A load forecast model change needs review before its output reaches planning when the change can shift a number someone acts on: a unit commitment, a fuel purchase, a reserve level, or a maintenance window. Changes to inputs, targets, or the model itself go through full review; routine retrains on an unchanged setup get a lighter check.
Sort forecast changes into review tiers
Not all retrains deserve the same scrutiny. Sort each change by what it touches: the risk sits in inputs and outputs, not in the act of replacing a model file. The tier decides who signs off before the change reaches planning.
Tier one covers scheduled retrains that leave the setup alone. What changes is the fitted parameters on familiar data. Examples include:
- A scheduled retrain that keeps the feature set, the target, and the window length the same.
- A weight refresh on the same data pipeline, with no change to output format or post-processing.
Tier two covers changes to what goes into the model or what comes out of it. Examples include:
- Adding, removing, or redefining an input feature, such as a new weather feed or a change in how holidays are coded.
- Changing the training window, the forecast horizon, or the time resolution of the output.
- Changing post-processing such as bias corrections, floors, ceilings, or manual holiday overrides applied to model output.
- Correcting a data pipeline fault, including time zone handling at daylight saving transitions and unit conversions.
Tier three covers changes that alter what the model is or what the forecast means. Examples include:
- Replacing the model family, moving to an ensemble, or changing how hyperparameters are searched.
- Changing the target, for example from hourly energy to peak demand.
- Blending the forecast with another source, or changing how the blend weights are set.
A pipeline fix can look minor because the model code does not change. It still changes the training data, which is the reason it belongs in tier two.
Write the change record and impact statement
The change record is the first document a reviewer opens. Keep it short enough for a planning lead to read in a few minutes, and include the fields below so no one has to chase the model owner for details:
- The model name, the current version, the proposed version, and the review tier.
- Each planning decision that consumes the forecast, such as unit commitment, fuel purchasing, reserve sizing, outage scheduling, or staffing.
- The expected direction and size of the change for each of those decisions, stated in the units the planner uses.
- Each change to input data, feature logic, or post-processing, with the date of the data snapshot used.
- The backtest output and the comparison with the production version.
- The rollback trigger and the watch period after go-live.
Planners need the impact statement more than the code diff. A sentence saying the Tuesday evening peak will sit higher than the current forecast tells the planner what to check. A sentence saying the error score improved does not. Write the impact statement first, then attach the evidence.
Backtest the candidate against the production model
A backtest answers a narrow question: would the candidate have served planners better over the periods that matter? Choose a test window that covers at least one full seasonal cycle for the region, the weeks immediately before the proposed change, and the days planners remember as hard to forecast. Run the candidate and the production model on the same data with the same forecast cutoffs, so the comparison holds.
Look past the headline error. Two models with similar averages can diverge at the top of the load curve or on unusual days. Break the results down the way planners use them:
- Signed bias by hour of day, so a consistent overshoot during the morning ramp shows up even when the daily average looks fine.
- Error during the highest load hours, because reserve and procurement decisions depend on the peaks.
- Error on weekends, on holidays, and on the days immediately after a holiday.
- Behavior at the ends of the temperature range the region sees, where historical examples are thin.
- Stability, meaning how much the forecast for a given target day moves between consecutive daily runs.
Record each segment where the candidate performs worse, even when the overall result improves. The approver decides whether that trade is acceptable, and the decision belongs in the change record rather than in a sign-off meeting that nobody wrote down.
Assign roles and sign-off steps for each tier
Tier one needs the model owner and a planning reviewer. Tier two adds the data owner, who confirms the lineage of each changed input. Tier three adds a risk reviewer for any model whose output feeds a regulated filing or a contractual commitment. Where the team has enough people, the person who builds a change should not be the person who approves it.
Sign-off runs in this order:
- The model owner submits the change record with the backtest output attached.
- The data owner confirms the source snapshots and each transformation for tier two and tier three changes.
- The planning lead accepts the impact statement for each decision listed in the record.
- The risk reviewer signs off tier three changes and any change to post-processing rules.
- The deployment record stores the approved version number, the approvers, and the approval date.
For help planning this work, see AI and machine learning services.
Where your organization already routes grid operations changes through a ServiceNow change management queue, record forecast changes in that same queue so approvals sit in one place. For that setup, see change enablement for energy and utilities; the energy and utilities section of the site lists related pages.
Roll out the change with a shadow run and a rollback trigger
Run the candidate in shadow before it drives any planning decision. A shadow model produces forecasts that are logged but not used. Compare its output with the production model and with actual load as it arrives. Set the shadow period in the change record, and make it cover the day types planners depend on, including at least one weekend.
Define the rollback trigger before go-live rather than after the first bad day. The trigger names the measure, the segment it applies to, and the threshold the approver agreed. A breached trigger should reach a named person and a documented path back to the prior version.
Prepare the rollout with these steps:
- Keep the prior version deployable so that a rollback needs no retraining.
- Log each live forecast with its version number and the data snapshot it used.
- Track planner overrides as their own record, separate from model output.
- Review the watch period results with the planning lead before closing the change record.
Monitor the live model for drift and planner overrides
Monitoring continues after the watch period ends. Compare live forecasts with actual load each day and watch for drift. Drift usually appears as a slow change in bias, not as a single bad day. Seasonal transitions, new large customers, and changes to rate structures can move demand patterns in ways the training data does not yet reflect.
Planner overrides need their own rules. When a planner adjusts a forecast by hand, log the reason and the size of the adjustment. A run of overrides in the same direction is a signal that the model misses something real, and it should open a tier two or tier three change request instead of being absorbed quietly into planning.
Teams that want a wider view of review loops for models in production can start with human oversight and monitoring for AI systems.
Keep an audit trail that holds up on review
An audit trail earns its place when someone can reconstruct a planning decision months after it was made. Keep the model version, the training data snapshot, the parameter set, the backtest output, the approvals, and the forecasts issued during the watch period. Link each planning record to the forecast version that drove it.
Retention periods depend on your organization’s records policy and on any regulatory obligations that apply to planning outputs. Confirm them with records management before setting the storage plan, and write the retention rule into the change process.
Questions about reviewing load forecast model changes
How long should a shadow run last?
Set the length in the change record so that the run spans the day types planners depend on, including a weekend and, where one falls in the window, a holiday. A shorter run can suit a tier one change with a small, well-understood effect. The approver should write down the reason for the length chosen.
Who gets told when a change is rolled back?
Notify the planning lead, the model owner, and each team that consumes the forecast for the decisions listed in the record. Log the time, the trigger that fired, the version restored, and the reason. The model owner then decides whether the change returns to review as a new record or closes.
Does a small change in the forecast still need review?
Yes, when the change touches inputs or post-processing. A small shift in the daily total can hide a larger change in the peak hours, in one zone, or on holidays. Judge the change by the segments in the backtest rather than by the headline number.
How should an emergency change be handled?
Give the process a short emergency path with a named approver who can authorize the change, a time limit on how long the emergency version can run, and a retrospective review in the next planning cycle. Record the reason when the change is made.
What happens to existing planner overrides after a new version goes live?
Review each override that was tied to the old version. Keep the ones that still reflect a real operating constraint, such as a known outage or a contract term. Retire the ones that were compensating for errors in the old model, and record the decision for each one.
More in this section
- Set AI governance controls around approved use, data access, human oversight, evaluation, audit evidence, exceptions, security, and review.
- Change Control for Public Form Guidance Updates
- Risk Tiers for AI in Returns Processing
- Change Control for Route Planning Rule Updates
- Change Control for Predictive Maintenance Alert Rules