To create pallet assets, first create a pallet model, then open Asset estate in Hardware Asset Workspace with the asset role. Select New Asset, choose Pallet, and select Create. Complete the pallet details and select Save. The new record appears in the Pallets tab for subsequent inventory work.
Pallet records depend on the Hardware Asset Management Professional plugin. Confirm it is active on your instance before starting, because the pallet options will not be available without it.
Prepare the model and stockroom information
The model is a prerequisite for creating the pallet record. Have the appropriate pallet model ready before starting the form. The role required for this creation action is asset. Other pallet actions can require a different role, so confirm the role each action needs on your instance before you start it.
Gather the physical tag, intended stockroom, and current condition of the pallet. If it is in storage, identify its aisle and space as well. These details make the record usable by someone locating the pallet on the floor, rather than merely recognizing its name in a list.
Decide what the record represents before entering data. A pallet asset has its own identity even when it will hold other assets. Its automatically populated Quantity is 1. Avoid using that number as a count of the equipment placed inside it; review the contained assets separately when planning inventory work.
For the wider setup decisions around the workspace, use the Hardware Asset Management setup guide. Check the form on your instance and release before applying this sequence to a configured environment.
Create pallet assets from Asset estate
- Open All > Hardware Asset Workspace > Asset estate.
- Select New Asset to open the asset type dialog.
- Choose Pallet, then select Create.
- Complete the form using the pallet model and the physical identification and storage information you prepared.
- Select Save, then check the resulting entry in the Pallets tab.
During creation, the form presents Details, Disposal, Activities, and Audit sections. Their presence does not mean each section needs information for a newly stored pallet. Work through the fields that describe the actual item and its current situation; do not supply future retirement details merely to make the form look complete.
Treat the saved Pallets entry as the first completion check. In most stockrooms, a quick comparison with the list is the easiest way to catch a second record for the same container.
Check identity, type, and state before saving
Model identifies the product model of the pallet. Asset tag holds the alphanumeric tracking information attached to the physical item. The Display name derives from the tag and model values established at creation, so a confusing display name is a reason to inspect those underlying inputs.
Number is generated automatically and provides a unique record number. Model category is read-only and is populated as Pallet. These fields have different purposes from the physical tag: one identifies the record, while the tag connects the stored information to the item being handled.
Pallet type supports Pallet, Bin, Box, Container, and other. Choose the value that describes the physical container. For example, a storage box should be distinguishable from a pallet even though both are created through the Pallet asset type. Keep that choice separate from the model selection.
The listed State choices are In stock, In transit, Retired, and Missing. Select the value that reflects the item’s situation at creation. Substate depends on the selected State; examples include Available and Reserved. Review Substate after choosing State rather than assuming a previously visible value remains appropriate.
Use Reserved for when recording the person for whom the pallet is reserved. Check the person and the state information together as an operational review. A name alone does not explain whether the pallet is physically available in the stockroom or already moving elsewhere.
Make the storage location specific enough to find
Stockroom identifies the stockroom, while Location describes its physical location. Aisle narrows the position within that stockroom, and Space narrows it within the aisle. Read those fields together when checking whether someone could retrieve the pallet from the information recorded.
For an In stock pallet, check the available Aisle and Space fields. If the location detail is absent, first inspect the selected State rather than inventing a replacement field. Avoid changing the state simply to expose a location control when the new state would misrepresent the pallet’s condition.
Parent records a parent asset. Use it to represent an actual asset relationship, rather than substituting a stockroom or aisle reference. Comments provides optional additional information. Put explanatory context there when it helps another handler understand the item, while keeping structured location information in its corresponding fields.
A suitable review example is a tagged bin physically stored in a known aisle: verify its model, select Bin as Pallet type, and record the actual stockroom position. The objective is agreement between the floor and the record. The stockroom management and hardware receiving guide covers the neighboring receiving work.
Review lifecycle fields without inventing future events
The Disposal section separates planned dates from completed events. Scheduled retirement describes the planned retirement date; Retire date records the actual retirement date. Disposal date concerns completion of disposal. Keep those meanings distinct when reviewing an older pallet or registering one with known lifecycle information.
Disposal order number, Disposal vendor, Vendor disposal order ID, and Disposal date appear when Hardware Asset Management from the ServiceNow Store is installed. Do not diagnose their absence as a failed pallet creation without checking that installation dependency.
Beneficiary identifies the organization receiving a retired asset. Refresh request line holds the corresponding line number when the Hardware Asset Refresh flow has identified the asset as aged. These fields describe lifecycle context; they are not replacements for the initial model, tag, and storage checks.
In Activities, Work notes holds additional information. Updates to State, Substate, and Reserved for are recorded there automatically, as is receipt through a transfer order. Use those entries when reviewing how a pallet reached its current situation. The hardware asset lifecycle guide provides broader context for that review.
Validate the saved pallet before inventory work
After saving, check the Pallets entry against three groups of information: identity, current state, and physical location. Read the generated number alongside the tag and model. Then compare the state and stockroom details with what the handler knows about the item. Resolve discrepancies before treating the record as ready for movement.
An in-stock pallet can move between stockrooms through a transfer order, including an empty pallet. When it contains assets, transfer workflow updates to the pallet apply to those contents. If the transfer moves the contents without the pallet, their association is removed after the Ready for fulfillment task closes.
That distinction matters when deciding what to register and what to move. Before the next workflow, agree whether the handling unit travels with its contents or remains behind for reuse. If your team needs help planning this work, see ServiceNow implementation.
If the creation result does not match expectations, start with the model prerequisite, the asset role, the selected asset type, and the saved fields. Keep the observed symptom specific. The Hardware Asset Management troubleshooting guide supports the broader investigation.
Questions about using a newly created pallet
Can the Audit section be used to audit the pallet?
No. Audit-related fields can appear on the pallet form, but pallet assets cannot undergo an audit. Their visibility should not be used as evidence that an audit operation is available for that record.
Can a receiving issue be handled by returning one contained asset?
For a pallet received through a transfer order, the return applies to the pallet with its assets. Individual assets inside that pallet cannot be returned separately through that pallet return behavior. Review the affected contents before arranging the return.
Are asset bundles included when a pallet enters disposal?
Adding a pallet to a disposal order also adds its assets and child assets, but excludes asset bundles. Review the intended disposal population instead of assuming that everything physically grouped with the pallet will be included.
Why might a loaned asset disappear from the pallet association?
When a contained asset is consumed as a Loaner asset, it is removed from the pallet after the loaner order’s Prepare task closes. Check that workflow event before treating the changed association as a recording mistake.
What happens when a contained leased asset is returned?
A leased asset returned from a pallet is removed from the pallet after the Shipment task closes. The timing differs from creation, so compare the workflow progress with the current association when reconciling the pallet’s contents.