OBLYTECH Logo
OBLYTECH Logo

ServiceNow Security and Access: What the Customer Still Controls

ServiceNow runs the platform infrastructure, but your team keeps the decisions that determine who can see and change your data: access rights, data classification, the key option you choose, log retention and the routes data takes out of the instance. For each one, ask for a named owner and dated evidence that the control works.

Who owns access decisions under the shared-responsibility model

The ServiceNow shared-responsibility model, version 4.2 and dated 4 August 2026, divides the work as follows. ServiceNow secures the platform infrastructure and supplies security management and monitoring capabilities. The customer determines access rights to its instance and data, implements suitable security policies and classifies its information. Encryption, logging and incident management involve both sides, so each shared area needs a named owner on the customer side.

If an outside delivery team administers the instance, someone on the customer side still has to own each access decision, including changes to security roles, key administration and log retention. Keep those approvals separate. A single administrator account that can change access rules, keys and log settings at once makes independent review much harder.

In the Configure an ACL documentation, updated 10 September 2026, the Admin overrides option lets administrators pass that ACL’s check regardless of role or script restrictions, subject to documented exceptions. Clearing the option does not stop administrators from passing role checks, so a list of role names tells a reviewer little about what a person can reach. Use real employee, external, integration and administrator identities to test sensitive tables, fields, attachments and reports. Table-level rules are covered in how access control rules apply to table records.

Which encryption option answers the customer-managed key question

The phrase customer-managed keys covers more than one design, so the first job is to establish which architecture a vendor means. Under Cloud Encryption, the keys remain on ServiceNow infrastructure while the customer controls specified key operations. The External Key Management Service, documented separately for Field Encryption, uses an external AWS KMS key to protect the encryption-key hierarchy. Both are customer-managed in a loose sense, but they differ in where the key lives and in what the customer must operate itself.

Ask four separate questions for each option: who generates the key, who stores it, who can use it, and how access is revoked and recovered. Test revocation and recovery before go-live rather than after, because those steps matter most when something goes wrong.

Storage encryption is a separate question from hosting. As of 26 October 2026, data-at-rest encryption is not enabled by default for customers using the standard ServiceNow cloud. Do not assume storage encryption is switched on. Ask for written confirmation of the hosting arrangement and of each encryption layer that is actually enabled, and do not extend that single statement to every hosting model.

If a user or integration is authorized to obtain decrypted data, encryption alone does not prevent that access. Evaluate encryption together with access rules, cryptographic module policies and export controls. The key arrangements are described in more detail on how ServiceNow key management is structured.

Logs, retention and export routes the customer must test

Auditing has to be specified feature by feature. Table auditing records changes on enabled tables, and it does not establish that every data read or export is recorded. In ServiceNow’s auditing and audit retention documentation, updated 10 September 2026, Identity and Access Audit carries a documented maximum retention of 30 days. The Audit Management Console can also apply table-specific retention and permanently purge older records, so a purge should be treated as a change that needs approval.

Build an audit-event matrix. For each log category, list the events that must be captured, the retention period, how the records are protected and where copies are sent. A blanket statement that the platform keeps every audit log for a year fails that test. Where native retention is shorter than your investigation or records requirement, implement an external destination and test two things: that records arrive, and that retrieval works when you need them. In the Log Export Service documentation, updated 10 September 2026, the service can forward copies of supported log events to external analytics systems, but it depends on entitlement, and delivery has to be shown for each source the buyer selects. The source list is covered on the Log Export Service source list.

Export routes reach well beyond the screens a user sees. In the ServiceNow documentation updated 10 September 2026, authentication policies cover REST, SOAP and System or Export Processors, and processor access policies can cover non-public export processors such as CSV and PDF. A separate hardening control governs fields used in inbound query conditions, which is distinct from field-read ACL enforcement. Restricting one export format or interface does not show that APIs, reports, analytics and attachments are protected as well.

What support access and knowledge exposure require

Support access has two parts, and a control on one does not cover the other. The SNC Access Control plugin lets the customer approve specified ServiceNow Customer Service and Support personnel for a defined time window. It does not eliminate authorized ServiceNow Operations access to the underlying infrastructure. The access control configuration documentation, updated 10 September 2026, also separates newer read-only permission records from older records that default to read and write, so existing grants need checking as well as new ones. Raise infrastructure assurance during contract discussions, since it is a separate review with its own evidence.

Knowledge content is a separate exposure problem. On 17 September 2024, security researchers published findings on unintended exposure of ServiceNow knowledge content. ServiceNow acknowledged the issue the same day, published configuration guidance and said it had contacted customers it identified as likely misconfigured. Knowledge base and article audience settings therefore need their own review, apart from general table ACLs, and that review should include guest and external-user identities. The research does not provide a country breakdown of affected customers, so it is not a prevalence estimate for all customers or for any one country.

Evidence to request, and what this page does not establish

Ask vendors and implementation teams for evidence rather than summaries. A useful request list includes:

  • an instance inventory with owners, release and application versions, data classifications and approved purposes;
  • an authentication matrix covering employees, administrators, external users, emergency accounts and integrations;
  • an effective-role review that includes inherited roles and matches the approved access model;
  • the High Security settings in force, with any exceptions and the approval recorded for each change;
  • key custody and recovery documentation for the encryption option in use;
  • the audit-event and retention matrix, with external destinations and delivery checks;
  • test results for each export route and for each knowledge base audience;
  • support-access approvals with their time windows and access types.

Each item should carry an accountable owner, an evidence location, a test date and any approved exception. Without those, a document is a description rather than evidence.

Public material needs the same care. On 10 June 2026, ServiceNow reported successful queries against a subset of customer instances. At the time, it believed the activity involved researchers or customer research, and the researchers said they had not used or retained the data they queried. That makes it a vendor-reported security issue with observed access and a qualified attribution. On its own, it does not establish a verified malicious mass breach. Separately, the Australian National Audit Office report published 6 February 2025 recorded unresolved user-access management findings across Australian government entities. Those are broader government IT findings, not findings attributed to ServiceNow instances.

This page does not describe your instance. Which plugins are active, which settings are in force, which license you hold, where you are hosted, how keys are held and how long logs are kept all belong to your contract and your instance. The evidence list above exists to collect them.

If you want help with this, see ServiceNow consulting.

Frequently asked questions about ServiceNow security and access

Is MFA enforced automatically when we use single sign-on?

No. ServiceNow introduced default MFA enforcement from the Yokohama release for specified local and LDAP interactive logins. The documented default scope excludes SSO logins and users with the external-user role, and API Basic authentication does not require MFA under that default. MFA for SSO users can be enforced through your identity provider or configured in ServiceNow.

What is the difference between admin and security_admin?

The admin role carries broad administrative power. The security_admin role is a separate, elevated role used for ACL and High Security changes, and its elevation lasts for the user’s session. As of 10 September 2026, this role is not inherited automatically from admin. Limit who holds it, and keep its approvals apart from ordinary administration.

Does a Security Center hardening score show the instance is secure?

No. The hardening score measures conformity with Security Center’s settings, and it is useful for setting priorities. It is not a certification, so read a headline score alongside the exceptions behind it.

Does buying an advanced security option or using a SOC 2-assessed provider make us compliant?

Not on its own. A purchase establishes entitlement to capabilities, while an assurance report addresses a defined service and assessment scope. Read the provider’s report for its service boundary, period, exceptions and the complementary controls it expects the customer to run, then test your own implementation and keep operating evidence.

How often should access tests be repeated?

Set the interval from your own risk and contract terms. Repeat the relevant tests after significant configuration changes, after cloning, after identity-policy changes and after major upgrades, and run periodic access reviews between those points.