ServiceNow AI Lens is a generative AI application inside the ServiceNow platform. It reads images, scanned handwritten notes, spreadsheets, emails and web pages, pulls out the data, and fills ServiceNow form fields or shows a preview first. Users run it from a browser or a desktop app, and administrators configure the buttons and Lens actions that control its behavior.
What the app does with a screen or file
The core job is turning visual material into record data. A person captures a screen or uploads a file, the app reads what is there, and it proposes values for the fields on a form. An email is a simple case: the app can scan the message and fill in the fields of an Incident form.
The same approach works for heavier material. Scanned handwritten notes, Excel sheets and web pages can all be analyzed, and instructions typed during capture shape the output. Someone who captures several expense bills can ask for the amounts to be grouped by date and by category.
The app runs on the Azure OpenAI GPT-4o large language model. In practice it gathers and prepares information, and a person still checks the result before it is saved. For the wider AI picture, see ServiceNow AI and agentic automation.
Ways to capture material
| Access point | Installation needed | What it covers |
|---|---|---|
| Browser | None | Capture one screen or upload one or more files, then auto-fill form fields |
| Desktop app | Download and install | Multiple screenshots with a running count, file uploads, a consolidated preview, Lens actions |
| Service Portal catalog item | Browser or desktop app | A Fill with Lens button on the catalog item that opens the chosen version |
| Now Mobile app | Mobile app | Extract data from attachments and auto-fill mobile form fields |
| Virtual Agent | Enabled on the instance | Scan an image inside a chat and receive insights, recommendations or resolution steps |
The browser route needs no download. Administrators choose the default launch option on the ServiceNow AI Lens downloads and preferences page, which offers Browser or Desktop app and can be changed at any time. In a Service Portal catalog form, the browser version captures a single screen and also accepts uploaded files (up to 10 unprotected files, 10 MB combined). Capturing several screens needs the desktop app. Chromium-based browsers are the suggested choice, since screen capture varies from one browser to another.
Switching on the skill and the roles that use it
The app requires a ServiceNow Pro Plus or Enterprise Plus license, and activating the ServiceNow AI Lens plugin installs the roles and tables the app uses.
The generative AI capability comes from the ServiceNow AI Lens skill, a Platform skill that an admin turns on. Confirm the app is installed, then go to All, then AI Admin Hub, then AI Skills. Select Platform in the workflow list, search for ServiceNow AI Lens, and select Turn on on its tile. Once the skill is on, it can create or update records by auto-filling forms, preview extracted data, follow extraction instructions and gather insights across several images. For the wider Now Assist picture, see Now Assist for ITSM.
Access follows three roles. For the wider access model these roles sit inside, see access control lists.
| Role | Name in the system | What it allows |
|---|---|---|
| Lens user | lens_user | Capture, upload, extract and auto-fill. This role contains the sn_nowassist_admin.user role. |
| Lens admin | lens_admin | Create and configure Lens actions. This role contains the Lens user role. |
| Admin | admin | Activate the skill, set system properties and download the installers. |
Because the Lens admin role contains the Lens user role, a person who configures Lens actions can also use the app. A Lens user alone cannot change how it is set up.
Desktop sign-in takes four steps: enter the organization’s instance URL, select Proceed, sign in, and use an account with the lens_user role. On macOS the app also needs permission to record the screen, granted in the Privacy and Security settings. Auto-login is off by default. When an admin switches it on, a user who has signed in before goes straight to the home page while the session stays active.
Lens actions control behavior for each table
A Lens action sets default instructions, a trigger option, custom context and post-processing steps. A lens_admin creates them, and a Lens action is limited to the users, groups or roles assigned to its record. The trigger option pairs the point where the app starts with what it does.
| Trigger from | Trigger for | What happens |
|---|---|---|
| Instance | Form | A form is auto-filled from inside the instance using the Lens action’s default instructions and context |
| Desktop | Form | The app starts from the desktop, shows an editable preview, and saves the form on Submit |
| Desktop | Excel Mapping | One Excel sheet is attached, its column headers are mapped to table columns, the mapping can be reviewed and changed, and the data is inserted |
| Instance | Service | The app runs as a back-end service called from a client or server script |
| Desktop | Others | The extracted data is previewed and post-processing steps run after Submit and close |
The Excel route has two rules: one sheet is attached at a time, and the first worksheet is the one analyzed. A preconfigured Lens action named Import Excel Sheet data to custom table is available by default, and copying it is a practical starting point for a custom table.
Default instructions are sent to the model alongside what the user types, so a fixed request, such as the title, author and publication date from a paper, does not need retyping.
Which forms show the Lens buttons
The Create with Lens and Update with Lens buttons are governed by system properties. Changing them requires the admin role, and they live in the System Properties table.
| Property (plain name) | Default | Effect |
|---|---|---|
| show_lens_action_on_all_tables | true | When true, the buttons appear on all tables except those in the exclusion list. When false, they appear on the tables in the inclusion list. |
| lens_inclusion_table_list and lens_exclusion_table_list | none | Comma-separated table names, used with the all-tables switch |
| show_lens_action_on_all_catItems | true | The same switch for catalog items, with its own inclusion and exclusion lists |
| sn_lens_repository_url | ServiceNow distribution path | Where the app package is downloaded from |
What the app records
Two tables keep a trail, and both show a user only the records created for or assigned to that user.
The Lens Execution table gets a new record each time a record is created or updated through the app. It notes the table where the action started and the editable fields passed to the app. The Lens Transaction table stores the response the language model returned after a user ran the analyze action.
Source images can also be attached to filled records, which supports audit and verification.
Data handling and responsible use
Data moves from the customer’s instance to a centralized ServiceNow environment. That environment may sit in a different data center region, and the data may pass to a third-party cloud provider such as Microsoft Azure. ServiceNow collects the inputs, outputs and edits to improve its technologies, and customers can opt out of future collection at any time.
Availability has limits. Some AI features are unavailable in the FedRAMP, NSC DOD IL5 and Australia IRAP-Protected data centers, on self-hosted instances and in other restricted environments, and some are offered only in certain regions.
Personally identifiable information should not be scanned. Medical reports and financial reports are the named examples, because the language model should not receive sensitive content.
The app may not always produce accurate, complete or appropriate information. Output should be tested and reviewed by a person, and it should not be the only basis for a decision, especially in healthcare, finance, legal, employment, security or infrastructure work. Use is subject to the ServiceNow AI Acceptable Use Policy.
Setting up Virtual Agent use
Virtual Agent use needs two steps. The AI Search application must be enabled, which takes the ais_admin or admin role. The default Now Assist in Virtual Agent assistant must also be enabled, with the virtual_agent_admin or admin role, and then added to a portal using the Enhanced chat option.
Frequently asked questions
Who can use ServiceNow AI Lens?
People with the lens_user role can use it. That role covers capturing screens, uploading files, extracting data and auto-filling form fields. An admin turns the skill on first, and the Lens admin role is needed to configure Lens actions.
Does ServiceNow AI Lens need to be installed on a computer?
No. The browser version needs no download. The desktop app is the choice for multiple screenshots, file uploads and the consolidated preview, and it is installed from the downloads and preferences page.
Can I scan a financial or medical report with it?
Those reports are the named examples of material that should not be scanned. Personally identifiable information should be kept out of the app, because the language model should not receive sensitive content.
Which AI model does it use?
It currently uses the Azure OpenAI GPT-4o large language model. Data from the instance may pass through a centralized ServiceNow environment, which can sit in a different data center region.
Can a customer stop its data being used for improvements?
Yes. Customers can opt out of future data collection at any time.
Is it available in all regions?
No. Some AI features are offered only to customers in certain regions, and some are unavailable in the FedRAMP, NSC DOD IL5 and Australia IRAP-Protected data centers, on self-hosted instances and in other restricted environments. Availability can change between releases, so check the region before planning a rollout.