OBLYTECH Logo
OBLYTECH Logo

Work notes list field: how it stores and displays journal entries

A journal_list field is a read-only display type that shows the entries of the journal fields it depends on, such as Work notes or Additional comments. It takes no input. New notes go into the source journal fields, which is why the list is a view over those fields rather than a separate store.

How a journal list field differs from a journal field

ServiceNow has three journal field types, and the difference between them decides where a note appears. A journal field accepts input, stores it, and shows the combined entries beneath the input box. Its entries reach the activity stream on the form and the list view. A journal_input field also accepts and stores input, but it does not show combined entries, and it displays with its own record rather than in the list-view stream.

A journal_list field is the display-only type. It cannot take input and stores nothing. It shows the contents of the journal fields it is built on, in a separate block on the form rather than in the activity stream. When it depends on more than one journal field, it interleaves their entries chronologically, so a reader sees one timeline even when notes were written to different fields.

The practical consequence: to change what a work notes list displays, change the journal fields it reads from. The list has nothing to edit itself. For a plain definition of the field types, the concept explainers cover the wider vocabulary.

Reading and writing journal entries from a script

Scripts often need the full history of a journal field. Calling the getJournalEntry method with the argument -1 returns all entries as one string, with entries separated by a double line break. Splitting that string on the double line break yields an array in which each element is one entry.

Writing works differently. The setValue method is not supported on journal fields. To add a note from a script, assign the text directly to the field on the GlideRecord and then call update on the record. A loop over a query of incidents, setting the work notes value on each and calling update, shows the pattern. For the GlideRecord object itself, see GlideRecord explained.

Email notifications have their own limit. The system property glide.email.journal.lines controls how many journal entries each notification carries. It is an integer, its default is 3, and it sits under System Properties > Email. A value of -1 includes all entries. With the default of 3, a notification carries three entries, so teams with long threads may raise the value. For the wider notification model, see notifications explained.

Where entries appear: the activity formatter

The activity formatter turns journal fields into a readable stream. It tracks items that are not saved in a normal field on the record, such as comments and work notes. It is enabled by default on the Task table and on tables that extend it, including Incident, and also on the Approvals table. Now Assist’s incident summaries and resolution notes are covered on their own page: Now Assist incident summaries and resolution notes.

Each entry shows its activity type and a timestamp at the top. In Core UI the stream refreshes in real time, so a note added by one person appears for another without reloading the form, and user presence shows when someone is typing a comment.

Adding an activity formatter to a form

Creating a formatter requires the ui_macro_admin role. The administrator enters a name such as Activities (task), selects the table, types activity.xml in the Formatter field, leaves Type as Formatter, and submits. The formatter can be created for any audited table.

Placing it on a form requires the personalize_form role. Confirm that the form’s table is audited, then add the entry named Activities (filtered) to the form layout. A table can carry more than one activity formatter, but the system does not allow more than one on a single form.

Layout rules in Core UI

In Core UI, no other field can sit between a journal field and the activities formatter. The stream is built to keep journal fields stacked above it, so the layout should place the formatter directly beneath the journal fields it reads.

Field styles do not reach comments and work notes inside the formatter. Colour for those two entry types is set through the system properties glide.ui.activity_stream.style.comments and glide.ui.activity_stream.style.work_notes. Comments default to transparent and work notes to gold. A value such as LightGreen for comments or Blue for work notes changes the shading of each type.

Controlling which fields and entries the stream shows

Users open the activity filter to choose which fields feed the stream. Changing those choices needs the personalize_form and personalize_list roles. The filter offers Configure available fields, and the selections are saved to both the formatter and the filter.

Activities appear in alphabetical order regardless of how the Selected column is arranged. The exception is Core UI, where Configure available fields controls the order of the Additional Comments and Work Notes entries. The incident property glide.ui.incident_activity.fields is synchronised with these selections, and administrators can also edit it directly.

Several properties shape what the stream displays:

Property What it controls Default or value Role to change
glide.ui.activity.email_roles Roles that can see email entries in the formatter If empty, all users see email; itil is included by default admin
glide.max_activity_size Maximum size of activity content, in bytes 102400 (100 * 1024) admin
glide.history.max_entries Maximum entries shown in an activity stream 250; new entries count after the form is refreshed admin
glide.ui16.emailStreamResponseActions Reply button for email in the Core UI stream false; set to true to enable admin
glide.ui.activity.displayname Controls whether names show as first and last name or as user name/user ID
glide.ui.polaris.experience Must be false for the Live Feed-Activity toggle Set to “false” admin

The email roles setting works alongside field-level read access, so a self-service user may see the formatter without its work notes. When the Emails-autogenerated or Emails-correspondence field is in the list, all users see those emails unless the email roles property restricts them. For how read access is set up across the instance, see instance security and access control.

The size setting is easy to overlook. Its default hides a good deal of content, so a long thread can look cut off until glide.max_activity_size is raised. The default is 102400 bytes (100 * 1024), so set a larger value in bytes when long threads are cut off.

Email has its own timing. An email joins the activity once it is sent. If outbound email is not configured, an unsent message can be found under System Mailboxes > Outbox. A missing email in the stream is often a delivery question rather than a display question.

The list view and the record stream

Core UI has three kinds of activity stream: a list activity stream, a record activity stream on forms configured with the activity formatter, and a stream on the Visual Task Board. The list version opens as a flyout that streams live information for the records on the current list. Clicking an item opens that record’s activity stream without opening the record itself.

The flyout shows the same information as the form formatter, but it is a separate interface. Changes made to the formatter’s properties do not apply to the flyout, so a stream that looks right on the form can differ in the list.

Mentions work across these streams. Typing the @ character in a supported stream lets a user pick anyone in the instance. Each mention creates a record on the live notification table to drive the notification email, and that email does not add text to the parent journal field.

User presence is a related Core UI feature. A green dot on an avatar means the user is logged in, an orange dot means the user recently logged out, and no dot means the user is logged out. Presence is checked every two minutes by default, so a person can appear to be viewing a record for a short time after leaving it. An administrator can switch presence off globally with a system property.

Frequently asked questions

Can someone type new notes into a work notes list?

No. A journal_list field accepts no input and stores nothing. It displays the entries of the journal fields it depends on, so new notes are added to those source fields.

Why does a work notes list show entries from two fields in one timeline?

When a journal_list field depends on more than one journal field, it interleaves their entries in chronological order and displays them together in its own block.

Why does an email not show in the activity stream straight away?

An email joins the activity once it is sent. A message still waiting to go out can be found under System Mailboxes > Outbox when outbound delivery is not configured.

How many journal entries appear in a notification email?

The glide.email.journal.lines property controls this. Its default is 3, and a value of -1 includes all entries.

Can a script read every entry in a work notes field?

Yes. Calling getJournalEntry with -1 returns the full field as one string, and splitting that string on the double line break produces each entry as an array element.

Why do colours set on the field not change the note colours?

Field styles do not apply to comments and work notes in the activity formatter. Those two entry types take their colours from the glide.ui.activity_stream.style.comments and glide.ui.activity_stream.style.work_notes properties.

Summary

Writing still happens in those journal fields, and the activity formatter presents the entries as a stream. The controls that matter are the formatter’s placement and filter, the email and size properties, and the style properties for each entry type. For the wider platform context, the ServiceNow platform guides group related topics by area.