To source parts in Dispatcher Workspace, open the work order task, select an eligible requirement under Part Requirements, and choose Source Part. Set the destination and stockroom search criteria, select an available stockroom, enter Reserve quantity, and submit. Then follow the transfer order through delivery to the destination.
Check the requirement before searching for stock
Sourcing begins with the part requirement attached to the task. That record connects the model and quantity needed for the job with the reservation and transfer that follow. Start by checking the task and requirement together: finding stock for the wrong model or destination can still leave the technician unable to complete the assigned work.
The wm_dispatcher role is required to source parts. The same role is required to create a part requirement in Dispatcher Workspace. Before sourcing, check that the part has not already been requested. The Source Part action depends on the selected requirement being eligible; a previous sourcing or request can explain why the action is unavailable.
For requirement creation, the task can be in Awaiting Qualification, Qualified, Assigned, or Work in Progress. Enabling Apply Work Order template in draft status also allows requirements to be created for a task in Draft. The steps below match the current Brazil release of this procedure. Check the Dispatcher Workspace configuration on your own instance before adopting it as a team procedure.
Keep three questions separate during preparation: what the task needs, where the part will come from, and where it must arrive. A requirement answers the first question. The sourcing form addresses the other two. For the broader request process, see field service parts and inventory requests.
Create or review the part requirement
Open All > Field Service > Dispatching > Dispatcher Workspace. To create a requirement, open a task number from the task panel or calendar, then select New in the Part Requirements related list. Review the fields before saving:
- Service order task: check that the requirement belongs to the intended work order task.
- Model: identify the part model needed for that task.
- Required by date: review the automatically filled date, which is based on expected travel start time, and change it manually if necessary.
- Required quantity: enter the total needed for the requirement.
- Mandatory: indicate whether the task requires this part to be performed.
Select Save. If the part is out of stock, a message at the top of the form identifies it. Treat that message as a reason to investigate availability before committing to a sourcing plan. Saving a requirement records demand; it does not demonstrate that a shipment is on its way.
For an existing requirement, compare Required quantity with Reserved quantity, which records the amount already sourced. Required quantity becomes read-only once the full required amount has been sourced. Avoid creating another requirement merely because the original quantity can no longer be edited; first establish what has already been reserved.
Work orders created from a work order template can have their task requirements added automatically. Review those entries before adding new ones. A dispatcher should establish whether the required model is already present, rather than treating an unfamiliar task as a blank starting point. This check helps prevent duplicate demand from entering the sourcing decision.
Source parts in Dispatcher Workspace
- Open the work order task from the task panel in Dispatcher Workspace.
- Choose the Part Requirements tab and select the part requirement you intend to source.
- Select Source Part. If it is unavailable, inspect the requirement’s previous sourcing and requested condition before proceeding.
- Review To stockroom. This is the receiving location, and it is automatically populated with the agent’s default personal stockroom.
- Set Stockroom selection criteria and Search radius to find an appropriate source.
- Select a stockroom from the available results, enter Reserve quantity, and select Submit.
Do not rush past the receiving location because it is already populated. Compare it with the destination needed for the assigned agent and task. An automatically supplied location still deserves a check when planning how the part will reach the technician. The Source Part option is enabled only when the part has not previously been sourced and is not marked false as requested. If it is unavailable, check the requirement’s sourcing history before you go further.
Before submitting, reconcile the quantity you intend to reserve with the requirement and its existing reservation. For example, if a task needs several identical components, distinguish the total needed from the amount already sourced. Use the record’s quantities to make that decision; a new reservation should reflect the outstanding need you have established. The Reserve quantity field asks for the total quantity of the part needed to complete the task, so enter the full figure for that task and confirm the result against the requirement’s Reserved quantity afterward.
Choose between stockroom search and a part request
Stockroom selection criteria determines the source pool. Choices include preferred stockrooms, all stockrooms, and assignment group stockrooms. Search radius narrows the geographical search in the selected distance unit, miles or kilometers. Consider these settings together when interpreting an empty result.
The form lists stockrooms that contain the specified part, and their locations also appear as cards on the map screen. An empty list under a narrow search does not establish that the part is unavailable across the organization. First examine whether the selected stockroom pool and radius fit the task’s sourcing need.
If no stockroom matches the chosen criteria, change the criteria or select Place a part request to seek the part from assignment groups or other stockrooms. These are different next steps: one changes the search, while the other initiates a request. Decide which action fits the remaining uncertainty before adding another request to the workflow.
The request route creates a part request, REQ, in Pending Approval and a part request line in Requested. It also creates a temporary part request record, RITM, for the requested parts and sends a mobile notification to agents. Those states give the dispatcher a specific follow-up point; they do not mean the part has been delivered.
Name the person who follows up a part request while it sits in Pending Approval, so the request does not stall. For the wider ServiceNow setup around these tools, the ServiceNow implementation page describes how that work is scoped.
For a dispatch handoff, record which route you chose and what remains unresolved. This gives the next dispatcher enough context to continue the search or follow the request without repeating the original decision.
Follow the transfer through to delivery
Submitting the sourcing selection creates a transfer order and transfer order line for the sourced part. When sourcing from other stockrooms or assignment groups, follow through on the transfer order so that movement to the designated location is completed. A successful reservation is an intermediate operational result. When parts come from another stockroom or an assignment group, the transfer order line is created automatically, and the transfer order is the record you complete to confirm the parts have moved to the designated location.
The requirement provides two separate indicators. Sourced records that the required quantity has been reserved and transfer requested between stockrooms. Delivered records whether the transfer order lines under the requirement have been delivered. Read them separately when deciding whether parts are ready for the job.
A dispatch review checks the model, destination, required date, quantities, and transfer progress together. If the task is approaching its planned visit while delivery remains unresolved, raise that operational dependency with the people responsible for the task and stock movement. Avoid treating the existence of a transfer order as proof that the technician has the part.
Give each transfer order a named owner who confirms it is completed and the parts reach the designated location, since a created transfer order line is not the same as a delivered part.
Why might Short description reflect the originating incident?
The requirement’s Short description comes from the parent work order. When that work order originates from an incident, problem, or change request, the requirement inherits the short description from that originating record. The field is not visible by default, so its absence from the form does not by itself indicate missing demand.
Should dispatchers manually assign the requirement number?
The Number field is automatically generated. During review, focus on the task association and part details rather than devising a separate numbering convention for the requirement. Use the generated identifier when discussing the record with the team.
Where does this activity sit within the dispatch experience?
Dispatcher Workspace is one of the parts configured when you set up the CSM/FSM Configurable Workspace, alongside the Field Service Territory Planning Console. The Dispatcher dashboard is a separate view that shows real-time operations data and agent status. The dashboard presents operational information, while Dispatcher Workspace supports scheduling, task management, maps, and agent calendars. Use that context to connect a parts dependency with the task and agent schedule under review.