To set up hardware model normalization, check HAM resource category eligibility. Prepare the manufacturer and model identifiers, and run normalization against the HAM Content Service. Check the normalized fields and the status before you rely on reports or lifecycle dates. Normalization makes model information uniform. It does not replace the original identifiers or merge duplicate model records.
Configure hardware model normalization around eligible models
Begin with a small group of hardware models whose identity you can confirm. Include a known manufacturer, a full model number, and a model with missing details. This lets you tell a setup problem from a matching problem before you process a larger set.
A hardware or consumable model qualifies when its model category is linked to a HAM resource category that is opted in. A model can stay New because its category is outside the opted-in scope. Confirm the opt-in before you treat an unchanged status as a failed job.
There is an OT exception when the OT Asset Management application is active. A model in an opted-out resource category can still qualify through a linked OT asset whose install status is neither Retired nor Missing. The OT entity flag marks that asset. Keep this exception in mind when a model is processed despite an apparent category exclusion.
Use the HAM setup and configuration guide for the wider implementation work. Keep this setup decision focused on which model records should get standard content.
Prepare identifiers before running the match
The matching input is the mix of Manufacturer, Name, and Model number. The system weighs these values together, not as separate lookups. A recognizable manufacturer does not establish that the exact hardware model has been identified.
Normalization needs the device model number. You can supply it in Name or Model number. Check vague descriptions before testing. A product family name may cover several devices. A full model identifier gives the matching process a more exact input.
Keep the original values on hand for comparison. Normalization writes to separate normalized fields and leaves what was entered in place. So two local model records can match the same content model and still be two separate records.
Decide how model maintenance will be owned before expanding the rollout. Pick someone to check unresolved identities and someone to approve manual exceptions. These are suggested duties. They are apart from the application roles needed to do an action. The hardware asset governance model can help sort out those decisions.
Create and normalize a hardware model
The role needed for the model normalization procedure is admin, asset, or model_manager. Use an account with one of those roles. Domain setup has a different role need, described below.
- Navigate to Workspaces > Hardware Asset Workspace > Model management.
- Select the Hardware models tab, then select New.
- Fill in the Hardware model form with the identifying details you have and select Save.
- Check the normalized values and lifecycle information that result, if a content match is there.
- For an existing model that needs another try, select the model and select Normalize where that action is offered.
In Core UI, the route to create a model is Product Catalog > Product Models > Hardware Models. Select New, enter the model details, and select Save. The route for a consumable is Product Catalog > Product Models > Consumable Models.
Normalization can start in four ways. It starts when a model is created. It starts when Manufacturer, Name, or Model number changes. It starts through the Normalize action. It also starts through the daily HAM – Hardware Normalization job. Normalize is not offered for models already marked Normalized or Manually Normalized.
Test a saved model before you change a large import. Compare the input mix with the identity that comes back. A completed operation is not sufficient evidence that the resulting model is the one your asset team intended.
Use the status to choose the next action
Read Normalization status next to the filled fields. Each status points to a different gap. A single queue of failed models can hide several kinds of work.
- New: Processing has not happened, or the resource category is not opted in. Check eligibility and the daily job before you change identifiers.
- Normalized: The match gives a normalized manufacturer, product, device type, and model. Check that identity against your sample.
- Partially Normalized: Manufacturer, product, and device type are there, but the specific normalized model is missing. Check Name and Model number.
- Manufacturer Normalized: The manufacturer mapping worked without the rest of the normalized data. Look into the model details.
- Match Not Found: No matching content is there. Custom, new, and legacy hardware may need a closer look at identity.
- Manually Normalized: Someone edited a normalized field by hand. The system keeps the entered values.
For unresolved models, split missing source data from hardware that is truly absent from the content library. Fixing a missing model number solves the first case. A supported manual identity or a custom model may suit the second. Do not pick a similar-looking model just to improve the status.
For the wider meaning of these results, see hardware model normalization. Keep your test record with its original identifiers, the status returned, and the decision you made. Then another administrator can understand the outcome.
Check domains, display names, and lifecycle settings
Check these settings on your instance and release. In Brazil and Zurich, normalization runs only for leaf domains by default. Turning on other domains needs the asset and domain_admin roles.
For the Brazil domain setup procedure, the roles needed are asset and domain_admin. Open Domain Asset Process Settings [alm_domain_asset_process_setting] and find the domain. Set Run asset process to true. The scheduled job then processes that domain’s hardware models on its next run.
The sn_hamp.update_assets_norm_model_name property controls whether asset display names are recalculated after model normalization. Its default is true for new HAM installs and false for upgraded instances. Suppose a model has the right normalized identity but its linked asset names stay the same. Check this property before you repeat normalization.
Lifecycle content depends on a specific normalized model. A match at the manufacturer level or a partial match gives no model lifecycle records. A Manually Normalized model can get lifecycle content when it has a normalized model. Check the actual model reference before you read missing dates as a scheduling problem.
The sn_hamp.approximate_dates_in_hw_lifecycle property controls the use of approximate lifecycle dates. Check whether a date is approximate before you use it in a replacement decision. Note that difference in the team’s planning process. Do not treat all lifecycle dates as equally exact.
For help planning this setup, see ServiceNow implementation.
Validate content timing and operational results
Content publication, content download, normalization, and lifecycle recalculation run on different schedules. Weekly content can take up to a week to reach an instance. The next daily normalization run follows. So a newly added hardware model may stay unresolved while older models normalize well.
Download Hardware Content schedules fetch weekly content. HAM – Hardware Lifecycles applies changed lifecycle content weekly. HAM – Daily Job works out the current lifecycle phase daily. Look at the right stage. Do not assume another normalization try will refresh a lifecycle phase.
In Hardware Asset Workspace, Normalization Metrics shows in Model management. Model Normalization Scorecard shows in Hardware asset overview. Use those views to judge the whole set. Then look at single model identities before you accept the setup.
A recommended acceptance check compares a sample’s source identifiers, normalized identity, status, asset display name, and lifecycle records. Give unresolved models a named reviewer. For deeper work beyond these checks, use the HAM troubleshooting guide.
Questions about normalization exceptions
Can reverting one model affect other models?
Yes. Reverting a Normalized or Partially Normalized model turns off the content rule involved. It also reverts other models normalized by that rule, except Manually Normalized models. Check how far this reaches before you use reversion to fix a match.
Can a manually normalized model be reverted?
A Manually Normalized model cannot be reverted to its earlier status. Treat manual field changes as a deliberate exception decision. Record the supporting identity details before you save.
Are lifecycle records deleted when a match is lost?
Content Service lifecycle records are turned off, not deleted, when the model loses normalization. A later match to a different content rule can add lifecycle records tied to the new match.
Which lifecycle phase wins when dates overlap?
The current phase comes from active records that cover today. The latest start date wins. Ties then use phase priority and source priority. The sn_hamp.model_lifecycle_phase_order property controls the phase order.
Can local lifecycle decisions coexist with supplied dates?
When you are opted in to the Hardware Asset Management Content Service, you can override lifecycle values added by the scheduled job. You can also add your own lifecycles. Go over those decisions with the people in charge of replacement planning.