OBLYTECH Logo
OBLYTECH Logo

Update a saved ad hoc filter

To update a saved ad hoc filter in Dispatcher Workspace, open List, go to Saved Filters > Task Filter, select the filter, edit the desired fields, and click Save. The action requires the wm_dispatcher role. Check the saved parameters afterward to make sure the filter reflects the intended change.

Prepare the change before opening the filter

A saved filter needs attention when its parameters no longer describe the work a dispatcher intends to review. Start by writing down the intended selection in plain language. Identify which tasks should belong in the view and which should fall outside it. This gives you a specific outcome to test after saving.

Keep that outcome narrow. A request such as “make this filter more accurate” does not tell the person editing it what to change. A better request identifies the condition that needs revision and a recognizable example of work that should appear afterward. Treat those examples as review criteria rather than as additional product settings.

Record the existing values before editing. A short change note should identify the saved filter, the current parameter values, the proposed values, and the operational reason. A short change note helps most when the filter name is already familiar to other dispatchers, because they will notice a change they did not expect.

The update action requires wm_dispatcher. The navigation below is the same in the Brazil, Australia, Zurich, Yokohama and Xanadu releases. Labels in the current Brazil release say Select rather than Click, so follow the wording on your screen. For the wider discipline around reviewing dispatch changes, use the Field Service Management governance model.

Update a saved ad hoc filter step by step

  1. Navigate to All > Field Service > Dispatching > Dispatcher Workspace.
  2. Select List to reach the list view.
  3. Under Lists, navigate to Saved Filters > Task Filter.
  4. Select the saved filter that needs changing.
  5. Select and edit the desired fields.
  6. Select Save to store the revised parameters.

Selecting Save is the step that changes the stored filter. Until you select it, the saved filter keeps the parameters it had before, so an unfinished edit leaves the stored values as they were. Confirm that the save completed before you move on to verification.

At the selection step, pause to verify that you have the intended filter. Compare it with the filter identified in the change request and with your record of its existing values. A correct edit to the wrong filter still leaves the original dispatch problem unresolved and creates another item to investigate.

When editing, concentrate on the values needed for the agreed outcome. Avoid adding unrelated changes simply because the filter is open. Separating unrelated revisions makes it easier to understand why the selected work changed and to reverse a mistaken decision without discarding a valid one.

After you select Save, the saved filter is updated to the new parameters. Keep your before-and-after notes until you have checked the stored values and reviewed whether they represent the work the dispatcher intended to find.

Check both the parameters and the dispatch result

Begin verification with the saved filter itself. Return to the same entry under Saved Filters > Task Filter and compare its values against the change note. This checks that the intended filter was edited and that the values you meant to retain are present.

Then review the work against your examples. Choose a task that should satisfy the revised conditions and a task that should fall outside them. Compare their actual values with the saved parameters. This is a recommended review method: the examples give you a reason for accepting or questioning the result.

  • Identity: Is this the saved filter named in the request?
  • Values: Do the stored parameters match the agreed revision?
  • Inclusion: Does the expected task meet those parameters?
  • Exclusion: Does the contrasting task fail the intended condition?
  • Explanation: Can another dispatcher understand why the change was made?

Work through the five checks in order. If Identity fails, the other four are measuring the wrong filter, so correct the selection before you compare values or examples.

Do not judge success from the number of visible tasks alone. A shorter list can reflect a sound restriction or an accidental omission. A longer list can reflect an intended expansion or a condition made too broad. Evaluate the reason that a task belongs in the selection, then assess the overall workload.

If the result differs from expectations, compare the task values and filter values before making another edit. Teams that review dispatch rules regularly can compare their routine against the practices in Field Service Management best practices.

For example, if a requested revision broadens the work under review, examine a task that was outside the previous selection but belongs under the new rule. Explain which condition now includes it. If the request narrows the selection, choose a task that should drop out and explain why. Record any uncertainty about the task data separately from uncertainty about the filter, because those lead to different follow-up questions.

Use export as a separate review aid

Exporting saved ad hoc filters is a separate action requiring wm_dispatcher. It starts from the same navigation: All > Field Service > Dispatching > Dispatcher Workspace, then List (Select in Brazil), followed by Saved Filters > Task Filter under Lists.

Select Export in the Saved Filters list, choose a File Type and a Delivery Type, then select Export again. For Download, the file saves to your computer. For Email, enter the recipient address when prompted.

Consider an export when a review needs a separate record of the saved filters. Label your working record so the reviewer can distinguish the state before the edit from the state afterward. Choose a delivery method appropriate to your organization’s handling rules and the people involved in the review.

An exported record helps with comparison, but validation still needs the current saved filter. Compare the exported information with the live parameters and your intended outcome. Keep export and update as distinct steps in your change notes so a completed export is not mistaken for a completed revision.

The outcome of an export is plain: the saved filters are formatted and exported to the delivery type you chose. The export therefore gives you a record of what is saved and does not change any filter’s parameters. That makes it useful for a before copy and an after copy. Export once before the edit, make the revision, export again, and compare both records with your change note. If you only need a local copy, choose Download. If the record has to reach a colleague, choose Email and check the address before you export, because the file goes to whatever address you entered.

For help planning this work, see ServiceNow implementation.

Keep deletion separate from a parameter correction

Deletion addresses a different decision: removing a filter from the saved filters. That action also requires wm_dispatcher. From Saved Filters > Task Filter, select the filter, open the More Actions icon, click Delete, and click OK.

Choose the action according to the intended outcome. If dispatchers still need the saved filter with revised parameters, follow the update procedure. If the filter should be removed, consider deletion as a separate change with its own review. Do not use removal as a shortcut while investigating a value that appears wrong.

Before a removal decision, establish why the filter is no longer needed and tell the people whose working instructions reference it. It reduces confusion when a familiar entry disappears and prevents a routine parameter correction from becoming an undocumented change in how dispatchers locate work.

Investigate an unexpected result without compounding the change

If you cannot complete the update, establish the point where progress stopped. Distinguish a navigation problem from uncertainty about the selected filter or a disagreement about its parameter values. Give the administrator the action attempted, the filter involved, and what you observed; avoid treating an unrelated role assignment as the default remedy.

If saving appears to leave the old values in place, inspect the selected entry again before repeating the edit. Compare it with your original notes. If the values are correct but the task selection is surprising, revisit the business condition and the task examples rather than changing several fields together.

Keep a copy of the original parameter values in a form you can paste back. If a revision has to be reversed, that copy is the only reliable reference, because memory of the old values becomes unreliable once the saved filter has changed.

A filter review can expose an unclear dispatch rule. Resolve that ambiguity with the person responsible for the selection criteria before making another revision. The guide to Field Service Management mistakes covers related problems.