To fulfill hardware asset requests manually, connect the hardware catalog item to the Standard Hardware Asset Request flow, submit the order through Service Catalog, and work through its sourcing and deployment tasks. Procurement staff source the requested hardware, complete picking when enabled, and close deployment so asset and associated CI details update.
Prepare the catalog item before taking an order
Start with the catalog item that the requester will actually select. A hardware request needs a connection between that item and the Standard Hardware Asset Request flow. Without checking that connection, a team can spend time investigating procurement when the starting configuration is the issue.Make this change with the catalog_admin role. A catalog item only starts the Standard Hardware Asset Request flow when its Flow field names that flow. Open the hardware item under Service Catalog > Maintain Items, set Flow to Standard Hardware Asset Request, and save. If the field is missing from the form, add it from the form layout settings (Configure > Form layout). Teams often find this gap only after a test order runs without starting the flow, so check the saved item before handing it to requesters.
Check the saved item before handing it to requesters. The intended result is a hardware catalog item with the correct flow associated with it. Treat this as a configuration check, separate from the later work of finding stock or buying equipment. For surrounding configuration work, see Hardware Asset Management setup and configuration.
The flow coordinates sourcing, procurement, and deployment, and updates asset details as the work advances.A manual order still moves through the flow’s stages, so the flow record shows where the work stands.
Fulfill hardware asset requests manually from the requested item
Navigate to Service Catalog, select Hardware, and open the required catalog item. Set the quantity before selecting Order Now. Where the Location field is available, choose the place where the hardware should be deployed.The Location field pre-fills with the location of whoever is placing the order. When the hardware is going to another site, change it before you select Order Now, or the stock may be routed to the wrong place.
Check this behavior on your instance and release: Location is available for Hardware catalog items published from Hardware models after upgrading to Hardware Asset Management 8.0.0. Do not assume that an older catalog item will show the same field simply because another item does.
After submission, use the procurement_admin role to open the new request. Select the relevant entry in the Requested Items related list. This requested item is the point from which to inspect the flow and reach the tasks for that hardware requirement.
- Check that the selected requested item matches the hardware and quantity being fulfilled.
- Use the Flow Context related link on the Requested Item form to inspect the flow’s current stage.
- Open the Catalog Tasks related list to locate the sourcing task.
- Keep the requested item as the reference when moving between procurement and deployment work.
A request record provides the starting context, while the requested item leads to the work being performed. During a handoff, record which requested item needs attention. That gives the next fulfiller a specific record to inspect instead of a general description such as “the laptop order is stuck.”
Choose the sourcing route and follow the resulting work
Open the sourcing catalog task and select Source Request. From the Source Request form, Add Transfer Order and Add Purchase Order provide the routes for sourcing through a transfer or a purchase. Choose the route that matches where the requested hardware will come from.
As an operational decision, a transfer makes sense when suitable equipment can be moved from another stockroom. A purchase makes sense when equipment must be obtained from a vendor. Check the hardware requirement and destination before committing to either route; an order record does not by itself establish that the right equipment has reached the person who needs it.
For the inventory side of that decision, use stockroom management and hardware receiving. For work centered on buying the equipment, see ServiceNow purchase orders. These are adjacent steps in fulfillment, rather than substitutes for completing the requested item’s tasks.
For help planning this work, see ServiceNow implementation.
Handle the stockroom pick branch before deployment
After procurement, the next task depends on the source stockroom’s picking configuration. If the stockroom has Asset Pick enabled, the requested item receives an Asset pick task. If picking is not enabled there, the flow creates the Deployment task without that intermediate task.
Return to the requested item and open Catalog Tasks. When a pick task is present, complete it through the Mobile Agent application before completing the Deploy task. When picking is disabled for the source stockroom, proceed with the deployment task.
This distinction matters when a team expects an identical task list for requests sourced from different stockrooms. A missing pick task can be consistent with the stockroom configuration. Inspect the source stockroom and current flow stage before treating that difference as a failure.
Keep physical picking and final deployment as separate checkpoints in the team’s working instructions. Picking establishes that the stockroom work has been completed; deployment records the later fulfillment action. A device being available for collection is a reason to continue the sequence, rather than a reason to skip its remaining work.
Close deployment and inspect the asset outcome
Close the Deployment task to complete the deployment action in the Standard Hardware Asset Request flow.Once the deployment task closes, look at the asset record. Its State, Assigned, Installed, Location and Assigned to values should now match the handover, and the linked CI should reflect the same change.
Inspect those results against the actual handover. Check that the resulting location and assignment agree with the intended recipient and deployment destination. Use the record values you can see; do not infer success solely from an earlier sourcing action or from equipment leaving a stockroom.
The asset and its associated CI are related records with different purposes. When investigating the resulting records, Hardware Asset Management versus CMDB explains that distinction. For this request, the immediate completion check remains whether deployment finished and the linked records reflect the intended outcome.
A concise handoff note should identify the requested item, its current stage, the sourcing route, and any remaining task. At completion, include what was checked on the asset.
Investigate delays at the stage where work stopped
Start an investigation from the requested item’s Flow Context. Then compare that stage with the Catalog Tasks related list. This keeps the investigation tied to a specific piece of work: catalog setup, sourcing, picking, or deployment.
- If the expected flow is absent, check the catalog item’s saved Flow selection.
- If sourcing needs attention, open its catalog task and inspect the Source Request work.If picking is expected, open Workspaces > Hardware Asset Workspace > Inventory, select the stockroom under All stockrooms, and check that Warehouse tasks required is ticked on its Stockroom Details form.
- If deployment has finished, inspect the asset fields and associated CI rather than treating procurement as the final check.The ServiceNow Otto for Hardware Asset Management application automates parts of the hardware request process with agentic workflows. Before starting a manual sourcing task, open the requested item’s existing sourcing work so you can see what the workflow has already done. Before acting, inspect the requested item’s existing sourcing work so the team understands what has already happened. Keep automated sourcing rules separate from the human steps described here.
Questions about related request paths and handoffs
Can the Zero Touch list be used as a general queue for manual orders?
The Asset requests list under Workspaces > Hardware Asset Workspace > Asset operations > Zero touch shows requests submitted through the Zero Touch request flow. Viewing that list requires admin or asset. Establish which request path produced the order before choosing that list as your investigation starting point.
Does the enterprise asset flow use the same deployment action?The hardware procedure closes a Deployment task and then updates the asset’s State, Assigned, Installed, Location and Assigned to fields. Do not assume an enterprise asset deployment behaves the same way; check that flow on your instance before reusing its steps. Do not transplant that instruction into the hardware procedure. Keep the operating instructions aligned with the catalog item’s actual flow.
Should a team promise autonomous sourcing because manual fulfillment works?
No.Agentic sourcing depends on how the ServiceNow Otto for Hardware Asset Management application is configured on your instance, so check that configuration before you promise that future orders will source themselves. A successful manual request demonstrates the manual path; assess the agentic path separately before promising that future orders will source themselves.
What should be captured when escalating a request between teams?
Capture the requested item identifier, the observed stage, the task needing action, and the physical status of the hardware. That combination helps the next team connect the system record to the equipment without assuming that a completed procurement step means the recipient has received it.