several release sets.
  3. Run Upgrade Preview against the target. Use its predicted skips and application changes as the first draft of the register.
  4. Rehearse on a representative clone. Record the difference between predicted and actual skips.
  5. Record a disposition for every skip. Each record should carry one outcome and a stated reason.
  6. Test every workflow that depends on a changed record. Keep the test result separate from the recorded outcome.

Read the preview as a list of questions

In the Brazil documentation, updated September 10, 2026, Upgrade Preview predicts skipped-record counts, priorities and review status, plus rule-based resolutions, application installs and upgrades, and new columns, tables and indexes. It does not show whether a predicted change breaks a business journey or an integration.

Choose a disposition for each skipped record

The documented outcomes are to retain the customization, merge applicable changes, or revert to the base-system version. Choose by the requirement the record serves rather than by its count or file type. A skip marks a reconciliation decision, not a defect. A record still Not Reviewed on the production date is an open risk, not a finished step.

Check the support position before setting the date

As of November 2026, the current upgrade policy supports the most recent and the immediately previous release families. Family-specific support-end dates could not be verified as of November 2026, so this page omits them. Take the deadline from the instance’s own lifecycle notice, never from release order or a general availability date.

What to ask for before committing to a production date

  • The target family, its general availability date, and the date that availability was checked.
  • The instance’s current family and its support deadline, taken from the instance’s own notice.
  • Actual rehearsal duration and actual skipped-record count, shown next to the predicted figures.
  • A named owner and decision date for each open skip.
  • A recovery approach agreed with ServiceNow support before the production window opens.